W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Jay Hauser, Fermilab Director’s Review, Apr. 30, CSC Muon Trigger Jay Hauser Director’s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
Sector Processor Status Report
TELL1 A common data acquisition board for LHCb
Plans for the 2004 CSC Beam Test
Presentation transcript:

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager May 10, 2002 Outline: Calorimeter Trigger Status & Plans Muon Trigger Status & Plans DAQ Status & Plans (from Vivian O’Dell) This talk is available on:

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 2 L1 Trigger Hardware Overview US CMS Trigger (this talk) US CMS

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 3 Calorimeter Trig.Overview

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 4 Front Rear VME Slots DC-DC Conv Cal. Trig 2nd Gen. Prototypes (U. Wisconsin) New High-Speed Backplane 160 MHz with 0.4 Tbit/sec dataflow Designed to incorporate algorithm changes New Non-Isolated Electron, Tau & Jet Triggers New Clock & Control Card Fans out 160 MHz clock & adjusts phases for all boards 50% tested successfully Clock delay adjust DC-DC Converters

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 5 8 Compact Mezzanine Cards for each Receiver Card accept 4 x 20 m 1.2-Gbaud copper pairs transmitting 2 cal. tower energies every 25 ns with low cost & power. Uses new Vitesse Link Chips ( ). New Serial Link Test Card Status: under test New Cal. Trig. 4 Gbaud Copper Link Cards & Tester (U. Wisconsin)

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 6 New Calorimeter Trigger Receiver Card (U. Wisconsin) Top side with 1 of 8 mezzanine cards & 2 of 3 Adder ASICs DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Bottom side with all Phase & Boundary Scan ASICs Full featured final prototype board is in test - initial results are good. Continue to test on-board ASICs & copper link mezzanine cards

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 7 Cal. Trig. New Electron Isolation & Jet/Summary Cards (Wisconsin) Full featured final E.I. Proto. board is finished & ready for testing. E.I. Proto will test Electron Isolation ASICs & Sort ASICs JSC Proto. ready to build pending tests of other boards EISO SORT ASICs EISO

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 8 Cal Trigger Status/Plans Preparing second generation prototype tests Crate, Backplane, Clock & Control, ASICs done Receiver Card & Electron Isolation Card ready. Serial Link Mezzanine Card Receiver done, Tester Card at vendor, Transmitter Tester in design Goals for 2002 Complete of prototype tests, validate ASICs Integrate Serial Links w/ECAL,HCAL front-ends Prototype Jet/Summary card manufacture Ready for manufacture -- waiting for other board tests Finalize Jet Cluster crate design

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 9 Strip FE cards Wire FE cards Muon Port Card (Rice) MPC Sector Receiver/ Processor (U. Florida) OPTICAL SR/SP SP CSC Muon Sorter (Rice) Global  Trigger DTRPC FE Global L1 2  / chamber 3  / port card 3  / sector 44 44 44 44 LCT Trigger Motherboard (UCLA) Wire LCT card In counting house TMB LCT RPC Interface Module RIM On-Chamber Trigger Primitives 3-D Track-Finding and Measurement Combination of all 3 Muon Systems CSC Muon Trigger Scheme

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 10 1st Muon Trigger Prototypes (Florida, Rice, UCLA) Successful CSC Trigger Integration test Prototype Muon Port Card, Sector Receiver, Sector Processor, Clock Board, Backplane work & communicate -- Result in 2000 ORCA full simulation working Agreement/use with hardware test

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 11 1st Track-Finder Crate Tests Sector Processor (Florida) Sector Receiver (UCLA) Clock Control Board (Rice) Bit3 VME Interface CustomBackplane(Florida) Muon Port Card (Rice) 100m optical fibers Very successful but latency too high -- New design in 2001 Prototype crate for original six crate design

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 12 Single Track-Finder Crate Design with 1.6 Gbit/s optical links Reduces processing time from 525 ns (old design) to 175 ns Total Latency ~ 20 Bx (from input of SR/SP card to output of MS card) Crate Power Consumption ~ 500 W 15 Optical connections per SR/SP card Custom Backplane for SR/SP  CCB and MS connection New EMU Trigger Design: U. Florida Track-Finder SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP CCB BIT3 Controller SR/SP Card (3 Sector Receivers + Sector Processor) (60  sector) Clock and Control Board Muon Sorter To Global Trigger From Trigger Timing & Control From MPC (chamber 4) From MPC (chamber 3) From MPC (chamber 2) From MPC (chamber 1B) From MPC (chamber 1A) To DAQ MS

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 13 VME J1 CONNECTOR CUSTOM PERIPHERAL BACKPLANE 9U * 400 MM BOARD OPTICAL TRANSCEIVERS SERIALIZERS CCB INTERFACE SORTER LOGIC INPUT AND OUTPUT FIFO VME INTERFACE 3 OPTICAL CABLES TO SECTOR PROCESSOR TMB_1 TMB_2 TMB_3 TMB_4 TMB_5 TMB_6 TMB_7 TMB_8 TMB_9 SER OPTO GTLP TRANSCEIVERS FPGA New Muon Port Card Design & Optical Link Tests (Rice) New MPC Design uses new high speed links (TLK2501) to send one muon per optical fiber (needed for new compact track-finder design) Optical Link Radiation Tests: Three serializers: up to 270 kRad TID. No permanent damage or SEU Two Finisar optical modules: No errors up to 70 kRad. Failed at 70kRad (well above ~10 kRad TID inner CSC dose for 10 years)

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 14 CSC Trigger Status/Plans Prototype 1 tests now complete Prototype 2 and production follow EMU components to optimize technology MPC, SP, CCC modules, backplane* milestones: Apr-02 Prototype 2 designs done Freeze CSC-DT interface Determine DDU compatibility with OSU module for EMU Nov-02 Prototype 2 construction done Apr-03 Prototype 2 testing done Sep-03 Final designs done Oct-04 Production done Apr-05 Installation done (*backplane schedule ~3 months ahead of above dates to provide platform for testing and integration) Muon Sorter module: only 1, design by Jan-04

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 15 Schedule: Trigger Project Completion Installation in Underground Counting Room Expect access by March ‘05 Sufficient time for installation and some testing but not for completing commissioning with detectors Slice Test (on surface) With both HCAL and EMU Verify trigger functions and interfaces by testing with detectors on surface at CERN. Suggest as substitute for commissioning completion step. Will check as much on surface before gaining access to underground facilities. Planned for October ‘04 - March ‘05 Underground Counting Room

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 16 Original Trigger L2 Task Schedule & Updates Tasksoriginal startfinish new Produce TDR8/0012/004 Design Final Prototypes11/0012/014 Construct Final Prototypes6/016/02  11/02 Test/Integrate Final Prototypes12/0112/02  4/03 Pre-Production Design & Test6/026/03  11/03 Production12/026/04 Production Test6/0311/04 Trigger System Tests5/045/05 "Slice Test" NEW10/043/05 Trigger Installation3/059/05 Integration & Test w/DAQ & FE6/0512/05 Maintenance & Operations10/ months civil engineering delay of installation date

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 17 DAQ System Overview Computing Services 16 Million channels ChargeTimePattern 40 MHz COLLISION RATE 75 kHz 1 MB EVENT DATA 1 Terabit/s READOUT 50,000 data channels 200 GB buffers ~ 400 Readout memories 3 Gigacell buffers 500 Gigabit/s 5 TeraFlps ~ 400 CPU farms Gigabit/s SERVICE LAN Petabyte ARCHIVE EnergyTracks 100 Hz FILTERED EVENT EVENT BUILDER. A large switching network ( ports) with total throughput ~ 400Gbit/s forms the interconnection between the sources (deep buffers) and the destinations (buffers before farm CPUs). EVENT FILTER. A set of high performance commercial processors organized into many farms convenient for on-line and off-line applications. SWITCH NETWORK LEVEL-1 TRIGGER DETECTOR CHANNELS Original design: 100 kHz Rescope: 1997: 75kHz 2001: Initial 50 kHz But design all elements to be able to do 100 kHz

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 18 New DAQ design: principle Basic principle: Break DAQ into a number of functionally identical, parallel, smaller DAQ systems A 64x64 system is feasible today

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 19 Detector readout to surface

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 20 D2S + RB + EF breakdown Readout Builder Event Filter Data to Surface

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 21 US: Event Manager + Builder Units DAQ: US contribution (old) Builder Networks Event Manager Detector Front-end Computing Services Readout Systems Builder and Filter Systems Level 1 Trigger Run Control BU FU CERN: Inputs(500) + Switch US: Outputs + EVM Other responsibilities: Detector Front-Ends: detector groups Computing Services: infrastructure US Filter Units not included in “outputs”

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 22 US contribution: new Cover one segment (1/8) of the CMS DAQ plus ¼ of the Data-to-Surface system (plus the associated prototypes – “preseries”) Segment: 1 Readout Builder + 1 Event Filter US_CMS detector electronics is ~1/4 of the total Delivery of the system can be accomplished by the end of the US_CMS project (FY05) Aids the experiment most in the current phase where cash flow is very tight US R&D program can remain ~ unchanged (to the extent that the basic modules are the same) Roughly speaking, the US (a) works on/delivers prototype system (to 2004) (b) delivers the “startup DAQ” for CMS (2005)

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 23 Milestones*Milestones* Prototype DAQ (US Contribution) D2S Prototype July, 2004 “Slice Test”November, 2004 (*) Readout Builder PrototypeApril, 2005 Startup DAQ (US Contribution) Filter Farm ReadyMay, 2006 Readout Builder ReadyAugust, 2006 Declaration of Completion (US Contribution) Startup DAQ ready for beamSeptember, 2006 (*) “Slice” Test for US-CMS detectors – DAQ will have full D2S proto + a few RB elements *(Version 33)

W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 24 Slice Test DAQ ( Hz) Trigger systemGTP, TTC and sTTS Detector readoutComplete FED crate systems (FED-TTC-TTS, Controller CPU+DSN) Readout Units XDAQ RU-VME-tasks running in all the FED controllers Data to SurfaceNone just the FED-VME bus of FED crates RCN, BCN, BDN networksDAQ Service Network (DSN e.g. GEthernet) Event managerXDAQ EVM-task running in the GTP controller Builder/Filter UnitsXDAQ BU-task running in any DSN(WAN) CPU PerformancesFew 10 Hz (up to 100s when using GE switches in DSN as EVB)