Scoping a Commissioning Job in Terms of Contractor Involvement ???

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

M.A. Young and Company 1 This is a slide show Just click your mouse button on the bar to the right each time you want to move to the next slide. Use your.
Managing a Successful Mechanical System project Following design – what next?
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
What Constitutes a Quality Commissioning Job?. Agenda Preconstruction Services –Brian Toevs, PE Construction Services –Rusty Ross, PE, LEED TM, CxA Client.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Close Out of a Construction Project, …the Hardest Part. PASBO 49th Conference Clinic Table March 12, 2004 Richard A. Bernardini, PE Vice President.
General Services Division / Project Administration FINAL INSPECTION AND ACCEPTANCE “It ain’t over till it’s over.” (Yogi Berra)
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Building Commissioning
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Project Close Out CTC-470.
Conditions of the Contract for Construction
ACG CxA WORKSHOP WEBINAR CxA Workshop St. Petersburg, Florida 8:00 AM 13 October 2008Renaissance Vinoy Resort CxA Workshop St. Petersburg, Florida Renaissance.
ACG CxA WORKSHOP WEBINAR Facility Commissioning Group AABC Commissioning Group - CxA Workshop Las Vegas, Nevada – MGM Grand April 22, 2008 Jim Magee, CxA.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
5 Assuring Building Performance Page 72
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
PMI Bluegrass May 2012 Lunch Presentation: Commissioning Building Systems Commissioning for Project Managers.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning.
Standards of Practice Course
The Benefits of Building Commissioning Carl N. Lawson Hanson Professional Services Inc.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Cx Sequence of Events ICE ActivitiesOAC Activities Cx RFP Response to RFPOwner issues Cx contract Initialization Letter to Architect.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
SYSTEMS MANUALS A Systematic Approach Craig Hawkins, CxA.
Topic1b: Project Life Cycle
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
CVE 4070 Construction Engineering Shop Drawings Quality Control
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
ASSOC.PROF.DR. İBRAHİM YİTMEN
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
the Basic Commissioning (Cx) Process
Construction Management At Risk Process
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Introduction to LEED Building Commissioning
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Grant Orientation Session
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Optimization for Airport Facilities
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
The Business of Commissioning
Grant Orientation Session
Presentation transcript:

Scoping a Commissioning Job in Terms of Contractor Involvement ???

Systems to be Commissioned Or Contractor Performance Expectations What do we mean by Scope?

Whose Expectations? Owner ? –Doesn’t know what to expect Contractor ? –Do less work... Make more money Design Professional ? –We don’t do means and methods

Whose Should Define Expectations? Owner, Architect, CM, GC? CxA ? –We don’t define Scope, but we should help. –Just like Owners Project Requirements –Just like Basis of Design –Should it be in the Cx Spec?

What About Specs.? So far, the design Community has not paid much attention to Cx. Specs. MasterSpec Section Cx of HVAC (01815) (15995) –CxA’s Responsibilities Provide Project specific construction checklists and process test procedures. Direct Cx tests. Verify testing, adjusting and balancing of Work are complete. Provide test data, inspection reports, and certificates in Systems Manual.

What About Specs.? MasterSpec Section Cx of HVAC (01815) (15995) –Contractors Responsibilities Perform commissioning tests at the direction of the CxA Attend construction phase controls coordination meeting. Attend TAB review and coordination meeting Participate in HVAC orientation and inspection as directed by CxA Provide information requested by CxA for final Cx documentation. Provide measuring instruments & logging devices and provide data acquisition equipment to record data for the complete range of testing for the required test period. Not Process or Scope MasterSpec is “product oriented”

What About Specs.? ACG specifications Section (15995) (230800) –CxA Responsibilities 4 pages of criteria Organize and Lead Develop schedules, schedule meetings Develop documentation: RTFs, SVCs, FPTs, Cx Plan Monitor Point to Point, witness startup Understand, direct and witness ALL FPTs Schedule and verify training Complete report

What About Specs.? ACG specifications Section (15995) (230800) –Contractors Responsibilities Evaluate deficiencies Cooperate with CxA Attend meetings Review Cx documentation Complete Checklists Accomplish test procedures Provide Training This is More Process than Scope

So back to Scope What’s the problem? –Interface between trades –Actually completing the project –Making sure the systems function before functional testing –What if the balancer was not truthful –Who is responsible for making sure the building is tight.

So back to Scope How do we fix it? –Do we help define contract boundary limits? –Do we ask the contractors to write narratives?

So back to Scope How do we get to the end? –What happens if the CxA and the owner do everything right but the contractor won’t finish If there is only 10% retainage left on the project and the contractor walks away.

Does anyone have Comments? Thank you