March 13, 2002 Daniel Whiteson L3 tracking - muons! Daniel Whiteson LBL.

Slides:



Advertisements
Similar presentations
SU1 sample 176 k events Athena Full Reconstruction.
Advertisements

Freiburg Seminar, Sept Sascha Caron Finding the Higgs or something else ideas to improve the discovery ideas to improve the discovery potential at.
 Trigger for Run 8 Rates, Yields, Backgrounds… Debasish Das Pibero Djawotho Manuel Calderon de la Barca Analysis Meeting BNL October 16, 2007.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
W’  tb  lnubb efficiency VS. electron/muon P T cut muon channel electron channel.
Daniele Benedetti CMS and University of Perugia Chicago 07/02/2004 High Level Trigger for the ttH channel in fully hadronic decay at LHC with the CMS detector.
1 W’  tb  lnubb: the first read. 2 introduction sample: W’  tb  lnubb generator: PYTHIA number of events: 5000 will only use events in the good run.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
Trigger efficiencies for GMSB Andrea Bangert Santa Cruz Institute for Particle Physics April 19 th,
GLAST LAT Project Test Beam Meeting, June 6, 2006 S. Funk 1/6 PS Positron Simulations Stefan Funk June 6, 2006.
A data-driven performance evaluation method for CMS RPC trigger system & Study of Muon trigger efficiencies with official Tag & Probe package for ICHEP.
L3 Muon Trigger at D0 Status Report Thomas Hebbeker for Martin Wegner, RWTH Aachen, April 2002 The D0 muon system Functionality of the L3 muon trigger.
Ji Hyun Kim Korea University. Introduction Results of Trigger Study – Event generation – Trigger efficiency Trigger rates and Statistics 25 – 26 Sep.
Muon alignment with Cosmics: Real and Monte Carlo data S.Vecchi, S.Pozzi INFN Ferrara 37th Software Week CERN June 2009.
H->ZZ->4l Update Trying to re-do CSC note: MC Sample Trigger Eff. Electron Selection Eff. Muon Selection Eff.
Performance of PHENIX High Momentum Muon Trigger 1.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Selection cuts on Bs→ with FTK F. Crescioli, P. Giannetti, M. Dell'Orso, G. Punzi, G. Volpi 2/5/2006.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
Status of Muon Trigger Efficiency Measurement for ICHEP Benedikt Hegner, Benjamin Klein, Yvonne Küssel, Patricia Lobelle, Markus Marienfeld, Rahmat Rahmat,
Study of L1 and HLT efficiency in VBTF Monika Jindal (Panjab University, Chandigarh) Jasbir Singh (panjab University, Chandigarh), Kajari Mazumdar (TIFR,
NA60 Group meeting, 31 March 2005, Markus Keil1 Update on the pixel efficiencies in the Indium run 2003.
Harry Melanson, CPB, 30OCT02 P13 RECO STATUS History: p – October 4 (on schedule) p
L3 Filtering: - short- and medium term plans - how you can help out All-D  Meeting: 14 th March 2003 Terry Wyatt (FNAL-CD/Manchester) on behalf of the.
MuID Software Status/Future Plan Yajun Mao (RIKEN/CIAE) PHENIX Muon Collaboration Meeting, BNL, Dec. 16, 2000.
28 July 2006 CERN REU Status Report 1 Lindsey Gray, University of Florida RCT Trigger Supervisor and Database Project Status Lindsey Gray Advisors: Dr.
1 Silke Duensing DØ Analysis Status NIKHEF Annual Scientific Meeting Analysing first D0 data  Real Data with:  Jets  Missing Et  Electrons 
Status of RPC trigger analysis and Muon Trigger efficiencies for W-> μν study By Archana Sharma, Suman B. Beri Panjab University Chandigarh India-CMS Meeting.
MuID LL1 Study (update) 09/02/2003 Muon Trigger Upgrade Meeting.
W/Z Plan For Winter Conferences Tom Diehl Saclay 12/2001.
Drell-Yan study in CMS at 10 TeV, with 100 pb -1 Monika Jindal K.Mazumdar, D. Bourilkov, J.B. Singh 1LHC Physcis meeting.
Tracking Software Status Tracking Software Status Norman A. Graf for the tracking group ( prime architect: David Adams ) Software and Data Analysis Workshop.
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
High Multiplicity Trigger Operation Status RIKEN/RBRC Itaru Nakagawa On behalf of Toru Nagashima, Aaron Key, SeYoung Han, Shoichi Hasegawa 1.
FTKSim Status and plans FTK Meeting 07/13/2006 F. Crescioli, M. Dell'Orso, G. Punzi, G.Volpi, P. Giannetti.
Paul Balm - EPS July 17, 2003 Towards CP violation results from DØ Paul Balm, NIKHEF (for the DØ collaboration) EPS meeting July 2003, Aachen This.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
Pocket User Guides Level 3 Muon Tools Paul Balm Oct 26, 2000 The ScriptRunner Tutorial Linked from: www-d0.fnal.gov/~balm/muon/
L3 Algorithms: status and plans for the near future All-D  Meeting: 1 st March 2002 Dan Claes and Terry Wyatt.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
Penny Kasper Fermilab Heavy Quarkonium Workshop 21 June Upsilon production DØ Penny Kasper Fermilab (DØ collaboration) 29 June 2006 Heavy Quarkonium.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
Data vs MC … issues of the K +- group 1.Accidentals … contribution from Erika & Roberto 2.DC background.
Thursday, March 13th Z   had Z  had Preselection Efficiencies (muon) Backgrounds + Cuts Trigger Back to the Tau..and what remains to.
W/Z Muon Selection For Winter Conferences Tom Diehl Saclay 12/2001 “Tight” and “Loose” Muon selection for the WZ group.
Muon Efficiency and Fake Rate Two Dimension Fit Exclusive B->JPsiMuMu Analysis in CMSSW_3_1_2 1.
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
The MiniBooNE Little Muon Counter Detector
Offline Software A. Dobbs CM43 30th October 2015.
TPC status - Offline Q&A
A Fast Hardware Tracker for the ATLAS Trigger System
BTeV Muon Trigger Algorithm: Timing: R&D: Overview
STAR Detector Event selection and triggers Corrections to data
EEE telescope simulation
Muon Trigger Software Status
Mini Tower Preliminary Results
Search for coincidences and study of cosmic rays spectrum
Search for Narrow Resonance Decaying to Muon Pairs in 2.3 fb-1
Samples and MC Selection
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
Muon Trigger Acceptance Study
Higgs  update Catalin and Tony May 22, 2007
MC production plans : 1/08/ /03/2001
K/p fakes rejection VERY Preliminary Full offline environment
Presentation transcript:

March 13, 2002 Daniel Whiteson L3 tracking - muons! Daniel Whiteson LBL

March 13, 2002 Daniel Whiteson Single muon trigger Triggers mu1ptx{a,b,c,w}txx are prescaled by 20 and are very impure (~5%) An improvement in rejection could increase the physics bandwidth for real muons (find more W ’s!)

March 13, 2002 Daniel Whiteson Can we find muon tracks? GTR L3Global Tracker Propagate tracks to the muon A-layer, look for match in dr = local distance in plane of A-layer

March 13, 2002 Daniel Whiteson Track spectrum - run We need to look at the Pt spectrum of the leading tracks Events with no track found Rejection Factor = 1/(1-%remaining)

March 13, 2002 Daniel Whiteson Efficiency & Rejection Rejection Factor from leading track Event Efficiency on sample of tight offline  with pt>3.0 At 50% efficiency, rejection of ~20 CFT Tracking with 8 hits required

March 13, 2002 Daniel Whiteson Parameter Comparison

March 13, 2002 Daniel Whiteson L3-GTR track matching Using offline geometry database Number of SMT hits jumps!