W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W. Smith, U. Wisconsin, LHCC CMS Review, May 6, 2008 Trigger Coordination - 1 Trigger Coordination Report Wesley H. Smith U. Wisconsin CMS Trigger Coordinator.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
W. Smith, US CMS Meeting, April 8, 2006 CMS Trigger - 1 Click to edit Master title style US CMS TriDAS 2006 US CMS Meeting Wesley H. Smith, U. Wisconsin.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
CMS November Upgrade Week
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
SLB Synchronization in H4 Beam (LIP - Lisbon)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager January 18, 2006 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status M&O Plans Upgrade R&D This talk is available on:

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 2 L1 Trigger Hardware Overview US CMS Trigger (this talk) US CMS fully responsible US CMS partially responsible Groups: U. Florida Rice UCLA Wisconsin

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 3 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Back Bar Code Front Regional Cal. Trigger Milestone: Production & Testing Complete Receiver Card: Electron Isolation & Clock: Jet/Summary: Receiver Mezz. Card BSCAN ASICs Sort ASICs BSCAN ASICs Phase ASIC 132/153 tested (126) 153/154 Tested (126) 23/25 tested (18) 22/25 tested (18) 26/28 Custom Backpl Tested (18) fraction tested* (needed) EISO Clock Front Back *will test rest for extra spares

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger RCT Full Crates Operating at CERN - U. Wisconsin Rear of Full RCT crate fully cabled to HCAL trigger primitive logic Front of Full RCT crate with Jet Capture Card that continuously samples output, checks on the fly for errors and provides readout of 256 crossings M&O support used to keep operational, use in integration tests

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 5 Endcap Muon Trigger Milestone: Production & Testing Complete Mezzanine card TLK2501 serializers OptomodulesGTLP Receivers VME Interface (glue logic) Muon Port Card (Rice): Final production done (tested 67) Total needed: 60 (75 incl. spares) Sector Processor (Florida): Backplane produced (1 needed) 20 SP produced (12 needed): Muon Sorter (Rice): Sorter produced (1 needed)

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 6 CSC trigger in cosmic challenge Currently set-up in SX5 as operated in 2004 beam tests Connected 10 chambers in ME+2 & ME+3  20 ° full slice on YE+2 CSC Track-Finder will provide a cosmic muon trigger based on a coincidence of LCTs in two or more disks Currently 50Hz with 2-station coincidence CSC track finder has already provided triggers used to pass data from the CSCs to the global DAQ. SP

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 7 Operate fully functional trigger electronics at CERN Employed in myriad tests & preparation activities Tests in Electronics Integration Center Labs & row of racks for all electronics subsystems Test interfaces & integration as much as possible before move to USC55 Surface & “Magnet” tests in SX5 With both HCAL and EMU More during magnet test Verify trigger functions & interfaces w/detectors on surface. Installation in Underground Counting Room (USC55) Expect start by April ‘05 --”ready for crates” Racks, Infrastructure installed & operational Trigger Upgrade R&D Start initial design work & technology investigations Underground Counting Room Trigger M&O Activity

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 8 Electronics Schedule (8) month slip wrt. schedule shown at MEG Feb ‘05 (‘04) Start Installation was Dec ‘05 (June ‘05) in Feb ‘05 (04) (access/cooling:USC55)

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 9 Electronics Integration Center (Building 904) User Labs LV Tests System Tests Trigger Tests Assemble one each of critical racks in central trigger core in underground counting room Readout & trigger electronics testing labs See Next Slide

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 10 Central Integration Racks Large scale integration tasks in central racks: Calorimeter trigger operating with CMS timing & control infrastructure HCAL ECAL RCT TTC GT HCAL HTR ECAL TCC RCT Successful integration tests with regional calorimeter trigger, global calorimeter trigger, HCAL and ECAL trigger primitive logic:

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 11 HCAL-SLB-RCT Integration in EIC - Maryland, Lisbon, Wisconsin Sent synchronous jet data from HCAL HTR Cards thru 6 SLB over 10m copper 4Gb/s Vitesse Links to 6 Regional Calorimeter Trigger Receiver Mezzanine cards, thru Receiver Cards, Backplane and Jet Summary Card to Jet Capture Card that records the output of 256 crossings. Observed output jets on all channels in expected crossings.

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 12 CSC Track Finder Integration - Florida, Rice, UCLA Slice Test: cosmics running now! preparing full readout and self triggering of a whole trigger sector (60 o ). Since April 05 self-triggering with as close to nominal CMS setup as possible used to pass data CSCs to global DAQ. Goal: magnet test with 1/12th of the fully functioning CSC detector system EIC Integration Integration tests with Drift Tube Track Finder started Have CSC TF crate running in EIC Now have full crate working at Florida (above)

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 13 CSC Trigger Integration with Global Muon & Global Triggers Muon Sorter Board Rice Muon Sorter sorts Sector Processor muons & transmits to Vienna Global Muon Trigger: Integration Test successful

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 14 Install/Commission: Next Steps Magnet Test (a.k.a. cosmic challenge) : Drift Tube Trigger: Main trigger along with RPC Trigger with dedicated logic CSC Trigger: 40  (or 60  ) Slice: 24 CSCs from Sector 5, overlaps with DT sectors 10, 11 SP  Clock & Control Board  Local Timing Controller Calorimeter Trigger: Existing HCAL  RCT  JCC system brought to point 5 on demand provides full HCAL module trigger Trigger provided to all participating subsystems USC55: Planned start April 2006 All trigger systems first tested in Prevessin 904 Nothing is installed in a rack in USC55 for the first time

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 15 Trigger Install Schedule - I Install/Commission Trig. Crates: Apr ‘06 - Sep ‘06 Tested Trigger Crates installed, re-tested, interconnected, inter-synchronized Regional and Global Detector trigger systems integrated with each other and Global Trigger Integrate w/Detector Elect.: May ‘06 - Oct ‘06 Cal Trig connected to E/HCAL USC55 electronics Muon Triggers connected to optical fibers carrying trigger data from detector Global Trigger connected to TTC distribution system Operation with Local DAQ

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 16 Trigger Install Schedule - II Integrate w/Central Trig. & DAQ Oct ‘06 - Mar ‘07 Subset of triggers available to detectors in UXC55 Dedicated testing with individual detectors Detailed synchronization testing of all systems Testing with Central DAQ System CommissioningApr ‘07 - Aug ‘07 Full capability of trigger system available Tests with all detectors and trigger operating simultaneously together and partitioned Trigger and DAQ can operate in 8 separate partitions Ready for Data Taking August, 2007

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 17 DStore Cell (TS) Cell (GCT) … Cell (GT) DB HTTP interface (JSP/TOMCAT) RC session (FM) TS client (Web page) Cell (ECAL) DB SOAP interface (XDAQ) Run Control Trigger Supervisor Database side Configuration / conditions DB Trigger Software Configuration data Use CMS Configuration DB Infrastructure Trigger Supervisor (see below) Integrate with Run Control and trigger sub-systems Trigger testing and monitoring Translate Integration Test Plans into Software  Bldg 904 setup Trigger Online Monitoring  Use DAQ Monitoring Infrastructure

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 18 The Trigger Supervisor GUI Vienna & Wisconsin Integrated with RCT, ECAL, GT, CSC, GMT All subdetectors producing TPGs are being integrated with configuration DB with Trigger Supervisor

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 19 Trigger Supervisor Demonstrator Central Cell GT Cell RCT Cell GMT Cell gtswpc1.cern.ch: :1972 Pcyestercm.cern.ch:1972 Pcwiscms.cern.ch:1972 Web browser Marc, Wisconsin Philipp, HEPHY Tobias, HEPHY Monika, Wisconsin Ildefons, HEPHY 3 nations, one trigger supervisor! Switzerland FranceAustria

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 20 Physicist M&O Tasks Change trigger as beam conditions change Study new trigger configurations Test runs, Monte Carlo studies, data studies Trigger Physics Analysis Understand detailed impact of trigger on physics Preparation for luminosity increases Monte Carlo studies of new conditions, validate with present data Respond to changing apparatus Changes in material, configuration, etc.  changes in simulation Operations - 24x7 support during running Write, test & maintain electronics test programs Maintain & update bad channel list & run daily checking programs Run Control maintenance Trigger data validation and calibration Online & Offline analysis of rates & efficiencies Monte Carlo & data trigger simulation maintenance Continuous validation of trigger using simulation & readout data

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 21 SLHC Upgrade Planning Luminosity upgrade x10 – SLHC : L = cm -2 s -1 Extends LHC mass reach by ~ 20-30% with modest changes to machine Detector upgrades needed -- especially the trigger & tracker Time scale ~ 2014 Attempt to restrict upgrade to post-TPG electronics as much as possible where detectors are retained Only change where required -- evolutionary -- some possible pre-SLHC? SLHC Upgrade Committee Members - Tracker: G. Hall, ECAL: P. Busson, HCAL: A.Baden, Muon: C. Wilmott, Trigger: W. Smith, Computing/Physics: D. Acosta, Microelectronics: A. Marchioro, Opto- electronics F. Vasey, J. Nash, Spokesperson, Deputy Spokesperson, Technical Coordinator, Deputy Technical Coordinator Meeting During Electronics Weeks Future Meetings End January 2006 CMS Week March 2006 Planning for April Workshop April 3/ Perugia

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 22 SLHC Trigger Upgrade LHC: Level 1: Regional to Global Component to Global SLHC Proposal: Combine Level-1 Trigger data between tracking, calorimeter & muon at Regional Level at finer granularity Transmit physics objects made from tracking, calorimeter & muon regional trigger data to global trigger Implication: perform some of tracking, isolation & other regional trigger functions in combinations between regional triggers New “Regional” cross-detector trigger crates Leave present L1+ HLT structure intact (except latency) No added levels --minimize impact on CMS readout

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 23 SLHC L-1 Trigger R&D New Features: 80 MHz I/O Operation Level-1 Tracking Trigger Inner pixel track & outer tracker stub Reports “crude” P T & multiplicity in ~ 0.1x 0.1    Regional Muon & Cal Triggers report in ~ 0.1 x 0.1    Regional Level-1 Tracking correlator Separate systems for Muon & Cal Triggers Separate crates covering    regions Sits between regional triggers & global trigger Latency of 6.4  sec R&D program & technologies motivated by needs: Complicated Algorithms & Low Latency: FPGA’s: faster, more logic -- less custom logic -- programmable Faster and larger memories Moving more data at higher speed: Link technology: speed & integration Backplane technology: connectors & newer interconnect technology Higher Crossing Frequency: High speed clocking: low jitter - design for links Overall Complexity: Design for test, diagnostics, algorithm validation

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 24 Trigger M&O, R&D Plans Labor costs include minimum level of existing personnel who designed/built the system Maintain the “long-term memory” Not supported by base program Engineers are split between M&O and Upgrade R&D Physicists & student salaries are not included Project provides COLA support for physicists resident at CERN Extremely important given limited resources of University base program

W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 25 Trigger M&O Summary Good Progress on all fronts: CAL & EMU Triggers finished production Operations at CERN underway Integration tests complete or underway Software is in use and development continues M&O Activity in ‘06: Installation: Time is tight to accomplish the necessary tasks Steps taken, planning established to meet schedule Tests: Surface Tests in SX5, incl. Magnet Test in Spring ‘06 Extensive use of Electronics Integration Center Careful layout and plan for USC55 starting Apr. ‘06 Upgrade R&D: Design work: build on evolving concepts for higher luminosity Investigate enabling technologies to understand implementation