Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE ENGAGE EMPOWER 1
Agenda Completed Construction Projects LAC W Trailers Demo PCC Tech 1 (Sheet Metal) Current Construction Projects LAC Building A – Student Services Retrofit LAC Building I (Bookstore) LAC Master Landscape LAC Stadium Parking Lot Lights and Veterans Stadium Lights PCC MDAB (Multi-Disciplinary Academic Building) LAC PCC Building CC Retrofit Upcoming Construction Projects LAC Math Technology Building PCC Building GG LAC Building C Retrofit Q & A 2
Completed Construction Projects 3 Project addressed storm run off issues with bio swales Site converted to a parking lot Project completed Summer 2011 LAC W Trailers Demo - Measure E 2008
Completed Construction Projects 4 Construction started Summer 2011 Equipment and utilities installed Projected completed before start of Fall semester 2011 PCC Tech 1 (Sheet Metal) - Measure E 2008
Current Construction Projects LAC Building A – Student Services Retrofit Measure E New home for A&R, Counseling, Health Services, Cashier, Transfer Center Project currently in structural upgrade New contractor in place End of construction anticipated Summer 2012
Current Construction Projects 6 Adds additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme Work on framing and utilities underway End of Construction anticipated Fall 2011 Move in planned for late January or early Feburary LAC Building I - Measure E 2008
Current Construction Projects 7 Currently in Design Phase(Finalizing design) Plans to be submitted to DSA November 2 nd Quad areas North and South of Bldg. A will bid Fall 2011 Remaining areas designed at 25% Scope includes new hardscape/landscape and pedestrian pathways LAC Master Landscape - Measure E 2008
8 Stadium Parking Lot Lights and Stadium Lighting Measure E 2008 Current Construction Projects Stadium parking lot lights Construction commenced 9/12 All bases have been installed Currently in the process of installing light poles/fixtures Install energy efficient lights with control capabilities Stadium lighting retrofit Awaiting final DSA approval
Current Construction Projects PCC MDAB (Multi-Disciplinary Academic Building) Measure E MDAB building remodel project Phase 1 of 2 currently under construction Project currently in demolition and structural reinforcement Phase 1 project to be completed Summer 2012
Upcoming Construction Projects PCC Building CC Retrofit - Measure E Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices Swing space located on PCC Campus (Bldg. GG) Approved by DSA on 1/27/11 Bid process complete; awarded to Angeles To be completed concurrently with MDAB project phase 1 Anticipated end of construction Fall 2012
Upcoming Construction Projects Will house Math and Culinary Arts instructional program as well as Reprographics Design Build delivery method Requesting Qualifications (RFQ) – was due 8/3 Shortlisted and interviewed 10 respondents (9/7-9/9) Selected 3 and are currently requesting for proposals Pre-RFP meeting with contractors to take place on 10/27 Anticipated start of construction 2013 LAC Math Technology Building – Measure E
Upcoming Construction Projects PCC Building GG - Measure E Design Build delivery method Request for Qualifications (RFQ) Start in November and due mid December Building to house Health Services, EOPS, DSPS, Financial Aid, Cashier, A&R, and Counseling Estimated start of construction December 2013
Upcoming Construction Projects LAC Building C Retrofit - Measure E Hired Architect to do design work Currently in schematic phase Work includes modernization of structure, classrooms spaces, and office areas
l i b e r a l a r t s Liberal Arts Campus Site Plan
p a c i f i c c o a s t Pacific Coast Campus Site Plan
QUESTIONS & ANSWERS EDUCATE ENGAGE EMPOWER 16