ROMANIAN INTERMODAL ASSOCIATION – R.I.A.- Connecting through intermodality!

Slides:



Advertisements
Similar presentations
EU funds Operational Program National co-funding Priority axes Schemes Projects by Institutions Projects by NGOs Projects by Bulgarian Companies Subcontractors.
Advertisements

State of Art Study TG3 What are Feeder Services Why are we need Feeder Services EU Strategy and Policy regarding Feeder ServicesHandling Statistics EU.
isw Gesellschaft für wissenschaftliche Beratung und Dienstleistung mbH ECRN Seminar „The future of bulk chemicals in Europe – a challenge for.
ROMANIAN INTERMODAL ASSOCIATION – R.I.A.- Future development Connecting through intermodality! Join us! Member of.
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
ROMANIAN INTERMODAL ASSOCIATION – R.I.A.- Role of the Romanian Intermodal Association in Promotion of IWT Connecting through intermodality! Join us! Member.
The Danube River – Access way to Constantza Port The 4 th of October 2007, Budapest Monica Patrichi Expert Ministry of Transport General Directorate for.
1 5 years Inland Navigation Europe General Assembly Liège, 5 December 2005.
DEVELOPMENT OF THE GIURGIULESTI PORT COMPLEX. Giurgiulesti International Free Port ha, - has the status of a free economic zone - the oil terminal.
„South East Europe Programme” as a financing opportunity for projects in the Danube region and complementarity to other instruments COMPLEMENTARITY OF.
MINISTRY OF TRANSPORT, CONSTRUCTIONS AND TOURISM SOP – Transport Infrastructure ROMANIA, Bucharest 27 October 2005.
7 May, 2015 Green corridors in Europe; a perspective from Holland Menno M. Menist, Managing director 17 March 2010, Malmö.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Alexio Picco, WiderMos Technical Manager
Access to Intermodal Supply Chain Networks
MEDLOG 2011, Tangier, Morocco, March 31- April 2, 2011 Last Mile Logistics and Port Regionalization in Global Freight Distribution Jean-Paul Rodrigue Associate.
Chackrit Duangphastra,PhD
WATERBORNE TRANSPORT DEVELOPMENT STRATEGY IN THE REPUBLIC OF SERBIA Ministry of Construction, Transport and Infrastructure Republic.
1 Constantza Port - Your Black Sea CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration” Constantza ROMANIA 4 October.
Development of North Adriatic ports multimodal connections and their efficient integration into the Core Network Project: NAPA STUDIES Trans-European.
Dubai Government Policies for Enhancing the Competitiveness of Multimodal Transportation and Logistics Cluster June 2014.
1 Transport sustainability and green corridors TransBaltic Project 1-2 February 2010, Gdańsk Prepared by: Urszula Kowalczyk, Marcin Burchacz Maritime Institute.
THE IMPACT OF GLOBAL LOGISTICS
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
Use with Export Practice & Management Fifth Edition by Alan Branch ISBN 1–84480–081–4 © 2006 Alan Branch Chapter 3 Characteristics of international transport.
Gavin W. Roser Secretary General European Freight & Logistics Leaders Forum Brussels 6 th December /08/20151www.freightandlogistics.eu.
African Ports and Maritime Conference Swakopmund 2011 Trade Facilitation and Intra-African Trade Jon Walden Senior Adviser Customs and Trade Facilitation.
Part-financed by the European Union Priority 2 of the BSR Programme External and internal accessibility of the BSR Ryszard Toczek, City of Gdynia.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
3rd TG Meeting and 2nd Project Coordination Team Meeting Enns - 7 and 8 March, 2012 Project DaHar Sanja Bojić, Dipl.-Ing.-Master WP4 – A2 DaHar PP: University.
HIGH PERFORMANCE GREEN PORT GIURGIU 2012-EU S The project is in line with the Priority Project no 18 Waterways Axis Rhine-Main-Danube of the TET-T.
ROMANIAN INTERMODAL ASSOCIATION – R.I.A.- Role of the Promotion Centres in Intermodal and ShortSea Shipping Transports Connecting through intermodality!
TRACECA PROJECT EVALUATION
1 Todays Challenges for transport corridors The perspective of the Interreg IVC project PORT Integration Michael Stange.
Constantza Port Day in Budapest 23 rd of February 2012.
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
1 Constantza Port Day in Budapest 28th of February 2013 Mr. George Gabriel Visan – Commercial Director NC Maritime Ports Administration SA Constantza.
Transport Henrik Drake "Ports and Inland Navigation" European Commission, DG Mobility and Transport (DG MOVE ) Common Issues Meeting on RIS Zagreb, 13.
1 Global Rail Freight Expansion needs, plans and initiatives A European Shippers’ Perspective Nicolette van der Jagt Secretary General European Shippers’
Contribution of Romania to Intermodal Transport between Europe and Asia Marin STANCU Ministry of Transport, Constructions and Tourism ECMT/UNECE Seminar.
Challenges for Dry Bulk Terminals in Developing Regions.
THE NEW TRANS-EUROPEAN TRANSPORT NETWORK A CORE NETWORK: BLUEPRINT FOR 2030.
European Commission Directorate-General for Energy and Transport Unit G3 – Motorways of the Sea & Intermodality EURO-MEDITERRANEAN TRANSPORT FORUM MARITIME.
MULTI MODALISM CHAPTER 11. INTRODUCTION Multi-modalism / Combined Transport Operation: Process of operating a door-to-door/ warehouse-to-warehouse service.
Interim Report on Cutting Cost and Time in Maritime Container Transport Maritime Experts Group 23 May 2006 Hanoi, Viet Nam 27th APEC Transportation Working.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Intermodal transport between Europe and Asia: opportunities and challenges of Latvia.
BMT Transport Solutions GmbH 1 Third BSR INTERREG III B partner search forum in Gdansk Actors perspective on pan-Baltic transport development Lars Källström.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
Unit C.2 Maximilian Bauernfeind 23/02/2010 Developing Inland Waterway Transport in the European Union Contributing to a sustainable Transport Network.
The Almaty Programme of Action A New Global Framework for Transit Transport Cooperation for Landlocked and Transit Developing Countries.
RAILROAD Association at 7 th Zimbabwe Mining and Infrastructure Indaba 2015 RRA CEO: GG Zimba.
Ministry of Transport, Maritime Affairs and Communications of the Republic of Turkey Intermodality leads to Sustainability A workshop for the Working Party.
The National Strategy of Slovak Republic
The National Strategy of Slovak Republic Ing. Iveta Kubasáková, PhD.- Ing. Ivana Šimková University of Zilina, Faculty of Operation and Economics of Transport.
The White Paper from 2001 to 2010 Vision White Paper  Issued by the EC  Consultation from stakeholders, Parliament and Council  Will set out.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
Key factors in the transport policy to encourage better integration Sixty-Third Session of UNECE, Geneva, 30th March 2009 "Economic Integration in the.
C4Freight. Freight Transport Corridors  Objective Demonstrate on key pan-European corridors innovative transport technologies, systems and strategies.
Roadmap to a Single European Transport Area – Towards a competitive and resource efficient transport system.
Port of Black Sea Regional Conference 31 st October 2007 CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration”
THE IMPACT OF GLOBAL LOGISTICS
Go LNG LNG Value Chain for Clean Shipping, Green Ports and Blue Growth in Baltic Sea Region.
Results of the DIOMIS project
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
Feasibility study on infrastructural interventions in Port of Split
Enabling multi-modality and efficient freight logistics
Intermodality and Inland Waterways
being an important junction on two TEN –T routes that
Presentation transcript:

ROMANIAN INTERMODAL ASSOCIATION – R.I.A.- Connecting through intermodality!

Romania – actual situation 1 Intermodal transport A. Railway - Fragmentation - Very low volume of freight – there is not assured a constant flow of cargo - Low quality with regards to transit times and equipment - Low efficiency due to transit times and fragmentation of the flows - Still competitive because low prices B. Road - is the dominant mode for exports - preferred by most traders - machinery and general cargo is transported on road - congestion

Romania – actual situation 2 Intermodal transport C. Inland navigation - still infant in terms of volumes and technology - transhipment facilities are old and need improvements - but increasing trend Giurgiu- Belgrad by Bulgarian River Shipping Company- reached 2600 TEUs in 2007; started in 2005; Constanta-Belgrade by ZIM Romania; during 2006, route over TEU; weekly service; Constanta –Giurgiu by Mainromline SRL Bucharest - two barges with 100 TEU capacity- weekly service D. Sea transport - is the dominant mode for imports and also exports, cost efficient for large volumes - preferred for large quantities of cargo and destined to far east or other ports in the Black Sea Constanta is the only regional hub at the Black Sea – container terminals, new projects for port development (Pier II – CSCT and Pier III), bulk, general cargo, Ro - Ro, network of railway and roads, hinterland;

Bottlenecks in intermodal transport I. Infrastructure : a) Railway infrastructure - technical status is on average not good - status of the network is fair, - electrification would be desirable on some links, - freight transport including intermodal transports has low priority of time slot b) Inland waterway network - water level fluctuation on Danube - air clearance constraints - navigation restrictions during nights or fog c) The terminal network - is quite dense. The usage and their quality are poor. Needs investments d) The road access to the terminals for local collection and distribution of intermodal cargo - in poor condition in some areas II. Infrastructure charges - Are levied to rail users in order to cover costs of periodical maintenance - In road transport part of these costs are covered by Eurovignete. - In inland navigation, no charges are imposed

Bottlenecks….. III. Infrastructure ownership a) railway - mainly under CFR governance - links operated by private entities b) road access - operated by private entities (sometimes a road is owned by a number of companies located on the road) c) Ownwership of the land for terminal development and the access roads are not clear and transparent IV. Equipment a)rolling stock - age of old locomotives and wagons is high but recent procurements are changing it. a)Inland barges - availability of barges is not a constraint - for container services, conventional barges are sufficient performers c) Trans-shipment – cranes are old and not fitted for intermodal services

Bottlenecks….. V.Lack of transport demand - intermodal transport services are only viable beyond a certain demand; - potential is increasing; - demand for transport in the segment of continental services is increasing due to continuous trade. VI. Little orientation on quality - high tolerance for long transit times - poor punctuality. VII. Port efficiency – hindered by business behavior: -Road traffic to the terminal is concentrated around few peak hours; -The dwell time of containers in the port area is very high; -The level of communication between actors in the chain is rather poor; -Customs operations uphold traffic.

Potential of intermodal transports- SOPT Strenghts -ROMANIA location – point of entrance to and for EU -Extensive railway network with innovative private operators providing local services - Danube and other inland navigation waterways are well connected to provide new potential for low cost bulk freight, development container traffic and leisure use - waterway network is environmentally friendly and an alternative to road/rail transport Weaknesses -Transport infrastructure design and construction does nor meet EU standards -Low investments in new constructions and maintenance of fluvial and maritime ports infrastructure, including handling facilities; - restrictions of depth and width on Danube; - Low maintenance investments of rail infrastructure resulting in speed restrictions and high transit times - No flexible pricing and excessive documentation Opportunities -Sustained econimic growth will lead to greater internation trade -Strengthening of the business climate will lead to greater transport demand -Restructuring of operational services for increasing the use of the cost-effective multimodal transport modes for transit, international and domestic container traffic -Supporting the less polluting transport will contribute to human health, the environment improvement and to economical competitiveness Threats -International transit flows could choose to avoid Romania - delays in carrying out priority projects. Preparation and feasibility studies and land acquisition issues last long times - the insufficient response to customer demand may deprive rail and waterway transport of the opportunities to expand and develop

Recommendations to remove bottlenecks Increase capacity of terminals Transport infrastructures for better access of terminal Investments in modern standardised intermodal equipment (cranes, …… Harmonization of opening hours and of loading units Overcome mental bottlenecks Improved border procedures for intermodal transport A unique office for customs, borders police, port authorities Consideration of intermodal transport in technical, operational and administrative procedures Development of a reliable logistic industry

Impact of European Projects on intermodal transports Marco Polo II - transfer of large quantities of cargo from road to other alternative ways of transport. Estimation – aprox bil tones-km transferred until Budget of 450 mil. euro to be spent between 2007 si Novelties: Elimination of barriers between member states and non-members of UE Sustains the private entities in getting funds based on well structured projects Stresses the importance of services Research, infrastructure and studies projects will not be financed ; There were 3 new measures introduced: Action of common learning, Motorways of the sea, traffic avoidance Priority to Motorways of the sea and traffic avoidance

Impact of European Projects on intermodal transports (RIA) DACIA = DAnube Corridor of Intermodal Afreightment - One EU grant for a promotion project PLATINA = Platform for the Implementation of NAIADES (promotion of inland navigation–financed under FP 7 program); EWITA II = European Webplatforms and Training Concepts for Intermodal Inland Waterway TrAnsport (training modules – financed under Marco Polo II) RISING = RIS Services for Improving the Integration of Inland Waterway Transports into Intermodal Chains (RIS as unique platform for all actors – FP 7) COLD = Container Liner Service Danube

WHAT IS R.I.A. ? The ROMANIAN INTERMODAL ASSOCIATION (R.I.A.) was founded in december 2006, upon an initiative of the Romanian Ministry of Transports, Constructions and Tourism together with public authorities and private companies acting in the field of transports. The center is a professional non- profit entity addressing to all interested parties in promoting and developing the field of intermodal transports and its auxiliary activities.

MEMBERS The National Company Maritime Ports Adminstration, Constanta The National Company Administration of Navigable Canals, Constanta The Romanian Association of Inland Owners and Ports Operators, Galati Romanian Naval Authority, Constanta Romanian Maritime Training Center,Constanta Navlomar Maritime, Constanta Focus Group Romania, Bucharest Maersk Romania S.R.L., Bucharest RomMarine Consult, Constanta Nord Marine Shipping, Constanta Mainromline SRL Bucharest The Administration of Free Zones - Giurgiu

2007 Activities Setting up the office; distribution of RIA brochures, meetings with the Romanian MoT, meetings with intermodal operators; Attracting members (12, at the present moment); Establishing contacts within EU promotion centers network (EIA, INE, Austria, France, Germany, Netherlands, Belgium, Italy, Bulgaria); Starting a web-page; Involvement in EU funded projects; Developing national funded projects (feasibility study for marina port in Tulcea, partner with CERONAV in the project: “Safety in the intermodal transports through continuous learning”); Organising the national seminar on the “Logistics of intermodal transports –challenges, problems and solutions”, 12 decembrie 2007

Constanta Port, Gate 2 Building “Bursa Noua” Floor 1, Room 125, Constanta, , Romania Tel: , Fax: Thank you for attention! Created by Nicoleta Apostol – PR&Communication Constanta Port, Gate 2 Building “Bursa Noua” Floor 1, Room 125, Constanta, , Romania Tel: , Fax: Thank you for attention! Created by Nicoleta Apostol – PR&Communication