PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management.

Slides:



Advertisements
Similar presentations
Slide 1 Configuration Management. Slide 2 Goal – Primary Objective To provide a logical model of the IT infrastructure by identifying,controlling, maintaining.
Advertisements

HEAT TRACING SPECIALIST
Project Scope Management
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
Stepan Potiyenko ISS Sr.SW Developer.
Chapter 5: Project Scope Management
Software Configuration Management (SCM)
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Configuration Management
Systems Engineering Management
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Introduction to Software Testing
Configuration Management
Project Execution.
Software Configuration Management
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
Release & Deployment ITIL Version 3
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
Introduction to Software Quality Assurance (SQA)
Software Engineering Term Paper
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Software Configuration Management
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
From Research Prototype to Production
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
1 Digital I&C Systems Configuration Management Presented By: David E Woods Senior Engineer – Electrical/I&C Design Engineering June 21, 2011.
1 Configuration Management “The Cookbook Approach”
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Requirements Traceability: Planning, Tracking and Managing Requirements Presenter: Paula R. Maychruk, BV/TEd., CAPM, CBAP.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
1 Information Handover at UniStar Lessons Learned Presented By: Bob Renuart UniStar.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Westinghouse/Southern/SCANA – New Build Configuration Management
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
John Maciejewski INPO I am John Maciejewski
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Configuration Management
Evaluating Configuration Management
Review of the processes released in the framework of the MMP Goran Perinić.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
2006 CMBG Conference Mike Stout Spescom Software, Inc. Configuration Management For The Next Generation.
Software Configuration Management (SCM)
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
CM-101 Configuration Management Fundamentals
Configuration Management
Software Engineering (CSI 321)
Software and Systems Integration
Chapter 18 Maintaining Information Systems
(Additional materials)
Development Projects / Analysis Projects / On-site Service Projects
Software Requirements
Introduction to Software Testing
Vogtle 3&4 Configuration Management
STP Units 3 & 4 Configuration Management
Reducing Managed Facility Configuration Information
Baseline – IEEE definition
Chapter 11: Software Configuration Management
Jim Powers - Director, Fleet Engineering
Configuration Management
I&C requirements and configuration management
Presentation transcript:

PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management South Texas Project Friday, October 30, 2015

PAGE 2 New Plant - CM

PAGE 3 New Plant - CM Using CM principles, lessons learned from the current generation, and the latest Information Management tools, develop the foundation for a state-of-the-art CM system that will meet both requirements and end- user needs for the life cycle of the facility

PAGE 4 New Plant - CM How do we get it? Issue CM Policy 1.Establish Executive Management Support 2. Apply to Owner & EPC 3. Issue in COLA/Design Phase

PAGE 5 New Plant - CM Develop CM Program 1.Owner Developed w/end user in mind 2.2 Phase Approach Pre-Operational Phase Operational Phase 3.Apply Pre-Operational Phase to Owner & EPC 4.Implement early in Design Phase 5.Provide definition and implementing functions How do we get it?

PAGE 6 New Plant - CM 1 Conceptual Design - COLA 2 Define Major Components 3 Develop Final Design 4 Construct/ Refine 5 Test/ Turnover 6 Operate Maintain Repair CM Program Functions Pre-Operational CM Program

PAGE 7 New Plant - CM 1.Definition/Objectives 2.Ownership/Organization/Training 3.Identification 4.Change Control 5.CIMS 6.Verification and Audits CM Program Functions

PAGE 8 New Plant - CM CM is a set of processes, practices and tools for establishing and maintaining the design integrity of a facility throughout its life cycle. CMP Function - Definition

PAGE 9 New Plant - CM 1.Establish and Maintain Conformance between CM elements CMP Function - Objectives

PAGE 10 New Plant - CM = = = REQUIREMENTS PHYSICAL PLANT/ SIMULATOR INFORMATION CM PEOPLE PROCESSES PROGRAMS PROCEDURES FSAR Tech Specs Design Basis CM- Objective

PAGE 11 New Plant - CM 2.Provide valid and timely configuration information to users in an efficient manner. CMP Function - Objectives

PAGE 12 New Plant - CM Training  Procedures  Simulator Updates  Plant Drawings    Maintenance  Procedures  Drawings  Vendor Manuals  Material Substitution     Parts  Procurement  Specifications  Material Lists  Spare Parts    Engineering  Design Basis Documents  Calculations  Design Drawings  Permanent Modifications  Temporary Modifications  Specification  PMs        Licensing  FSAR   Technical Specifications  Configuration Management Information System Operations Emergency Procedures Special Test Procedures Equipment Tagging Normal Procedures Plant Drawings Surveillance Setpoints        CM- Objective

PAGE 13 New Plant - CM 1. Establish STP as Owner 2. Define CM Organization – STP/EPC 3. Perform CM Training – STP/EPC CMP Function - Ownership/Organization/Training

PAGE 14 New Plant - CM ISSUE EPC Organization EPC consists of many entities; all who are used to doing business “their way”. CMP Function - Ownership/Organization/Training

PAGE 15 New Plant - CM ISSUE EPC CM Organization EPC does not have anyone “in charge” of CM. Standard response is “we all do it”. CM to EPC is simply “document control”. CMP Function - Ownership/Organization/Training

PAGE 16 New Plant - CM Result

PAGE 17 New Plant - CM 1.Identify the Scope of facility SSCS to which CM is applied. 2.Identify Baselines. 3.Identify (number) Documents and Equipment. CMP Function - Identification

PAGE 18 New Plant - CM BASELINES Baselines – Configuration Information that identifies and establishes the attributes of a facility at a point in time (specific plant design freeze) and serves as basis for defining change. Baseline License Requirements – Established when COLA submitted Baseline Documentation – Rev 0 STP documents Baseline Configuration Items (CIs) – EPC? CMP Function - Identification

PAGE 19 New Plant - CM ISSUE EPC Contractor does not understand Baseline. CMP Function - Identification

PAGE 20 New Plant - CM Develop a Plant Numbering System Keep it Simple and Intuitive Involve Operational Phase End-Users CMP Function - Identification

PAGE 21 New Plant - CM 1.End Users want to know Unit/System/Component Type/Unique No –U7-RHR-PMP-001A Unit/Doc Type/Subtype/Unique No –U7-P&ID-RHR-001 CMP Function - Identification U3-RHR-PMP-001A Unit/System/Component Type/Unique No Unit/Doc Type/Subtype/Unique No U3-P&ID-RHR-001

PAGE 22 New Plant - CM ISSUE EPC wants to use their numbering system. STP wants to use their numbering system. CMP Function - Identification

PAGE 23 New Plant - CM CMP Function - Identification Solution Use both Numbering Systems. Treat EPC as a Supplier/Vendor

PAGE 24 New Plant - CM RMS/DC STP Doc.# Supplier Doc.# 3E U3-P&ID-RHR EDB STP CID# Supplier ID# E11-C001A U3-RHR-PMP-001A CMP Function - Identification U3- RHR- PMP-001A (C001A) RESIDUAL HEAT REMOVAL PUMP 1A Component Tag

PAGE 25 New Plant - CM 1.Develop single, standard Change Control process for use by STP/EPC 2.Invoke Change Control on ALL Baseline (Rev 0) Configuration Information 3.Do not allow One-Time or Unincorporated changes CMP Function – Change Control

PAGE 26 New Plant - CM ISSUE Potential - Getting various members of EPC to use a single Change Control Process may be difficult. Selecting which changes will be reviewed by Owner requires significant consideration. CMP Function – Change Control

PAGE 27 New Plant - CM 1.Develop a Configuration Information Management System (CIMS) Relational RM/DC & Equip Databases CIMS must be available to Designer, Constructor and Owner/Operator Implement CIMS at onset of Design Phase CMP Function – CIMS

PAGE 28 New Plant - CM 1.Develop a Configuration Information Management System (CIMS) - cont’ Populate CIMS as design is developed Cross-Reference/Link Documentation to SSCS and vice versa as design is developed. Must be “expandable and transferrable”. CMP Function – CIMS

PAGE 29 New Plant - CM Application Architecture CMP Function – CIMS

PAGE 30 New Plant - CM Functional Architecture CMP Function – CIMS

PAGE 31 New Plant - CM EDB RM/DC U3-RHR-PMP-001B U3-RHR-MOV-010B U3-RHR-STRN-001B U3-RHR-PX-002B U3-RHR-HX-001B U3-RHR-PI-013B U3-RHR-PT-004B-1 U3-RHR-PT-004B-2 U3-RHR-PT-004B-3 U3-RHR-CVLV-002B ……. STP Doc # Supp Doc# 3E U7-D-P&ID-RHR CMP Function – CIMS

PAGE 32 New Plant - CM EDB RM/DC U3-RHR-PMP-001B Meta Data Attributes/Limits/Setpoints Margins Parts Risk PMs Work History P&ID-RHR CALC-RHR-001 SDD-RHR-001 FSAR-CHP-2.4, 5.4.7, 6.2 SPEC-RHR-0001 P-0P02-RHR-0001 VTD-G T.S , 3.4.8, , , 3.9.7, CMP Function – CIMS

PAGE 33 New Plant - CM CMP Function – CIMS ISSUE Potential - Getting members of EPC to agree on a single platform (Information System) may be difficult. Each member wants to use their own System.

PAGE 34 New Plant - CM 1.Verification and Audit Purposes Provide confidence that facility definition formation is under configuration control. Ensure that the facility design agrees with requirements. Validate that the design has been accurately documented. CMP Function – Verification & Audit

PAGE 35 New Plant - CM 1.Verification and Audit Purposes – cont’d Validate the integrity of the facility configuration information Validate that change control process is adequate Validate that CM objectives have been satisfied. CMP Function – Verification & Audit

PAGE 36 New Plant - CM But, at the end of the day: