Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Houston Region Import Capacity Project Planning for Reliable Power.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Project
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
CSC/CRE Technical Review 6 October Outline  Review the process used in calculating Power Transfer Distribution Factors (PTDFs).  Information.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Discussion: Use of RAPs in system operations Kris Dixit 1.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Houston Area Dynamic Reactive Project March 11,
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
ERCOT 2009 CSC Proposal 3h Mark Garrett – Direct Energy Clayton Greer – J Aron.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
Lyndonville Electric Department Feasibility Analysis Review December 2,
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
West to North CSC Location Scenario 3b WMS August 20, 2008.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Review of SONI Power System Operations Alex Baird Grid Operations Manager Real Time.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
December 2, 2004 Congestion Causes and Effects Presented to WMS January 14, 2005 Beth Garza.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
CSC DETERMINATION PROCESS
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
Mark Garrett – Direct Energy Clayton Greer – J Aron
ERCOT 2009 Five-Year Transmission Plan Update
Warren Lasher Manager, Long-Term Planning and Policy
RMR Exit for Spencer 5 – Remedial Action Plans
Review of Abnormal MCPEs
Presentation transcript:

Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008

1  During the first six months of 2008, ERCOT has experienced over $135 million in North to South CSC Congestion Primary drivers of this congestion appear to be: 1. Significant growth in the amount of installed wind farms primarily in the West Zone where a large portion of the energy output flows through the North Zone to both the South and Houston Zones.  More than 2,200 MW of wind were added in the past 12 months  Almost 3,000 MW of wind capacity is scheduled to be installed in the remainder of Heavily loaded underlying 138 kV and 69 kV transmission in the Waco / Temple / Killeen area, as well as the Bryan / College Station area that has limited ability to support large amounts of post contingency North to South Transfers. 3. Generation availability assumptions, both thermal and hydro, that have been materially different in Real Time operations than in the SSWG planning cases. 4. ERCOT Operation’s utilization of North to South CSC Zonal Balancing to resolve congestion on some elements where it had limited benefit.

2 Summary of Indicative N-S CSC Congestion Constraints  Watson Chapel – Robertson 138 kV line experienced significant congestion  After June 9, 2008 PRR764 resolved this constraint with Local Congestion

3 Summary of Local Congestion Days By Constraint

4 What recent projects help reduce these problems During the past six months, these noteworthy area upgrades have been placed in- service: 1.Lake Creek – Temple Pecan Creek 138 kV Line upgrade from 186 MVA to 326 MVA (May 2008) 2.Temple Pecan Creek – Temple Sw. 138 kV Line upgrade from 326 MVA to 492 MVA (June 2008) 3.Lampasas – Adamsville – Evant 138 kV Line upgrade from 84 MVA to 220 MVA (June 2008) 4.Goldthwaite 138/69 kV Auto upgrade from 25 MVA to 45 MVA (June 2008) 5.Copperas Cove – Ding Dong 138 kV Line – new construction (June 2008) 6.Austrop – Decker 138 kV Line upgrade from 480 MVA to 710 MVA (June 2008) Projects in TPIT that will help reduce this problem? Projects scheduled by June 2009 should provide relief to the existing constraints. 7.Jack Creek Sw. Station and 600 MVA Auto and associated lines (Sept 2008) 8.Waco West – Lorena 69 kV Line upgrade from 36 MVA to 107 MVA (Dec 2008) 9.Brownwood – Goldthwaite 138 kV Line upgrade from 124 MVA to 266 MVA (Dec 2008) 10.Sandow – Salty – N. Thorndale 138 kV Line upgrade from 214 MVA to 326 MVA (Dec 2008) 11.N. Thorndale – Taylor 138 kV Line upgrade from 214 MVA to 326 MVA (May 2009) 12.Poage–Temple Taylors Valley–Bell County 69 kV Line upgrade from 36 MVA to 107 MVA (May 2009) 13.Temple Elm Creek – N. Temple 138 kV Line upgraded to 394 MVA (May 2009) 14.Killeen Sw. – S. Harker Heights 138 kV Line upgrade from 214 MVA to 326 MVA (May 2009)

5 What’s included in this project proposal?  Two 138 kV line upgrade accelerations  Accelerate projects already identified in TPIT by 1 year  Acceleration cost estimated at $1.8 million  Totals 29.8 miles of line  Three 138 kV line upgrades that have not previously been proposed  Totals 49.0 miles  Estimated total cost of $20.1 million  Six switchable series reactor installations  Located at a total of 4 to 5 sites  Estimated total cost of $9.0 million  One Terminal Equipment upgrade  Estimated cost of $0.03 to $0.20 million

6

7 What were the UPLAN results?  The UPLAN analysis identified 6 upgrades that were economically justified based on production cost savings.  The capital cost of these projects is estimated at $25 million  This includes four series reactors, one 138 kV line upgrade acceleration, and two newly proposed 138 kV line upgrades.  Production cost savings are $21M for Jun-Dec 2009, and $12M for 2010; for a total of $33M.  The Salado-Hutto 345 kV Line and Auto are important upgrades to the N- S limits. A delay in this project provides the proposed projects with an additional $18M in production cost savings.  The potential lack of available hydro generation in the Austin area results in another $16M in production cost savings.  The production cost savings economically justifies these projects in less than 12 months.

8 What were the PowerWorld results? The proposed projects, in combination with projects already scheduled in TPIT, provide a N-S CSC increase of approx. 380 MW This translates to a TTC increase of approx MW. Items highlighted in yellow were also identified in UPLAN studies

9 Conclusion The severe amount of N-S congestion experienced in the past six months necessitates a concentrated effort to quickly mitigate with cost effective transmission If this type of accelerated upgrade schedule is not possible in all cases, then a focused effort should be pursued by ERCOT, the associated TDSPs, and/or interested Market Participants to look for other interim solutions such as:  Feasible Remedial Action Plans (RAPs) or Special Protection Schemes (SPSs)  Elevated temperature operation options that provide some increase in the thermal rating of these lines while further upgrades are being pursued  These types of interim measures (i.e. RAPs and SPSs) are recommended by Section of the ERCOT Operating Guides while more permanent upgrades are being Feasible Remedial Action Plans (RAPs) or Special Protection Schemes (SPSs)