1 HER Arc RF seals M. Sullivan MAC Review Oct. 25-27, 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Longitudinal Expansion of RFQ Vane Ends at Section-to-Section Interface.
PillBox Cavity Update (Button Tests) Bob Rimmer NFMCC CM University of Mississippi Jan 13, 2009.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
Slides from Mike Sullivan’s Presentation at the 2E34 Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
LAPPD status report. 6cm system status  System up and running since July –Temperature profile carefully mapped out in sealing and deposition chambers.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Installation. Indoor Unit Installation Typical Installation.
Tracker Thermal Control System 2015年9月13日星期日 2015年9月13日星期日 2015年9月13日星期日 1 AMS-TTCS Status Report AMS-TIM meeting, CERN, Oct.28 th, 2008 ZH He On behalf.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
SPS High Energy LSS5 Thermal contact & cooling aspects
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
Run coordinator report March 23 – 30, 2011 Brad Sawatzky JLab MCC 1:30pm Meeting March 30, 2011 Q weak.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
LCWS11 WG4 Fully featured accelerating structure engineering design
Ti/SS transitions A.Basti INFN-PISA*
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
FP420 Detector Cooling Thermal Considerations
The IR beam pipe M. Sullivan For
23 April 2012 Tom Markiewicz/SLAC
Current Design and Short Status
LARP Phase II Secondary Collimator RC-1
Cryomodule Assembly Plan
Presentation transcript:

1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review November 15-17, 2007

2 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Outline Quick review of status last October Discoveries during Run 6 Status of replacement effort Summary

3 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Story as of last October We had found 5 bad RF flex flange seals and had replaced them with new (same design and material) seals We had borescoped the beam pipe as much as we could in 2 of the 6 arcs looking for other bad RF seals and did not see any other bad seals We were trying to think of some way of instrumenting at least some of the seals

4 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Example of a melted RF seal Inside of ring These GlidCop fingers are brazed onto the SS mounting plate

5 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Molten copper

6 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 RF seal from Arc 7 Inside of ring Arcing deposits enough heat to locally melt the copper

7 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 These omega fingers are over crushed Melted the Ag plating Silver melts at 1200 deg C (2200 def F)

8 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Some Numbers from last October Each arc has 32 cells. Each cell has a bellows module with 2 RF seals and a zero length (flex flange) bellows with one RF seal. Arc 9 –11 cells worth of bellows and flex flange RF seals checked –All bellows ok –3 flex flange RF seals melted Arc 7 –18 cells worth of bellows and flex flange RF seals checked (8 cells checked in July of these 8 four were rechecked) –3 bellows replaced in July 2006 –1 bellows found with several disconnected fingers –1 bellows found with 1-2 displaced fingers –2 flex flange RF seals melted Arc 1 (Some evidence of a problem but did not look) No problems with any of the RF seals at the bellows

9 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Mechanics Plan View The zero length bellows is located on the long ~5.4 m dipole chamber where it attaches to the quadrupole chamber Pivot Point Fixed arm Allowed chamber motion Quadrupole chamber

10 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Findings During Run 6 We decided to instrument the flange joint with a TC attached to the Cu as close as possible to the top bolt holding the RF seal plate even though the Cu is water cooled We started to find remarkably high temperature readings on certain seals and decided we needed to instrument every single RF seal By the middle of June we had attached a TC to all but about 5 joints We found a large number of seals with temperature increases of over 50 deg F  T

11 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Location of the TC The RF seal is almost thermally isolated

12 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 More Run 6 findings Throughout the run we identified several particular RF seals that had a very high temperature increase (as much as 100 deg F  T) associated with beam aborts in the HER and with vacuum spikes in nearby pumps We had on hand ten seals with Inconel fingers and started to replace particularly bad seals with these new seals The new seals showed very good temperature behavior which prompted us to consider replacing a significant fraction of the 192 RF seals in the HER this fall We initially thought we could only replace about seals but the MFD group here at SLAC developed a production line that will give us enough seal sets to replace all 192 flex seals (minus the 5 we had already installed during the run)

13 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 PR12 Arc 1b Tally July 3-6, 2007 HER Current 3 Days Good Bad Good

14 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 PR06 Arc 5c Inspected 10jul07 Replaced 10jul07 Inc Inspected 10jul07 Some melting Looked OK Some melting

15 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 PR06 Arc 5c Inspected 10jul07 Replaced 10jul07 Inc Inspected 10jul07 Some melting Looked OK Some melting

16 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Spreadsheet indicating high temperature (RED) and low temperature (Blue) RF seals for 3 different data sets. Also compared to peak temperature data. We removed this seal in order to inspect it

17 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 New RF Seal Design Same as the old design but omega fingers made out of silver plated Inconel. The entire SS plate is silver plated.

18 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Replacement Progress We quickly found that looking at the seals with a bore scope did not tell us whether or not the seal was damaged so we started replacing all seals soon after starting We have replaced over 155 RF seals So far we have found 7 seals that look OK (No visible damage like arcing, melting etc.) Of the 155 bellows we have looked at we have had to replace about 5 due to previously identified small leaks or to bellows finger problems. None of the bellows have shown any sign of arcing and/or heating. Nor have nay of the bellows RF seals. We are making excellent progress and still plan to replace all the RF seals in the HER before we startup next month

19 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 These pictures are from the worst RF seal found in arc 1 The SS plate is distorted Copper melts at 1080 deg C SS melts at 1540 deg C (2550 deg F)

20 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 These pictures are from the worst RF seal found in arc 5 I estimate about 200 W of power are needed to melt the SS washer

21 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 An RF seal that we replaced last fall This seal looks as bad as some of the worse seals that have been in the machine since day one

22 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Signs of arcing These pictures are from a seal in arc 3 (PR ). This is not an unusual seal.

23 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 RF seal from arc 7 Note the crushed fingers

24 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Surface on the long dipole chamber New Inconel RF seal installed

25 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Inconel seal that was installed July 10 This seal was not silver plated The seal looks fine. None of the fingers are damaged and all of the fingers look like they made contact with the adjoining surfaces

26 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Summary Last fall, in looking for bad bellows we uncovered a problem with the RF seals at the flex flange in the HER. We initially thought the problem was not as extensive as it turned out to be. We eventually began to suspect we had a high percentage of failures when we were able to instrument most of the flex flanges with TCs sometime in May-June During this present down the percentage of RF seals with arcing or heating problems has been found to be quite high (>95%) so we are replacing all 192 seals Replacement progress is going well (5 of 6 arcs are done) We have also set up motion detectors on 2 dipole chambers Many thanks to the hard working members of MFD and MFDV who are making this replacement effort successful!!