MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009.

Slides:



Advertisements
Similar presentations
® Flats Track for Periodicals, Catalogs & Printers Automating Flat Mail Preparation in the Future Anita Pursley – Worldcolor Brent Raney - USPS National.
Advertisements

1 Scheme Combination Product and Labeling Lists. 2 Agenda Scheme Combination Background Task Team 11 Current Update Process Interim Update Process Future.
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
Relocation Plans for the Flats Sequencing System (FSS) March 14, 2013 To listen to a recording of this presentation please visit:
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
® Flats Symposium 2008 USPS Engineering - Future Technology National Postal Forum ® Walt O’Tormey Vice President, Engineering USPS National Postal Forum.
Automated Package Processing System [APPS] Update February 23, 2006.
Flats Strategy Managing Cost and Maximizing Efficiencies Joe Schick Vice President of Postal Affairs.
Thursday, October 23, 2014 Area Mailing Industry Focus Group Postal/MTAC Update.
Price Change Effective April 26, 2015 Northeast Area Mailing Industry Focus Group Meeting February 25,
® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion.
1 DSCF Entry Discount Review Tampa Bay Suncoast PCC January 14, 2015.
FSS / DPP PROGRAM OVERVIEW Flats Sequencing System & Delivery Point Packaging Status Update February 2005.
Postal Automated Redirection System (PARS) John Keegan Manager, Automation Equipment Engineering Mailers´ Technical Advisory Committee (MTAC) November.
® Flats Track for Periodicals, Catalogs & Printers Steve Forte Senior Vice President Operations, USPS Rosa Fulton Executive Director, FSS National Postal.
1 MTAC Workgroup 117 October 22, 2007 Washington DC.
® MTAC WORKGROUP 113 ADDRESS / BARCODE REQUIREMENTS FOR FSS Update August 1, 2007.
MTAC Update November 6, 2002 Larry Goodman USPS Co-Chair Dan Minnick Industry Co-Chair.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
MTAC Workgroup 114 Periodicals Subgroup Update May 15, 2007.
1 Postal Automation: Initiatives, Transitions & Best Practices Postal Automation: Initiatives, Transitions & Best Practices Part II.
Southern Area Operational Window Change Effective January 5, 2015 August 21, 2014.
National Postal Forum April 12, 2010 National Postal Forum ®
Greater New York Postal Customer Council
Status of NDC Activations MTAC Briefing August 12, 2009.
November 01, 2005 MTAC 93 Design & Concept Testing Workgroup Status.
1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
® Flats Track for Periodicals, Catalogs & Printers David Mastervich Manager, Periodicals, Catalogs & Saturation Rosa Fulton Executive Director, FSS National.
Monthly Updates to Presort Data. Agenda What is Presort Data? History of Update Schedule Important Terms to Understand The New Schedule Transition to.
® MTAC 131 Workgroup Update. 2 MTAC 131 Charter Recap MTAC charter:  This workgroup will focus on the issues regarding communicating what separations.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report February 5, 2004.
1 MTAC 117 Intelligent Mail Barcodes and Electronic Documentation Workgroup Update.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
Moving the Mail. NETWORK FACILITES NDC NETWORK RE-EGGINEERING HOW YOUR MAIL MOVES IMPROVING THE PARNTERSHIP.
Flats Sequencing System Update Mailers Technical Advisory Committee MTAC May 16, 2007 Mailers Technical Advisory Committee MTAC May 16, 2007.
Flats Sequencing System Update Mailers Technical Advisory Committee MTAC February 21, 2007 Mailers Technical Advisory Committee MTAC February 21, 2007.
® Flats Sequencing System Update Managers of Delivery Programs Support March 5, 2008.
Optimizing Parcel Preparation & Entry for Seamless Acceptance Final Presentation MTAC Work Group # 109 Industry Leader: Wendy Smith USPS Leader: Jim Cochrane.
Mailing Industry View and Congressional Update Northeast Area Mailing Industry Focus Group Meeting Joe Schick Vice President of Postal Affairs.
MTAC 117 Performance Based Verification Sept 17, 2007.
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
Product Redesign MTAC Update February 6, PRODUCT REDESIGN Bob O’Brien – Industry Co-Chair John DePiazza Joe Lubenow Clarence Banks Robert Lindsay.
MTAC Workgroup 106 Improve, integrate, and optimize data sources… Brian Euclide, Perry Judd’s Inc. Bob Galaher, USPS Marketing Nov 02, 2006 Washington.
® Flats Sequencing System (FSS) November 20, 2008 Rosa Fulton Phil Fabrizio.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
® August 12, 2009 MTAC General Session August 12, 2009 MTAC General Session Update.
FSS PREP AND ENTRY (WG #115) MTAC, August FSS Prep and Entry Workgroup #115 August 1, 2007 Joe Schick – Quad Graphics Rod Barbee – USPS Engineering.
® Flats Symposium 2008 Bill Galligan Senior Vice President, Operations USPS National Postal Forum ® National Postal Forum 2008.
® FSS Update Rosa Fulton Executive Director, FSS MTAC General Session November 18, 2009.
Confirm/PLANET Codes  MTAC Summary Confirm Program Office
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
August 3, 2006 MTAC Workgroup #95 FAST for Periodicals Update.
® FSS Update Rosa Fulton Executive Director, FSS MTAC May 20, 2010.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
MTAC Flats Sequencing Systems (FSS) New Area of Focus.
® Flats Sequencing System (FSS) February 2009 Cathy MoonPhil Fabrizio FSS Project Office MTAC Meeting.
1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.
1 Update on Proposed Prices and Standards Mailers’ Technical Advisory Committee Steve Kearney Vice President, Pricing & Classification Joe Moeller Manager,
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report May 6, 2004.
Mailing Industry Changes ® PCC Workshop-in-a-Box Module 4 PCC Workshop-in-a-Box Module 4.
PRESORT OPTIMIZATION WORK GROUP February 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
Workgroup # 96 Developing An Interface To The AFSM 100 Automatic Induction Process POSTAL CO-CHAIR DAVE WILLIAMS INDUSTRY CO-CHAIR MIKE WINN.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
1 MTAC WG #175 Update for Northeast Area Focus Group May 4 th,
FLAT MAIL PREPARATION OPTIMIZATION February 24, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC February 24, 2005.
Panel 2: Flats Containerization
Presentation transcript:

MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18,  FSS Update  USPS / IDEAlliance Think Tank II  MTAC 115 in Review  FSS Mail Prep - Next Steps Agenda

® FSS Update Rosa Fulton Executive Director, FSS

MTAC 115 – November 18, Flat Volume by Class FY 2009 RPW -15.3% -7.4% Flat volume decline FY % 6.3 bil pieces Flat volume decline FY % 6.3 bil pieces

MTAC 115 – November 18, Flat Volume Trend RPW Flat volume decline FY % FY 2005 – FY 2009 Flat volume decline 26% 14.3 billion fewer flats annually FY 2005 – FY 2009 Flat volume decline 26% 14.3 billion fewer flats annually

MTAC 115 – November 18,  Sequencing Operations ● Dulles – 4 FSS ● Columbus – 2 FSS ● Kansas City – 2 FSS ● Phoenix – 3 FSS Operations & Installations  Installation of 14 FSS in progress

MTAC 115 – November 18, FSS Operations – Ramp-up Status FSS Site # FSS On-line # Delivery Units On-line # Zones On-line Dulles P&DC Columbus FSS Annex Kansas City P&DC Phoenix (West Valley) L&DC 3827 Totals

MTAC 115 – November 18, Installations – 14 FSS, 9 Sites Area FSS Location Install Start % Complete Install CM CURSEEN-MORRIS DC P&DC 12-Sep-0990% NE NEW JERSEY NDC 12-Sep-0995% NE MID-ISLAND NY P&DC 26-Sep-0965% NE NEW JERSEY NDC 26-Sep-0955% NE NW BOSTON MA P&DC 10-Oct-0945% SE ORLANDO FL L&DC 10-Oct-0920% PA VAN NUYS CA FSS ANNEX 24-Oct-0910% SE SOUTH FLORIDA L&DC 24-Oct-0910% EA TRENTON NJ P&DC 7-Nov-095% SE SOUTH FLORIDA L&DC 7-Nov-095% GL INDIANAPOLIS IN MPA 21-Nov-09 NE MID-ISLAND NY P&DC 21-Nov-09 NE NW BOSTON MA P&DC 5-Dec-09 SE ORLANDO FL L&DC 5-Dec-09 Install schedule of next 25 FSS in progress

MTAC 115 – November 18, FSS Redirection – New Deployment Plan  19 FSS planned for redirection ● Deploy fewer FSS in 10 sites  Two sites removed from original plan  12 new FSS sites  42 FSS sites versus 32

MTAC 115 – November 18, Phase 1A (Redirect Sites) Space Planning FSS Site# FSS Linthicum MD IMF1 Charlotte NC L&DC1 Rochester NYL&DC2 Philadelphia PA NDC1 Philadelphia PA P&DC2 Mid Island NY P&DC1* Westchester NY P&DC1 Stamford CT P&DC1 North Metro GA P&DC2 Atlanta GA L&DC2 North Houston TX P&DC1 Minneapolis / Eagan P&DC2 San Diego P&DC2 * Mid-Island receiving 4 th FSS

® USPS / IDEAlliance Think-Tank II Susan Hawes Operational Requirements

MTAC 115 – November 18,  WG 115 collaborated with IDEAlliance, again! ● Met September 2, 2009 ● Focus: Presort software programs and data files ● Participants this time included production and systems/software representatives  Provided context for Think-Tank II Participants ● Reviewed workgroup recommendations  Auto-ready pallet  Non-compensated bundles  Bundle heights 3”, 4”, or 6” Think-Tank II Meeting

MTAC 115 – November 18, Modeling Exercise  What would FSS pallets look like today? ● Volume and thickness of flats has changed since earlier modeling of bundles and pallets in 2007 ● Pallet prep the same as 5-D/5-D schemes today  Test Plan included real “address lists” for destinating Dulles FSS site ● Using specific ZIP Codes processed on FSS ● Using real mailpiece characteristics and volumes

MTAC 115 – November 18,  Test plan included: ● Bundle and pallet counts ● Current presort rules for comparison ● ‘Artificial’ Labeling List data to use when identifying FSS schemes ● Presort software that used LL to make up bundles and pallets ● Specified bundle heights for each presort processing  Testing process was to: ● Run presort for all 3-digits (201, , 226 and 227) ● Roll up data for non-FSS 5-digits using today’s rules ● Prepare individual FSS sort plan pallets (1-4 5D ZIPs per sort plan) ● Prepare multi FSS pallets based on each site Presort FSS Test Plan

MTAC 115 – November 18,  FSS schemes: ● FSS sort plans mirror 5-digit and 5-digit scheme sort plans ● Dulles currently has 49 FSS sort plans  19 sort plans with 1 5-digit ZIP Code  20 sort plans with 2 5-digit ZIP Codes  8 sort plans with 3 5-digit ZIP Codes  2 sort plans with 4 5-digit ZIP Codes  Test results: ● Periodicals had few FSS sort plan pallets ● Pallet counts remained same for PER and STD mailings ● FSS scheme pallet (all sort plans at a site) has potential Test Plan Results

MTAC 115 – November 18, Test Plan Results Test #Bundle height# BundlesPallet Presort# PalletsWeight Standard Mail 1 209,694 1,6071, ,543 1,6021, ,217FSS FSS Scheme51, FSS FSS Scheme51, FSS FSS Scheme51,819 Periodicals Mail 1 105, , , , FSS FSS Scheme FSS FSS Scheme FSS FSS Scheme1666

® MTAC 115 in Review Krista Finazzo Postal Co-Chair Joe Schick Industry Co-Chair

MTAC 115 – November 18, Workgroup Focus – Issue Statement  Deployment Phase1 FSS ● FSS program will impact:  Flats preparation  How mail is presented and scheduled for entry  Continuous process - mail owner to USPS ● Interdependencies of inputs and outputs through entire process, concept to delivery  Will drive standards/requirements for prep & entry  Will play a major role in determining efficiency of processing on FSS

MTAC 115 – November 18, Desired Results “Identify areas of impact to the USPS and customers associated with preparation and entry of flats in an FSS environment including the lowest combined cost model.”

MTAC 115 – November 18, Workgroup Action Items  Workgroup 96 handed off four items to MTAC WG 115: ● Bundle preparation ● Containerization ● Presort Parameters ● Destination entry

MTAC 115 – November 18, Workgroup Activities  Developed a prototype system “Automated Flats Processor” (AFP) to improve: ● Productivity of bundle processing ● Equipment space required to process daily volume ● Capability to accept multi-zone pallets ● Flats auto processing – induction to piece sorting

MTAC 115 – November 18, Workgroup Activities  AFP key functions are: ● Auto Depalletize Bundles – automatically unloads bundles from pallets ● Distribute Bundles based on sort plans with OEL readability – convey & prep bundles for processing ● Process Bundles – cut and remove bundle strapping and load bundles into ACTs ● Make Dollies – produce sort plan based dollies ● Dispatch Dollies – full ACTs, produced for specific sort plans, released for induct into flats sorting equipment

MTAC 115 – November 18, Workgroup Activities  Bundle / Container testing: ● Built on auto-ready pallet concept ● Evaluated – uniform bundle heights, compensation of bundles, containerization, and bundle securing methods ● Determined counter-stacked bundles of uniform height travel well through transportation / distribution system  Bundle securing methods tested: ● Two cross-straps around length and girth ● Shrinkwrap “bellyband” with a single-strap as alternative to strap only

MTAC 115 – November 18, Workgroup Activities  Discovered auto-ready pallet prep will allow bundles to flow directly to the bundle prep operation and bypass APPS processing  Evaluated potential pallet levels: ● Pure FSS (single scheme) ● Pure FSS (multiple schemes) ● Combined FSS and non-FSS

MTAC 115 – November 18, Workgroup Activities  Assessed impact of volume reduction ● Volume reduction has required more ZIP Codes and FSS sites than original plan ● Some original sites receiving fewer machines ● Volume reduction makes preparation of FSS single- scheme pallets more difficult  Considered single preparation solution ● Lowest end-to-end cost achieved with one bundle preparation method  Prep compatible with FSS and AFSM process

MTAC 115 – November 18, Status of Action Items  Bundle ● Optimal bundle height of 3”, 4”, 6” ● Secured using two cross-straps  Container ● Non-compensated bundles on compensated pallet ● Content determined by FSS scheme & destination  Presort ● Driven by FSS Label List and sort plan contents  Entry ● Destination entry, at minimum, should not change and may contract with optimized network

MTAC 115 – November 18,

® FSS Mail Preparation Next Steps Krista Finazzo Manager, Operational Requirements Rosa Fulton Executive Director, FSS

MTAC 115 – November 18, FSS Flat Mail Prep – Next Steps  Propose new MTAC workgroup ● Workgroup: “Implementing FSS Presort Parameters” ● Align under the “Optimization of Mail Preparation & Entry” focus area  Charter of new workgroup: ● Develop and implement presort parameters to support defined (optional) FSS prep ● Identify timing of software updates related to FSS deployment ● Communicate timing & FSS Label List

MTAC 115 – November 18, In closing