Prepared by Dr. Leonard R. Hepp All Rights Reserved Lean Six Sigma Case Study Examples Prepared by Dr. Leonard R. Hepp January 5, 2010 All Rights Reserved.

Slides:



Advertisements
Similar presentations
Evolution of Parametric Analysis within Rolls-Royce Purchasing
Advertisements

OCD Internal and Education and Training Purposes Only A New Approach for You to Create Broader, Long-term Customer Engagements CL12092.
Used with permission ©Mentor Plus 2014 All Rights Reserved How Does Your Company Keep Score?
How are you going to manage?.  Informal  collection of vendors  loosely managed  minimal structure  Informal  collection of vendors  loosely managed.
1 Measuring HR/OD Initiatives and Projects “A Taste of Learning” Conference Office of Human Resource Development United States Government Washington DC.
QAAC 1 Metrics: A Path for Success Kim Mahoney, QA Manager, The Hartford
Certified Business Process Professional (CBPP®)
Sutter Solano Laboratory Lean Six Sigma Project
1 Prepared by Dr. Leonard R. Hepp All Rights Reserved Key Aspects of a Team Empowerment Session A Professionally Facilitated session Thorough Planning.
Productive Maintenance
Tool: Benchmarking Purpose: provide realistic goals and direction; monitor performance; improve processes to match the best in Higher Education. Benchmarking.
Baldrige National Quality Program 2009 Baldrige National Quality Program The Path to Excellence and Some Path-Building Tools Baldrige National Quality.
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
IE673Session 4 - Customer Relationships1 Customer Relationships (The Voice of the Customer)
Chapter 7 Controlling - To Ensure Results
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
By Saurabh Sardesai October 2014.
Performance Management
Strategic Leadership by Executives
Six Sigma Black Belt Project Information Prepared: July 20, 2004.
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Using Six Sigma to Achieve CMMI Levels 4 and 5
21 st Century Maricopa Review of Process Human Resources Projects Steering Team Meeting May 12, 2010.
Freeleansite.com The Lean Enterprise Why Change ? Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
BEST PRACTICES IN THE SEARCH & SELECTION OF A 3PL PARTNER OPERATIONS SUMMIT 2013 Presenters: Rick Hall – VP, Client Success, FIFTH GEAR Matt Konkle – President,
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Quality Function Deployment
Define the problem to be solved. Measure the current performance. M.
Driving and Sustaining Quality & Innovation in Manufacturing Processes Thursday, January 19, 20121Quality Presentation - EFY.
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Copyright© 2003, Dynamic Management Solutions “It’s Your Organization” “What are you going to do with it?” Dynamic Management Solutions Phone:
1 Copyright © 2007 Accenture All Rights Reserved. About CIS Co-op Insurance Services (CIS)—a subdivision of the Co-Op Group—provides a full range of life,
Operational Excellence and Sustainable Performance Improvement Date: 9 June, 2009.
Lecture 03. Overview of Lecture 02 Theory of Comparative Advantage International Business Methods Business Strategies Business Stakeholders Organizational.
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
Plans for the Research and Testing Phase of the 2020 Census Presentation to the State Data Centers October 15, 2010 Daniel H. Weinberg (Assistant Director.
Overview Lifting the Curtain - Debriefings FAI Acquisition Seminar.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Chapter 17 Purchasing & Quality Copyright 2006 Prentice Hall Publishing Company 1 Purchasing, Quality Control, and Vendor Analysis.
Office of Process Simplification May 20, 2009 Planning an Improvement Project.
Kepemimpinan Strategis oleh Eksekutif Chapter 12
Lean Six Sigma An Introduction to Process Improvement.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Executive Case Study Credit Card Declines.
The Balanced Score Card
MANAGING BUSINESS RISKS AN OVERVIEW CSU, Northridge January, 2004 Chris Brady University Risk Manager.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
How to Complement ISO 9001:2000 with Six Sigma. ISO 9001:2000 introduces a strong focus on measurement, analysis and improvement. This section will discuss.
Copyright 2003 – Cedar Enterprise Solutions, Inc. All rights reserved. Business Process Redesign & Innovation University of Maryland, University College.
The Value Driven Approach
The Balanced Scorecard
Project Portfolio Management Business Priorities Presentation.
© Max Zornada (2005)Slide 1 The Cost of Quality and the Cost of Poor Quality "Defects and errors are not free. Someone makes them and gets paid for making.
SOFTWARE PROJECT MANAGEMENT
Using OMB Section 508 reporting in addressing your agency's program maturity. How to Measure Your Agency's 508 Program.
Business Process Management
Total Quality Management
Copyright ©2005 by South-Western, a division of Thomson Learning. All rights reserved Chapter 18 1 Controlling: Purpose and Process MANAGEMENT Meeting.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
© The Delos Partnership 2005 Dairygold Workshop Strategic Sourcing Process.
Quality Assurance. Define Quality (product & service) Exceeds the requirements of the customer. General excellence of standard or level. A product which.
Cisco Systems Amy Kwan Annual Revenue: US $40 Billion Worldwide Presence: Culture: Innovation, Quality, Teamwork Changing the way we work, play and learn.
1 Ambient Monitoring Program PM 2.5 Data Lean 6 Sigma Air Director’s Meeting May 2015.
References: Supply Chain Saves the World. Boston, MA: AMR Research (2006); Designing and Managing the Supply Chain – Concepts, Strategies and Case Studies;
Challenges and opportunities for the CFO
Quality Management Six Sigma
Presentation transcript:

Prepared by Dr. Leonard R. Hepp All Rights Reserved Lean Six Sigma Case Study Examples Prepared by Dr. Leonard R. Hepp January 5, 2010 All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved

Prepared by Dr. Leonard R. Hepp All Rights Reserved Average Baseline Performance: 126 Days with Standard Deviation of 90 Days Range of 0 to 642 Days 40% of Key States Approved in 100 days 50% of Non-Key States in 100 Days

Prepared by Dr. Leonard R. Hepp All Rights Reserved Improved Performance: Average Performance 90 Days with Standard Deviation 70 Days 80% of State Approvals now within 60 Days A Major "Ah-Ha"...ability to deliver a significant % in ZERO days. Competitive Benchmark Key States Non-Key States

Prepared by Dr. Leonard R. Hepp All Rights Reserved “I don’t know where documents go after scanning” “No clear process for what is being scanned and when.” “Searching for documents is too time consuming.” “Turnover and loss of institutional knowledge have caused process breakdowns.” “Huge backlog that keeps building up.” “Do not even know what a comprehensive deal file should contain for legal, customer reference...” “The late submission of [closing documentation due to backlog issues] … is raising our level of concern regarding operations” >$30B market worth Baseline Performance Average Time To Locate a document minutes with Standard Deviation 780 Minutes Range of 0 to >4500 minutes (basically lost document issues)

Prepared by Dr. Leonard R. Hepp All Rights Reserved Segmentation Analysis Best-in-Class Identified After Project Results: 1.5 minutes Average with 1 minute standard deviation Elimination of Lost Documents

Prepared by Dr. Leonard R. Hepp All Rights Reserved Management of Associate Complaints 50% lead to next level resolution requirements Significant legal cost issues in some cases Morale & Employee Engagement is Suffering (Average Survey Satisfied

Prepared by Dr. Leonard R. Hepp All Rights Reserved Policy & Procedure 2001 Inventory Too Many Policies 2001 Bad Complaints Inconsistent Adherence: Focus On Labor Practice & Performance Management Policy & Practices: Unstable Environment: Massive Restructuring & Turmoil in Environment (Acquisition, Integration, Downsizing)  Quantity of Policies  Adherence to Policies/Practices  Communication  Huge Variation in Practices After Project: Less than 5% next resolution issues Near elimination of legal case issues Quality-Growth Mgmt Practice Changes Policy Changes Communication Bad Complaint Complaints that occurred when the proper Policy & Process were not followed Good Complaint Complaints that occurred when the proper Policy & Process were followed Tracking Mechanism Put in Place IMPROVEMENT FOCUS

Prepared by Dr. Leonard R. Hepp All Rights Reserved Multiple, competing Compensation approaches No standards for key elements No cross-business comparisons or market differentiations.

Prepared by Dr. Leonard R. Hepp All Rights Reserved Trotter Matrix FMEA After Project Single standards policy with 6 key criteria assessments 55-95% reduction in Compensation Programs across businesses.

Prepared by Dr. Leonard R. Hepp All Rights Reserved BEFORE Project: Multiple missed PICs and Count Adjustments (35% Defects) Empty, Lost, damaged Containers (18% Defects) Bar Code errors; lost signals from portable readers > “bad” data (56% Defects)

Prepared by Dr. Leonard R. Hepp All Rights Reserved After Project: Less than 0.1% PIC Defects (99.8% Reduction) 95 % Reduction in empty/lost/damaged containers “Bad” Data issues reduced by 85%

Prepared by Dr. Leonard R. Hepp All Rights Reserved “Production Up 35% in 2008 yet Inert Gas Usage has increased by 150% … something has to change!” Brainstorming of Gas Usage Issues Project Opportunity: >$100K in Savings if usage is in balance Streamlined processes and procedures Position for growth in 2009

Prepared by Dr. Leonard R. Hepp All Rights Reserved Project Results: $90K in Saving; additional $50K with investment New Technology to monitor systems in place Game Changer Opportunity in Alternate Material

Prepared by Dr. Leonard R. Hepp All Rights Reserved Project Spotlight Exubera® Make-Release Cycle Time Key actions by the team:  Stable work practices  Step visibility  Cross training in Mfg. & QA  In-process BPR clearance in July  Reduced redundancies  Identifying & addressing issues early  Reduced material transfer work (i.e. Hold)  Team empowerment action items  QC data packet reduced to 1 level review  Batch Disposition Group improvements A Cross-Function, multi-project team approach to this critical business metric: Exubera® BPR Sub-process: BPR Team Leads: XXX & YYY Disposition Release QC BPR EM ER Mfg BPR Cycle Time MFG Start B P R O K - M F G E n d 9/1/20068/1/20067/1/20066/1/20065/1/20064/1/20063/1/20062/1/ Scatterplot of BPR OK - MFG End vs MFG Start *Undefined Endpoint 14Apr06–Identification of Process Improvements 02May06–1 st Process Improvement Meeting 21Jun06–Team Empowerment Session 14Jul06–In-Process BPR Clearance *

Prepared by Dr. Leonard R. Hepp All Rights Reserved NO IMPACT ON ACCEPT/REJECT DECISION BY NEKTAR! There is no statistical (to 99.9% confidence) difference between vendors. Establish Performance Criteria Baseline & Run Statistics After Results: Supplier CoA Verified…no in-coming QC Reassessment Cost Savings $60K; Cost Avoidance >$125K!

Prepared by Dr. Leonard R. Hepp All Rights Reserved Complicated QC Internal/External Process >>> Simplified Lean Value Stream >>> 7 Key SubProcess with 4 driving Cycle Time! 40% Reduction in Mean and 90% Reduction in Variance! Business grew 2X but required NO additional resources Major Ah-Ha … Opportunity to REDUCE Testing by sample changes DramaticImprovements