LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.

Slides:



Advertisements
Similar presentations
Protection study options for HQ01e-3 Tiina Salmi QXF meeting, 27 Nov 2012.
Advertisements

Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IR Quad Heaters.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
E. Todesco HL-LHC: OUTLOOK ON PROTECTION FOR IR MAGNETS (WP3) E. Todesco CERN, Geneva Switzerland CERN, 23 rd April 2015 MPE meeting.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
BNL - FNAL - LBNL - SLAC LQ Test and Future Plans Giorgio Ambrosio, Guram Chlachidize Fermilab LARP Collaboration Meeting 13 Port Jefferson Nov. 4-6, 2009.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HQ01e3 test summary December 2012 M. Marchevsky, LBNL.
Test Program and Results Guram Chlachidze for FNAL-CERN Collaboration September 26-27, 2012 Outline Test program Quench Performance Quench Protection Magnetic.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
1 QXF / SQXF heater design update M. Marchevsky (12/03/13)
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
MQXFSM1 results Guram Chlachidze Stoyan Stoynev 10 June 2015LARP meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
HQ02 TEST STATUS April 4, 2013 FERMILAB. Test status  Magnet delivery to FermilabApr. 02  SG checkoutApr. 04  LE & RE interface plate mounting Apr.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
Test of QD0 Riccardo Musenich INFN-Genova SuperB 2 nd Collaboration Meeting Frascati, December
LQ Test Results and Next Steps 1 st HiLumi LHC/LARP Collaboration Meeting CERN, November 2011 Guram Chlachidze.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Mike Anerella December 17, 2013
11T Magnet Test Plan Guram Chlachidze
Model magnet test results at FNAL
Powering the LHC Magnets
HO Corrector Magnets: decapole test and future plans
HQ01e-3 magnetic measurements
MBHSP02 test STATUS and first results
Quench Protection Measurements & Analysis
MQXF updates P. Ferracin October 9th, 2014.
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Detection thresholds in LARP Magnets
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
as a prototype for Super c-tau factory
MQXFS1e – PH-to-Coil hipot tests
Hi-pot results summary
Presentation transcript:

LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010

Outline Test requirements for the long HQ (consider two cases, 3.3 m coil length - same as LQ - and 4 m coil length): possible facilities and required upgrades. Large diameter probes for field quality measurements: probe fabrication, anti-cryostat/header modifications, possibility to perform measurements in LHe Magnet protection from shorts/ground faults Electrical QA: status, analysis, etc. Quench Detection AOB

Test requirements for the long HQ: possible facilities and required upgrades Facilities (FNAL, BNL and CERN) 3.3-m long HQ coils  Fermilab: No upgrades are required for testing from 4.5K to 2.5K. Lambda plate is necessary for 1.9K test. New warm bore is required for magnetic measurements  BNL: PS  CERN: Test facility will be ready by March-April 2011 Cryostat working at K range 20 kA power supply Commissioning of DAQ and control systems

Test requirements for the long HQ: possible facilities and required upgrades (cont’d) 4-m long HQ coils  BNL  CERN : Test facility will be ready by March-April 2011 Possible Upgrades Fermilab:  “Lambda plate” for 30kA top plate  New warm finger with 90-mm outer and 70-mm inner diameter (estimated cost ~ 20k$, 5-6 months from order placement) BNL: CERN:

Large diameter probes for field quality measurements What is a reference radius for magnetic measurements?  CERN asking for 95-mm of free bore diameter ? Define magnetic zone length  Non-connection end, straight part, layer jump, connection end Large diameter probes  Fermilab: Currently using probes have a reference diameter of 46 mm New PC board based probes with various reference radius and length are fabricated (low cost). Fabrication of new tangential coils will be much more expensive and time consuming  BNL:

Large diameter probes for field quality measurements (cont’d) Large diameter probes  CERN Anti-cryostat/Header modifications  Fermilab Need new warm bore Maximum outer/inner diameter is 90-mm/70-mm Need to build new header, lambda plate and warm bore if more than 90-mm reference diameter is required Test in LHe

Magnet protection from shorts/ground faults Fermilab Symmetric coil (and heater) grounding  The maximum coil to ground voltage reduced by factor of 2  Ground current through the fault was significantly reduced (from 40 A to about 3 A)

Magnet protection from shorts/ground faults (cont’d) Fermilab: Active coil ground fault detection  Isolated 5 V voltage source connected in series with the ground resistor  Voltage drop develop across the ground resistor (100-Ohm) in case of coil to ground short  “Always armed”  Should not depend on power supply voltage and magnet inductance  Is equally sensitive to ground fault at different locations

Magnet protection from shorts/ground faults (cont’d) Fermilab  Plan to implement an active heater ground fault system too  Ready to share experience BNL:  Plans for the ground fault detection CERN:

Electrical QA: status, analysis, etc. Pulse test  Test procedure  Maximum voltage for the test Initial and after test Hipots  Fermilab performs Hipot at 1.9K too after first few quenches.

Quench Detection Fermilab  FPGA based quench management system was implemented in addition to the existed VME based system  Difference of the Half-coil signals are mainly used for quench detection  Current dependent thresholds implemented for the Half-coil signal modules both in VME and FPGA based systems  Whole-coil signal also triggers quench BNL CERN

What else ? Documentation: Fermilab  Magnet description