Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.

Slides:



Advertisements
Similar presentations
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Advertisements

Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Nick Walker KEK-DESY meeting 7 th March 2005.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Nick Walker Marc Ross Akira Yamamoto ALCPG’11 Eugene Oregon GDE Project Management Summary ALCPG Eugene, Nick Walker 1.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Marc Ross Nick Walker Akira Yamamoto 1 st PAC Meeting 19 th October, 2008 Machine Design & Cost Reduction Activities 1.
14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Nick Walker for the Project Management ILC AD&I: Introduction and Overview.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
AAP Review Oxford, January Introduction to SB2009 Nick Walker Marc Ross Akira Yamamoto.
Global Design Effort RTML KOM Close-out Ross, Walker.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Baseline Technical Review – Central Region Accelerator Systems
Oct 22 Group Leaders Planning meeting
Barry Barish LCWS10 - Beijing 26-March-10
Status and Plan of GDE Design Work (Including Road Map for RDR)
ILC Global Design Effort
Electron Source Configuration
Barry Barish LCWS10 - Beijing 26-March-10
Nick Walker for the Project Management
Barry Barish JSPS - Sendai 12-Sept-11
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones

2010 – A Year of Transition Phase 1 ends – Phase 2 begins –This is our last meeting in Phase 1 Seamless transition –No major re-structuring etc. Adiabatic “shift in emphasis” needed –Beginning plan for producing TDR (end 2012) –Consolidation (results) of risk mitigating R&D –Collider design work → updated cost estimate –Documentation! A good opportunity to take stock and review where we are

TD Phase Goals – A Reminder TDR deliverables: –Results from Risk Mitigating R&D –Updated Reference Design –Updated VALUE estimate –Project Implementation Plan General Goals –Risk Mitigating R&D Main Linac SCRF [gradient, cavity yield, mass-production and industrialisation] Beam Test Facilities [ATF/ATF2, CESRTA, TTF/FLASH, DAPHNE…] Sources… –Accelerator Design & Integration Integrated, robust and simplified design Cost containment

Where do we stand? Published milestones in R&D Plan –Pay attention! Part of Workshop Charge: Review these milestones & goals –Expect status report as part of WG summaries PM are planning major update for Release 5 –Due June 2010 –Your input will be required

Collider Design Work (ADI) ✔ ✔ Impact of re-baseline delay requires schedule review

Collider Design Work (ADI) ✔ ✔ CC process Impact of re-baseline delay requires schedule review

Collider Design Work (ADI) ✔ ✔ CC process Impact of re-baseline delay requires schedule review

R&D: SCRF ✔ ? CC process Required: strategy and plans for producing an updated cryomodule cost (early 2012?)

R&D: SCRF HLRF Milestones for RDR Alternatives: –Marx modulator development / demonstration2010 –Demonstration of circulator-less distribution2010 system (with VTO) Klystron Cluster System (KCS) –Initial high-power tests of WG components2010 –EM modelling of components (VTO etc)2010 –FMEA / operations study2010 –Full-power tests of WG components2012 Distributed RF System (DRFS) –Prototype of 700kW Mod. Anode Klystron2010 –Prototype of Mod. Anode Modulator2010 –Design for manufacture (cost!)2012 –MAK/MAM lifetime demonstration2012

R&D: SCRF HLRF Milestones for RDR Alternatives: –Marx modulator development / demonstration2010 –Demonstration of circulator-less distribution2010 system (with VTO) Klystron Cluster System (KCS) –Initial high-power tests of WG components2010 –EM modelling of components (VTO etc)2010 –FMEA / operations study2010 –Full-power tests of WG components2012 Distributed RF System (DRFS) –Prototype of 700kW Mod. Anode Klystron2010 –Prototype of Mod. Anode Modulator2010 –Design for manufacture (cost!)2012 –MAK/MAM lifetime demonstration2012 → CC (re-baseline)

R&D: SCRF HLRF Milestones for RDR Alternatives: –Marx modulator development / demonstration2010 –Demonstration of circulator-less distribution2010 system (with VTO) Klystron Cluster System (KCS) –Initial high-power tests of WG components2010 –EM modelling of components (VTO etc)2010 –FMEA / operations study2010 –Full-power tests of WG components2012 Distributed RF System (DRFS) –Prototype of 700kW Mod. Anode Klystron2010 –Prototype of Mod. Anode Modulator2010 –Design for manufacture (cost!)2012 –MAK/MAM lifetime demonstration2012 → CC (re-baseline) ?

Accelerator Systems R&D Electron Source: –Proof of principle system2008 (?) –Reliable 200 kV load-locked gun prototype2009 (?) –Prototype laser system2010 –Generation of beam with ILC spec.2010 –Reliable 350 kV load-locked gun prototype2011 Required: plans for polarised cathode fundamental R&D

Accelerator Systems R&D Positron Source: –SC Helical undulator prototype2009 ✔ –Feasibility studies and design of a high-field2009 (2010) flux concentrator –Feasibility study and design of a lithium lens2010 with possible beam tests –Engineering design of rotating target system2010 with appropriate lifetime –Feasibility studies and beam tests of2010 liquid Pb target –Feasibility studies and beam tests of2010 a hybrid crystal target In addition: SB2009 parameters/specifications and associated ADI work → CC (re-baseline)

Accelerator Systems R&D Damping Ring – ATF: –Demonstration of 2pm vertical emittance2010 Damping Ring - DA  NE –Fast kicker demonstrations2010 Damping Ring – CesrTA: –Reconfiguration of machine2008 ✔ incl. instrumentation and test sections; First measurements of ecloud building up. –Reduced emittance operation;2009 ✔ e-cloud build-up in wiggler chambers –Characterisation of e-cloud build-up and2010 instability thresholds as a function of low vertical emittance (≤20 pm) Final recommendations on e+ DR configuration (including possible 3km ring) → CC (re-baseline)

Accelerator Systems R&D RTML –Experimental demonstration of the bunch2011 compressor RF phase stability, and beam-(FLASH) loading compensation –Results of beam dynamics simulation,2010? demonstrating the required emittance tuning techniques Further studies of single-stage compressor option for SB2009 (compression limits)

Accelerator Systems R&D BDS– ATF2: –Demonstration of design beam size2010 –Demonstration of the beam stability2012 –Evaluation of performance of SC FD and permanent magnet FD2012 BDS –Demonstration of the required phase? stability of the prototype crab cavity system Many other ADI related studies listed in Appendix B

Accelerator Systems R&D Simulation: –Answers to critical beam-dynamics questions arising during the TD Phase (engineering driven) –Overall (simulated) demonstration of emittance preservation from the Damping Rings to the interaction point –Modelling of halo generation, transport and collimation –Software tools (simulation codes) Specific studies resulting from SB2009 studies to be defined → CC (re-baseline)

CFS Focus has been on ADI (SB2009) in 2009 Schedule needs re-work for proposed CC (re-baseline)

Planning for the TDR Risk Mitigating R&D Re-Baseline (CC) AD&I SCRF CFS Update VALUE estimate Document baseline Write TDR report(s) More detail required Definition of milestones & critical path AD&I, SCRF and CFS are focus activities and need definition

TDR – what is it? Provides traceability Released documentation All relevant design documentation over next two years Provides traceability Released documentation All relevant design documentation over next two years

Two Imminent Reports TD Phase Interim Report –To be published ~July 2010 –General status report –Terse! –Upbeat publication (outreach) Photos Results.. TD Phase R&D Plan Release 5 –To be published in June 2010 Resource tables update in May for FALC RG –More detailed planning for TD Phase 2 –Major update (re-write) expected Main report body – PMs Appendix B sections – TAG leaders Considerable amount of work which will require careful planning.

This Workshop What’s expected from the WG –Review of the R&D status (esp. R&D Plan milestones) –How will R&D results factor into ILC baseline? And when? –ADI activities – how mature are the current designs Special attention to SB2009 themes Catalogue outstanding decisions What remains to be done for the TDR? –Overall planning and milestone updates R&D plan release What’s expected from the PMs –Better defined overall schedule and goals (2010+) –Change control procedure (SB2009) –Outline for Interim Report –Schedule/requirements for R&D Plan Update Detailed planning (action items) for next 6 months → October GDE meeting (Geneva) Top-level planning towards TDR