ISOLDE: Status report building 508 68th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.

Slides:



Advertisements
Similar presentations
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Advertisements

Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
Cristiana Colloca GS/SEM – ATOP – MARCH 2009 Infrastructure Consolidation of Accelerators Injectors (civil engineering) Cristiana Colloca GS/SEM – ATOP.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
The Next Generation of a Gamma Irradiation Facility GIF++
CMS Centre Project - Green Light Meeting
PRR Activation Meeting
East Hall under construction
AD consolidation activities in LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Target and Horn status report
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
HL Consolidation Day Analysis of needs from BE-ICS
SPS activities during LS2 TE-EPC (Power Converter Group)
East Hall under construction
HIE-ISOLDE Project: Planning & Resources
Magdalena Kowalska, CERN PH-SME-IS
UNION GROVE ELEMENTARY REFERENDUM
RDR Baseline Layouts for Interaction Region
Present and Future test facilities for High-intensity Targetry CERN
A. Herlert, CERN PH-SME-IS
East Hall under construction
Presentation transcript:

ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling

2 Outline Status new building 508: –Progress on the demolishing / construction –What has changed in terms of building and layout –Progress on infrastructure –Costs and timeline

3 Progress Progress during the summer after the removal of all equipment and items inside: -Desamiantage – treatment of the asbestos parts in roof and floor 115, 601 -Declassification of 115 and 507 -Change of the access point -Demolishing of 115, 601 and 507 -Demolishing of the 507 floor

4 Changes A few things have changed for the construction and layout of the new building 508: -On the first floor extra space for a new Isolde Control Room has been added (outside the classified area) Advantages: - Outside the classified area but still on the facility’s site - Ergonomic: daylight, windows to the outside - Enhances contact between users (DAQ rooms) and machine supervisors - Next to possible future TSR storage ring (commissioning and operations) -The building will be a light structure, not modular cabins - Due to high pricing for non-standard cabins - Class C lab and T30 fire retarding material - New drawings structure done – re-designed concrete floor construction starts this week Building 508 layout: The new building 508 will be replacing the old user building 507, 601 and workshop/solid state lab 115. Light metal structure with 2 concrete floors: Total surface 864m2 Ground floor (only accessible from within the classified area): 432 m2 - Solid state, Laser labs and workshop First floor (accessible from outside the classified area): 432m2 - Data Acquisition rooms - Meeting room/Visitors Center - Kitchen - Isolde Control Room

5 New user facilities building 508 (replacing 507, 115, 601) Target zone and separators area ISOLDE experimental hall Reserved for TSR 508 New ISOLDE Control Room, 1 st floor 508 Present ISOLDE Control Room, basement 197 water station New building 508

6 Layout 508 Ground floor B508: Controlled Access ground floor and Isolde hall Access 1 st floor

7 Layout 508 1st floor B508: Access 1 st floor Courtesy Eliseo Perez-Duenas GS/SE

8 Infrastructure 508 Infrastructure: -Needs for the users have/are being collected by Magda Kowalska -Implementation by the different groups ongoing (EL, CV, IT) -Finalized plans with regard to infrastructure to be ready asap (not as urgent as for the modular cabin solution) Courtesy Magda Kowalska

9 Costs: -Total costs light structure building 508 (incl. ICR & services): 1.8MCHF Includes Infrastructure: Cooling & Ventilation 300kCHF (estimate) Electrical: <200kCHF -Approved budget: 600kCHF for consolidation 350kCHF for LS1 400kCHF by PH dept. 1.35MCHF (without control room) -Covered: New Isolde Control room: 185 kCHF by BE dept. Extra costs light structure building: 200kCHF by GS dept.(to be confirmed) 385kCHF -To obtain: =65kCHF Timeline: -Concrete floor as of end October till end November2013 -Building ready end February Infrastructure ready end March Installations users as of April Milestone: Protons to Isolde.. July 2014 (?) Costs and Timeline