1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.

Slides:



Advertisements
Similar presentations
EU CORIN Supporting Cross-border Cooperation BiH – Croatia/Serbia/Montenegro Europeaid/122730/C/SER/BA ________________________ Topical Training for JMC.
Advertisements

1 Information and Publicity in programming period.
Workshop on Sector Approaches in the Context of EU Integration Sarajevo, Bosnia and Herzegovina March 2010 Debriefing of the Workshop on Sector Approaches.
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
Evaluating public RTD interventions: A performance audit perspective from the EU European Court of Auditors American Evaluation Society, Portland, 3 November.
Delegation of the European Commission Romania preparing for EU membership European Structural and Cohesion Funds.
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY Introduction.
Project funded by The European Union Government of the Republic of Serbia European Integration Office INDUCTION TRAINING SEIO GENERAL FRAMEWORK CREATED.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
INTERACT ENPI is a project funded by the European Union Summary of the Workshops
Enhancing Institutional and Administrative Capacity case: POLAND
EU-Regional Policy and Cohesion Structural Funds and Accession 1 SPP BUILDING IMPLEMENTATION CAPACITY Training seminar on evaluation Prague February.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
1 Framework Programme 7 Guide for Applicants
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Control and Audit Nicholas Martyn.
MINISTRY OF ECONOMY AND FINANCE C.S.F M.A SPECIAL COORDINATION SERVICE FOR THE IMPLEMENTATION OF THE OPERATIONAL PROGRAMMES COMMUNITY SUPPORT.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Overview report of a series of FVO fact- finding missions and audits carried out in 2012 and 2013 in order to evaluate the systems put in place to give.
December To share best practices from the experience of 100 NSDS implemented over the last years. To take into account international community.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
This project is co-financed by the European Union and the Republic of Turkey 1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Croatian Experience with Management of EU Funds Nataša Mikuš, Deputy State Secretary Central Office for Development Strategy and Coordination of EU Funds.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
European Commission Introduction to the Community Programme for Employment and Social Solidarity PROGRESS
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY Bölgesel Rekabet.
HR 08 IB SPP 02 TWINNING PROJECT “ENHANCEMENT OF CAPACITY FOR EFFECTIVE MANAGEMENT OF EU COHESION POLICY FUNDS” 1 The most significant results of Component.
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel.
1 European Territorial Cooperation in legislative proposals Peter Berkowitz Head of Unit Conception, forward studies, impact assessment, DG Regional Policy.
The Instrument for Pre-Accession Assistance IPA General overview DG Enlargement Financial Instruments and Regional Programmes Directorate.
IPA Funds Monitoring and Evaluation December Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
Regional policy European Commission EN Update on IPA Component III - environment Brussels, 28 November 2008 Erich Unterwurzacher REGIO.I4 – IPA/ISPA.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
MONITORING SYSTEM OF EU STRUCTURAL FUNDS: PHYSICAL INDICATORS International Conference for New Member States February 1-2, 2012, Vilnius (Lithuania) European.
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
The partnership principle and the European Code of Conduct on Partnership.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
1 EUROPEAN FUNDS IN HALF-TIME NEW CHALLENGES Jack Engwegen Head of the Czech Unit European Commission, Directorate General for Regional Policy Prague,
REGIONAL POLICY EUROPEAN COMMISSION The contribution of EU Regional/Cohesion programmes Corinne Hermant-de Callataÿ European Commission,
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Results orientation: audit perspective Jiri Plecity, Head of Unit H1, Relations with Control Authorities, Legal Procedures, Audit of Direct Management.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
DG Justice and Consumers Project Management Some points of attention JUST/2014/JCOO/AG/CRIM and JUST/2014/JCOO/AG/CIVI Kick-off meeting 26 January2016.
S&E and BMW Regional Operational Programmes 14 – 20 Training for Local Authorities involved in DUCGS projects, 21st April 2016 REPORTING, DATA COLLECTION.
11/06/20161 Transport sector - Preparing for next programming period: SEA as part of ex-ante conditionality and ex-ante evaluation Adina Relicovschi Senior.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Твининг пројекат Европске Уније Успостављање механизма за спровођење ММR *** Twinning project Establishment of a mechanism for implementation of MMR Пројекат.
W. Schiessl, AGRI E.II.4 Programme management and institutions involved in monitoring and evaluation.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Proposed Organisation of Evaluation of the Romanian NSRF and Operational Programmes, Niall McCann, Technical Assistance Project for Programming,
Evaluation : goals and principles
Common Monitoring and Evaluation System for Rural Development
ESF ASSISTANCE TO LITHUANIA’S OBJECTIVE 1 AND EQUAL PROGRAMS
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
ESF monitoring and evaluation in Draft guidance
Good practices for risk assessment and control activities
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Presentation transcript:

1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance on Institutional Building for the Implementation of RCOP in Turkey This project is co-financed by the European Union and the Republic of Turkey Monitoring and Evaluation Ankara, 15 December 2011 Laura Trofin (PhD): TAT Non-Key Expert, Monitoring and Evaluation

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Topics: 1.SMC reporting and meetings 2.Evaluation: main concepts, types and criteria 3.Interim Evaluations – methodologies 4.Management and ToR for evaluations

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Approach Useful – from training to semi-coaching “Theory” – interactive! Group Exercises – logical, in steps From formal to…useful Two “groups”: M&E and other departments – other needs

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Reporting to the SMC: purpose and approach to Implementation Reports

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey What is a report? Narrative exercise Comprises, in a concise but comprehensive format, necessary info re your programme Based on management, implementation and monitoring Analytical to a more limited extent – facts ?procedures?

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Why to report? Formal request or beneficial? Accountability – requirements respected by the OS (financial sound implementation, efficient, effective) Serving the decision-making process (* not SMC…) Communication tool?

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey IPA Implementing Regulation - OS (1) Art. 169: yearly/final sectoral implementation report to IPA NC and EC; examined by the SMC first CONTENTS: a) the quantitative and qualitative progress made in implementing the OP, PAs, Ms& (g)operations vs. targets, with a quantification - when possible, using the indicators at the appropriate level. HRD the statistics broken down by sex*;

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey IPA Implementing Regulation – OS (2) b) the financial implementation of the operational programme - each priority axis and measure total expenditure paid out by the final beneficiaries and included in payment applications total expenditure actually committed and paid out by the national fund (link committed budget operations - payments) total payments received from Commission c) the indicative breakdown of the allocation under the IPA Regulation, by categories

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey IPA Implementing Regulation – OS (3) d) the steps taken by the operating structure or the sectoral monitoring committee to ensure the quality and effectiveness of implementation, in particular: (i) the monitoring and evaluation measures, including data collection arrangements; (ii) a summary of any significant problems encountered and any subsequent measures taken; (iii) the use made of technical assistance; (e) the I&P activities; (f) progress and financing of major projects;

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey IPA Implementing Regulation – NIPAC Art. 61 of IPA IR: annual and final reports on the implementation of assistance under the IPA Regulation. shall synthesise the different sectoral annual reports issued under the different components and shall include information about: (a) progress made in implementing Community assistance, in relation to the priorities set up in the multi-annual indicative planning document and the different programmes; (b) financial implementation of Community assistance.

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey IPA regulation - EC Title III, Art. 13: Com-Parl; each year a report on the implementation of Community assistance under IPA. The report shall contain information on the: actions financed during the year and on the findings of monitoring work, and shall give an assessment of the results achieved in the implementation of the assistance

12 Reports structures RCOPOTHER PRGOGRAMMES NIPAC IPA REPORT EC – PARL Report OVERVIEW OF IMPLEMENTATION Quantitative progress* (by priority axis and measures) incl. physical progress* Qualitative analysis (incl. real physical progress*) Financial information (n+3) Changes in context Compliance with Com. Aquis Complementarity QUALITY AND EFFECTIVENESS OF IMPLEMENTATION Monitoring Problems TA INFORMATION AND PUBLICITY MAJOR PROJECTS OVERVIEW OF IMPLEMENTATION Achievement and analysis of the progress (physical, financial, qualitative) Compliance with Com. Law Problems Complementarity Monitoring IMPLEMENTATION BY PRIORITY Physical progress Qualitative TA INFORMATION AND PUBLICITY THE YEAR IN REVIEW Main evolutions of the enlargement process PROGRAMMING AND IMPLEMENTATION OF IPA: GENERAL OVERVIEW Strategic Planning & Programming (MIPD, Components) Implementation Modalities and Structures Overview of IPA implemented Programmes (contracting rates) MONITORING AND RESULTS Monitoring Evaluation Reporting DONORS/EIB/IFIS

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Group exercise 1 Structure and topics to be addressed by the AIR THINK ABOUT: Purpose of the report Target group(s) of the report Information obligatory to be reported on

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey TOPICS to be addressed by AIR (1) Programme context – socio-economic and institutional, which might influence, from OUTSIDE (EXTERNAL), the implementation of the programme (PD*) Financial progress: per programme, priority, measure – allocated vs. contracted and allocated vs. paid funds (by beneficiaries, by NF, by Commission) (built up from project level) (FCD) add other projects in the pipeline (preparation, programming, tender documentation preparation) – these are “further” info Physical progress: per programme, priority, measure, horizontal – targets vs. achieved values (built up from project level) (MD)

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey TOPICS to be addressed by AIR (2) AIR (2) Qualitative analysis – at project level - meant to present the “results” of projects, not captured by indicators – particularly important in projects with intangible results as well as good practices (to be replicated), innovative approaches/results, successful/less successful projects (risks) concise (PD) A qualitative and effective implementation Programme implementation steps: programming, feeding into the project pipeline (calls/direct negotiations/approval of OIS), contracting, project implementation (activities and financial - reporting), control, audit, monitoring, evaluation Coherence and Complementarity Major projects TA I&P Problems encountered and measures taken

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Sectoral Monitoring Committee

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey SMC – purpose and main features Overall, it should satisfy itself as to the effectiveness and quality of the implementation of the programmes and operations concerned It may make proposals to the Commission and the national IPA coordinator, with a copy to the national authorising officer, for decisions on any corrective measures to ensure the achievements of programme objectives and enhance its efficiency Reports to the IPA Monitoring Committee Mandate set out by the Commission - co-chaired by the head of the operating structure and the Commission Decisions – consensus or simple majority of the present voting members

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey SMC – main tasks Cover all areas of programme implementation /management – is informed, reviews, examines “will monitor especially the financial absorption capacity of the different interventions” (OP page 154) DECISION MAKING general criteria for selecting the operations Communication Action Plan ROTATIONAL PRINCIPLE it should ensure “representation and membership” institutional memory (?)

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey DO YOU THINK THAT THE RCOP SMC FULFILLS ITS PURPOSE AND TASKS? WHY?

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Findings of the RCOP IE beneficial and good for developing communication, improve coordination with the other actors involved and also exchange experience with other projects. GAPS more space for communication and exchange, e.g. at project level Improve quality of participants: senior staff, decision- making Regular participation – for the interest of the programme, not project

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey Group exercise 2 Tasks of the RCOP SCM – an useful body for the OS. Other stakeholders?

IPA Funds Monitoring and Evaluation December This project is co-financed by the European Union and the Republic of Turkey FOR AN EFFECTIVE RCOP SMC Membership – manageable, but still representative (regional level) Membership – capacity to deal with programme-related issues (s, dnks) Qualitative documents (comprehensive and concise, e.g. AIR) Timing Meeting preparation: pre-meetings, in groups (themes, objectives, priority axes, target group: projects vs. strategic stakeholders) Information at project level – on process, bottlenecks, solutions, results Team building and honest&substantial discussions among all stakeholders