21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, 2012 21: Flight Software Peter R Harvey Mars Atmosphere.

Slides:



Advertisements
Similar presentations
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
1 PFP MSR, 8/21/2012 Particles and Fields Package Monthly Status Review (MSR) August 21, 2012 Dave Curtis, PFP PM.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
1Sep 30-Oct 1, 2009EFW I-CDR Instrument Critical Design Review EFW Flight Software Peter R. Harvey 2009 Aug 31 RBSP Radiation Belt Storm Probes RBSP Radiation.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Flight Software Overview
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: #
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
11-1 MAVEN PFP ICDR May 23-25, 2011 PF Flight Software Critical Design Review May , 2011 Peter R Harvey Mars Atmosphere and Volatile EvolutioN (MAVEN)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
NCKU_UCB_TohokuISUAL-IFR : DCM (version 2.0) July 9, 2001Tong-Long Fu 1 Data Compression Module ( DCM ) Tong-Long Fu Laboratory of RF-MW Photonics, Department.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review RFAs and Recommendations Peter R. Harvey.
Operational Flight Software
Operational Flight Software
Simulink Interface Layer (SIL)
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Command & Data Handling
Critical Design Review
University of California - Berkeley
I&T&C Organization Chart
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
GLAST Large Area Telescope:
Acceptance Test Review
Electrical Ground Support Equipment Verification Test Support
CubeSat vs. Science Instrument Complexity
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
Presentation transcript:

21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission

21-2 MAVEN IPSR October 30,31, 2012 FSW Design Overview Development Plan : MAVEN_PF_SYS_008A Processor : 16 MHz Coldfire IP, Language: C Memory : 32K PROM, 256K EEPROM, 3 MB SRAM, 8 GB Flash Deliveries: Boot, Operational, HFS Requirements: 66 (Boot), 207 (Operational) SLOC : ~3777 in 11 modules (Boot), in 19 modules (Op) RTS, LMs, Moments: ~5500 SLOC, ~4054 Commands Test Software: 245 Scripts/Programs, more than SLOC Major Functional Requirements: – Command Reception & Distribution – 381 commands – Relative Time Command Sequences – 64 4Hz processing each – Engineering Housekeeping Telemetry – 13 APIDs, 28 Tables – On-Board Limit Monitoring, Fault Response – 128 limits checked at 4 secs – Real-Time Data Collection and Playback – 2.4 Mbps in, up to 37 kbps out – Archive Data Collection and Playback – 4 Mbps read/write concurrent – Data Compression - ~360 kbps on Real-Time and Archive Playback packets – Controllers for Six Science Instruments – 66 APIDs, 17 LUTs – High Voltage Controls – 6 HV Ramps concurrent – Attenuator Controls – 5 Actuators, 3 Automatic, All Concurrent – Fault Protection – 8 Alerts, 6 Enables, 3 Apertures, 3 HV, 3 Power Switches

21-3 MAVEN IPSR October 30,31, 2012 Development Status Software Products: Boot FSW (PROM) Build Plan Build1 : Support ETU DCB Test, S/C Interface tests Build2 : Updated, Built for Flight Unit PROM Operational FSW (EEPROM) Build1 : Support S/C Interface, ETU Instrument I&T Build2 : Support Storage Capabilities, Onboard Data Processing, FLT I&T Build3 : Updated, Built for Flight EEPROM Command and Telemetry Database FSW Simulations FSW Test Scripts (ETU) (CPT and LDS) Software Testing: Development used Simulation, DVF computer and ETU system Version 2.0 (Operational) FSW has supported PF tests with instruments since Nov 2011 Version 2.0 delivered to Lockheed Martin in High Fidelity Simulator Jan 2012 Version 2.6 delivered to LM Aug 2012 Version 2.6 used to support PF EMC Testing Sep 2012 Version 3.0 includes Moment Calculations and Pitch Angle Distributions (CPT)  Version 3.1 includes PF I&T mods as needed. (Delivery Version.)

21-4 MAVEN IPSR October 30,31, 2012 FSW Reviews/Actions Matrix showing successful completion of the following reviews: Software Requirements Review (SwRR) – Completed 4/28/2010 Software Preliminary Design Review (SwPDR) – Completed 5/12/2010 Instrument Preliminary Design Review (iPDR) – Completed 6/14/2010 Software Critical Design Review (SwCDR) – Completed 5/09/2011 Instrument Critical Design Review (iCDR) – Completed 5/23/2011 Boot FSW Software Test Readiness Review (SwATRR)- Completed 8/9/2011 Software Code Walkthru Review (SwCW)- Completed 8/26/2011 Software Fault Protection Review (SwFP)- Completed 8/26/2011 Software Test Readiness Review (SwATR)- Completed 9/30/2011 Instrument Pre Environmental Review (iPER) – Completed 5/22/2012 Operational FSW Software Code Walkthru Review (SwCW Core)- Completed 9/18/2012 Software Code Walkthru Review (SwCW Inst1 )- Completed 9/30/2012 Software Code Walkthru Review (SwCW Inst2 )- Completed10/04/2012 Software Test Readiness Review (SwATRR)- Completed 10/15/2012 Software Test Review (SwATR)- Est week of 10/29/2012 Integration into Flight PFDPU – Est 11/06/2012

21-5 MAVEN IPSR October 30,31, 2012 FSW Reports/Inspections/Docs Software Inspection/Peer Review Reports MAVEN_PF_FSW_031A_Inspection.pdf Software Acceptance Test Reports MAVEN_PF_FSW_032_LDS_ pdf MAVEN_PF_FSW_030_CPT_ pdf MAVEN_PF_FSW_027_VDD_V301.pdf  Software Documents  MAVEN_PF_FSW_004_SAD (Description)  MAVEN_PF_FSW_007_SUM (User Manual) MAVEN_PF_FSW_008_SMP (Maintenance Plan)

21-6 MAVEN IPSR October 30,31, 2012 FSW Schedule Integration w/ FLT PFDPU

21-7 MAVEN IPSR October 30,31, 2012 Requirement Verification Summary of changes to Software Requirements Specification 220 Level 5 Requirements changes (Boot & Operational Code) (There are 275 Level 5 requirements) Requirements Verification Matrix (RVM) MAVEN_PF_FSW_002_SRS_Tables.xls, L5a Column K (Boot) MAVEN_PF_FSW_002_SRS_Tables.xls, L5b Column K (Operational) Version Description Document (VDD) of the final software Product MAVEN_PF_FSW_027_VDD_V301.doc Status of Outstanding Problem Reports There is 1 outstanding Problem report against V2.6n Insufficient resources to repeat this configuration for diagnosis. Thus, Operational Code has 17 of 18 Closed SPRs