IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.

Slides:



Advertisements
Similar presentations
IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
Advertisements

University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Welcome to CERN Accelerating Science and Innovation 2 nd March 2015 – Bidders Conference – DO-29161/EN.
RETROCOMMISSIONING AIR HANDLING SYSTEMS
DO-29161/EN Provision of Engineering Services in Heating, Ventilation and Air Conditioning for Building 107 Project R. Bozzi, M. Nonis / EN-CV.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Detector Cooling Project Thermosiphon Project Status Report
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
Update on the Laser Beam Line
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
LIU-SPS RF Power upgrade | 09 December 2015.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for non-residential buildings - Performance requirements.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
IT-4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the New Building 107 Technical Specification M. Battistin, M. Nonis /
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
EN-CV activities for LHC during LS2
CBETA Technical Review
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
BUILDING HEATING AND COOLING
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
EN-CV Progress EHN1 Extension Project
Bidder’s conference – 21st May 2013
Low temperature chiller Market Survey
X-ray Pump-Probe Instrument
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Specifications What should it cover Goods Services Warranty
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ

Introduction  Technical Contacts:  Alexandre Broche  EN-CV Projects Team  Michele Battistin  EN-CV  Commercial Contacts:  Bjorn Jenssen  FP-PI  Ivo Lobmaier  FP-PI 2

Agenda 3 8:45Welcome and registration at Building 33(A. Broche) 8:45 – 9:00Transfer to Prévessin Site (A. Broche) 9:00 – 9:05Agenda of day(A. Broche) 9:05 – 09:45Introduction to CERN and of the Technical Specification(A. Broche) 09:45 – 10:15Working on the CERN site(S. Cherault) 10:15 – 10:30Coffee break 10:30 – 11:00Presentation of commercial documents(B. Jenssen) 11:00 – 11:15Questions – Answers 11:15 – 12:30Visit of BAF3

Introduction to CERN, BAF3, and the technical specification Alexandre Broche EN-CV-PJ

Overview  Introduction to CERN  Introduction to BAF3  Tender Documents  Scope  Technical requirements  Schedule  Questions and answers 5

CERN CERN, the European Organization for Nuclear Research, is an intergovernmental organization with 20 Member States. CERN’s mission is to enable international collaboration in the field of high-energy particle physics research and to this end it designs, builds and operates particle accelerators and the associated experimental areas. 6

The CERN Sites  Entrance & deliveries in Prévessin, FRANCE  Work to be carried out in FRANCE  EN-CV – Bldg. 35  FP-PI – Bldg. 5 7

BAF3 8  In 2015 CERN constructed a new building to host a new power plant. This building will house the new 200 MHz amplifiers which are being developed as part of LIU- SPS program. The building requires the installation of dedicated (HVAC) and smoke extraction systems in  The building is a ground floor building with an internal mezzanine.  Zone 1: Mezzanine is m 3  Zone 2: Ground floor area (except control room) is m 3  Zone 3: Control room on ground floor is 500 m 3

Tender Documents 9  Technical Prescriptions  Annexes: Annex 1 – Technical Prescriptions on Ventilation Systems; Annex 2 – Technical Prescriptions for Process Controls; Annex 3 – Technical Prescriptions for Electricity; Annex 4 – CERN electrical parameters; Annex 5 – Technical Prescriptions for Identification of HVAC components; Annex 6 – Process and Instrumentation Diagram (P&ID) Ventilation Network - CV ; Annex 7 – Process and Instrumentation Diagram (P&ID) Chilled Water – CV ; Annex 8 – HVAC system - Layout and Sections – CV ; Annex 9 – Layout drawing static exhaust UAT ; Annex 10 – Layout drawing smoke extractors UAT /772; Annex 11 – Technical Prescriptions for labelling; Annex 12 – Technical Prescriptions for piping and accessories systems.

10  To design, supply, install and commission the HVACs, ductwork, smoke extraction systems, static exhaust and fan coils.  To design, supply and install the electrical cubicles  To design, supply and install all the instrumentation  To test and inspect the supply  To commission the supply with CERN Scope

PID Ventilation 11

PID Cooling 12 Part of the Supply

Technical Requirements 13  HVACs  Ductworks  Static exhaust  Smoke extractors  Instrumentation  Electrical, control, Firemen cubicles  Pipework

Schedule 14 ActivityDeadline Delivery of the documentation as described in Technical Specification §3.4.3 (Before starting material procurement) 25 th September 2015 Delivery of the documentation as described in Technical Specification §3.4.4 (Before starting on-site installation) 16 th October 2015 Delivery of the documentation as described in Technical Specification §3.4.5 (Preparation of PLC control system software file) 13 th November 2015 Start of the installation01 st March 2016 Supply ready for commissioning as described in Technical Specification §3.4.6 (Before software implementation) 13 th May 2016 End of supply commissioning with CERN10 th June 2016 Delivery of the documentation described in Technical Specification §3.4.7 (Prior to acceptance) 01 th July 2016 Acceptance Technical Specification §4.622 nd July 2016

Questions and answers Questions ? 15