Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems Phantom Works FAST Nimitz – A Powerful, Highly Mobile Platform to Address Space.

Slides:



Advertisements
Similar presentations
McCoy School of Engineering Midwestern State University A FUTURE GOLD RUSH: CAPTURING ASTEROIDS WADE COURTNEY & TYLER THOMAS MENTOR: DR. M. SALIM AZZOUZ.
Advertisements

LightSail.
Presented by Marco Christov at the 11th Mars Society Annual Convention, 14 – 17 August 2008, Boulder Colorado. A Mars Heavy Transport.
Working for the future - today
Low-thrust trajectory design ASEN5050 Astrodynamics Jon Herman.
Architecture Team Industry Day Briefing 17 January, 2002.
HUBBLE SPACE TELESCOPE PROGRAM Sixth European Conference on Space Debris 1 Goddard Space Flight Center mk_overview.ppt Space Shuttle STS- 31 Deployment.
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
Federal Aviation Administration On-Orbit Debris Mitigation Methods for Upper Stages COMSTAC: Space Transportation Operations Working Group and Risk Management.
Inner Guides=Text Boundary Outer Guides=Inner Boundary Asteroid Redirect Mission and Human Exploration Michele Gates Human Exploration and Operations Mission.
List of investigators Next Generation EP PPUs Brian Gilchrist, UM Steve Battel, Battel Engineering (consultant) Alec Gallimore, UM Ken Arnett, UM-Space.
PROJECT ICARUS by Noah Michael, Student Project Manager & Dr. Nikos Mourtos, Faculty Project Manager AE 170A/B Course Instructor.
Surrey Space Centre, University of Surrey, Guildford, Surrey, GU2 7XH ESA Wireless Sensor Motes Study George Prassinos, SSC, University of Surrey.
A Comparison of Nuclear Thermal to Nuclear Electric Propulsion for Interplanetary Missions Mike Osenar Mentor: LtCol Lawrence.
Evolutionary and Game Changing Technologies for Solar Power Generation Ted Stern Vanguard Space Technologies, Inc. San Diego, CA
LSU 10/09/2007System Design1 Project Management Unit #2.
Pez Zarifian Global View Earth Station: Global ISS Marketing – Future of Human Spaceflight.
Noah Garcia-Galan *Some information in this presentation comes from outside sources.
System F6 Paul Eremenko Tactical Technology Office Defense Advanced Research Projects Agency (571) February 2010 Approved.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Orbital Debris 10 June, 2015 Symposium for the Small.
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
ThermoNeutronics, LLC featuring energy solutions for tomorrow… Generation III Integrated Energy Technologies Property of ThermoNeutronics, LLC.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Space-Based Force Application: A Technical View Dr. Laura Grego Union of Concerned Scientists Outer Space & International Security: Options for the Future.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Space-Based Network Centric Operations Research. Secure Autonomous Integrated Controller for Distributed Sensor Webs Objective Develop architectures and.
Air-launched Earth-observing Ground Information System Carleton University’s 4 th Satellite Design Team Introduction to AEGIS.
Preliminary Design of NEA Detection Array Contractor 2 Kim Ellsworth Brigid Flood Nick Gawloski James Kim Lisa Malone Clay Matcek Brian Musslewhite Randall.
PLANETARY PROBE LASER PROPULSION CONCEPT 7 TH INTERNATIONAL PLANETARY PROBE WORKSHOP JUNE 2009, BARCELONA LE, T. (1), MOBILIA, S. (2), PAPADOPOULOS,
Problem Statement Overview of tasks Requirements for selection test.
Industry Structural Analysis of Hosted Payload Service Array Darrel Cain Jon Card David Dominguez Andy Frick Joe Jaeckels.
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
MIT : NED : Mission to Mars Presentation of proposed mission plan
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
 The Multi-Tier Mission Architecture and a Different Approach to Entry, Descent and Landing Jeremy Straub Department of Computer Science University of.
Human Exploration of Mars Design Reference Architecture 5
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
The final Space Shuttle has landed… Now what??. The Space Shuttle Since 1981, NASA space shuttles have been rocketing from the Florida coast into Earth.
CRICOS No J a university for the world real R ENB443: Launcher Systems Image Credit: ESA Caption: The generic Ariane-5 (Ariane Flight 162) lifting.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
PTAR Presentation Jonathan DeLaRosa, Jessica Nelson, Ivan Morin, JJ Rodenburg, & Tim Stelly Team Cronus.
1 The PISCES Project Don J. Pearson JSC/DM Flight Design & Dynamics Division May 2002
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
Orbital Aggregation & Space Infrastructure Systems (OASIS) Background Develop robust and cost effective concepts in support of future space commercialization.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
QTYUIOP THERMIONIC SPACE POWER THE EMERGING SOURCE OF SPACE POWER IN THE NEXT DECADE AUBURN UNIVERSITY AUGUST 17, 1999.
Space Junk © 2011 Project Lead The Way, Inc.Aerospace Engineering.
Commercial Services Repurposing multi-mission ground network infrastructure for emerging, new space applications. Tom Pirrone &
IISME Fellowship Lockheed Martin Space Systems Summer 2010 SBIRS Space Based Infrared System GEO-1 satellite All pictures are from google.
Orbital Express: A New Chapter In Space
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Space Tug Propellant Options AIAA 2016-vvvv
Future In-Space Operations (FISO) Telecon Colloquium
Propellant Depot Bernard Kutter United Launch Alliance
Space Junk Aerospace Engineering © 2011 Project Lead The Way, Inc.
TEMPO’s Commercially Hosted Payload Concept
Space Junk Aerospace Engineering © 2011 Project Lead The Way, Inc.
Deputy, Washington Operations
Accretion of Non-functioning GEO Spacecraft
Derivation of the FSOA in Ariane 6 Specifications
Inputs on HPM EPS, SEP Stage Block II configuration, and comments on 10/2 presentation package Tim Sarver-Verhey 10/1/2001.
Autonomous Operations in Space
Week 4 Presentation Thursday, Feb 5, 2009
Vice President, Business Development
Key Benchmarks in a LEO Economy Robert L. Curbeam Jr.
Team A Propulsion 1/16/01.
Multi-Domain Innovation for Air & Space Power
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems Phantom Works FAST Nimitz – A Powerful, Highly Mobile Platform to Address Space Debris in Any Orbit Tom Kessler Boeing Advanced Systems (714) – Boeing FAST Nimitz Concept – Approved for Public Release – Revision A2.ppt | 1 The views, opinions, and/or findings contained in this article/presentation are those of the author/presenter and should not be interpreted as representing the official views or policies, either expressed or implied, of the Defense Advanced Research Projects Agency or the Department of Defense. DISTRIBUTION STATEMENT A Approved for public release; distribution is unlimited.

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Space Debris Is An Increasing Threat to Both GEO and LEO Operations Image courtesy of the European Space Operations Centre and Universe Today, 4/11/08 2  About 40% of ground-trackable space debris come from explosions, now running at four to five per year.  Collisions will exceed explosions as a source of new debris within 20 years  Collisions between live spacecraft and other objects can be mitigated by better tracking First priorities should be to reduce threats of Upper stage / spacecraft explosions ‘Dead-on-dead’ debris collisions

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Space Debris is In Many Inclinations And Altitudes  LEO debris is scattered in inclination, Right Ascension, and altitude  Cost effective, timely solution requires that multiple debris objects be engaged per mission/vehicle  “Traveling Salesman Problem” –For a given list of cities (debris targets) and their pairwise distances (delta-V), what is the shortest possible (least energy) tour that visits each city once. 3 Data per “History of On-Orbit Satellite Fragmentations – 14 th Edition, NASA Orbital Debris Program Office Image courtesy of the European Space Operations Centre and Universe Today, 4/11/08 Effective space-based solution should have high delta-V

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Fabricate a high power and light weight solar electric array that can support a wide range of space applications, and ground test it in a relevant space environment 4 GOALS ~30 kWe electrical power >130 W/kg specific power Scalable to ,000 kWe MCA Solar Performance Characteristics Sunlight Thermal Conduction Radiative Emission Mechanical / Electrical Link Mirror Radiator Solar Cells :1 Concentration 23.1m 2.25m Basic FAST 15 KW Solar Wing Building Block FAST Program Overview

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Inherent scalability Design is modular, one array (2 wings) yields ~30 kWe Modular approach scales up, dimensions by 2X, area by 4X Modular: Up to six wings can be flown in tandem for 180 kWe Scalable: Doubling wing dimensions yields ~720 kWe Future technology will scale up power & reduces mass Scaling up dimensions Advanced solar cells Flexible launch vehicle packaging & interface 4X better packaging efficiency than state of the art SLV  30 kWe HPGS, packages in 1.7m Falcon 1E fairing Minotaur IV EELV  Scaled-up 180 kWe system fits in 5m fairing Inherently survivable/hardened configuration Laser survivability due to MCA geometry More radiation tolerant due to shielding of surrounding MCA structure Supports multiple passes through Van Allen Radiation Belt 180 kWe or 720 kWe Concept Big when scaled up…but not too big Equivalent Acreage 180 kWe 720 kWe Potential for > 50% increase in specific power in next decade 30 kWe Array in Falcon 1E 5 Enables LEO to GEO round trips (RT) Key FAST Features

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited FAST Enables Very High Power Electric Propulsion and an Order-of-Magnitude Greater Delta-V 6 FAST spacecraft configurations with useful payloads offer 9,000 – 14,000 meters/second of delta-V HET: 2,000 sec Biprop: 320 sec Ion: 4,000 sec

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Boeing Has Demonstrated Fully Autonomous Rendezvous (with or without client aids) 7

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Orbital Express Demonstrated Fully Autonomous RPO from 200 KM in to 10 CM 8

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited  Northrop Grumman-provided hardware demonstrated autonomous transfer of hydrazine propellant to and from the NextSat spacecraft 15 times –Multiple types of fuel transfers are demonstrated  MDA-provided robotic arm demonstrated eight battery and computer transfers in both directions between the Ball and Boeing spacecraft for both a battery and a flight computer module Orbital Express Demonstrated Fully Autonomous ORU and Propellant Transfer 9 ORU Nimitz itself can be refueled – further extending it’s capability and improving overall economics

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Summary FAST Nimitz offers revolutionary capability for debris mission –High Performance – Vast improvement over Bi-Prop propulsion and SOA solar arrays –Cost effective - This delta-V can allow removal/supersynching of many large GEO or LEO debris objects in a single mission  Boeing’s FAST team has or is demonstrating the key Nimitz technologies –30 KW High Power Generation System Module – KW electric propulsion system –Fully autonomous Rendezvous & Proximity Operations GN&C systems for space debris –Highly flexible robotic systems developed under FREND & Orbital Express programs  FAST Nimitz can carry multiple payloads to affect space debris of many types in many useful ways: –Direct capture/transfer/de-orbit of large debris –Indirect, non co-orbital deployment of de-orbit systems –Etc. 10 Metric Bi-PropFAST with EP Advantage Total S/C Power1 kW30 KW30x more Delta-V1-2 Km/s9-14 Km/s5-10x more

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Conclusion  As the leading manufacturer of satellites in the world, Boeing is committed to supporting our customers critical mission operations in space, including effective responses to the space debris issue  Nimitz could deliver, power or otherwise work in concert with many debris mitigation payloads  We are very interested in collaborating with the developers of these systems  Please contact me at –Tom Kessler –Boeing Advanced Systems –(714)

Copyright © 2009 Boeing. All rights reserved. Integrated Defense Systems | Phantom Works Approved for public release, distribution unlimited Abstract - Fast Access Spacecraft Testbed (FAST) Nimitz High Energy Spacecraft for Orbital Debris Removal  This paper describes how a space vehicle utilizing a high-power solar array and equipped with advanced high-power solar electric propulsion can be fitted with a capturing system for space debris disposal.  The “NIMITZ” spacecraft, powered by a FAST (Fast Access Spacecraft Testbed) solar concentrator solar array provides 30 – 180 KW for payload or electric propulsion. The FAST solar array, being developed by The Boeing Company under a DARPA contract, is a 30kWe solar concentrator system. When integrated with a space platform equipped with advanced high-power gridded ion or Hall effect thrusters, the space platform is capable of 5,000-15,000 meters/sec delta-V. This capability coupled with a robotic arm with a broad array of end effectors and other capabilities, results in a configuration capable of capturing and/or disposing of any class of space debris in any orbit from LEO to GEO.  Also discussed is the ability to intercept debris and utilize exceptional maneuverability, including the number of objects that can be visited, the time to maneuver between objects, direct rendezvous and proximity operations for large debris transfer, providing remote deployment of deorbit packages, and small/medium removal means, all due to high delta- V capability of NIMITZ.  NIMITZ would be cost effective, removing large debris for one value price and small/medium debris for another. NIMITZ would be timely, removing large debris within days and small/medium debris within weeks, depending upon specific orbit and payload. 12