MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009
MTAC 115 – November 18, FSS Update USPS / IDEAlliance Think Tank II MTAC 115 in Review FSS Mail Prep - Next Steps Agenda
® FSS Update Rosa Fulton Executive Director, FSS
MTAC 115 – November 18, Flat Volume by Class FY 2009 RPW -15.3% -7.4% Flat volume decline FY % 6.3 bil pieces Flat volume decline FY % 6.3 bil pieces
MTAC 115 – November 18, Flat Volume Trend RPW Flat volume decline FY % FY 2005 – FY 2009 Flat volume decline 26% 14.3 billion fewer flats annually FY 2005 – FY 2009 Flat volume decline 26% 14.3 billion fewer flats annually
MTAC 115 – November 18, Sequencing Operations ● Dulles – 4 FSS ● Columbus – 2 FSS ● Kansas City – 2 FSS ● Phoenix – 3 FSS Operations & Installations Installation of 14 FSS in progress
MTAC 115 – November 18, FSS Operations – Ramp-up Status FSS Site # FSS On-line # Delivery Units On-line # Zones On-line Dulles P&DC Columbus FSS Annex Kansas City P&DC Phoenix (West Valley) L&DC 3827 Totals
MTAC 115 – November 18, Installations – 14 FSS, 9 Sites Area FSS Location Install Start % Complete Install CM CURSEEN-MORRIS DC P&DC 12-Sep-0990% NE NEW JERSEY NDC 12-Sep-0995% NE MID-ISLAND NY P&DC 26-Sep-0965% NE NEW JERSEY NDC 26-Sep-0955% NE NW BOSTON MA P&DC 10-Oct-0945% SE ORLANDO FL L&DC 10-Oct-0920% PA VAN NUYS CA FSS ANNEX 24-Oct-0910% SE SOUTH FLORIDA L&DC 24-Oct-0910% EA TRENTON NJ P&DC 7-Nov-095% SE SOUTH FLORIDA L&DC 7-Nov-095% GL INDIANAPOLIS IN MPA 21-Nov-09 NE MID-ISLAND NY P&DC 21-Nov-09 NE NW BOSTON MA P&DC 5-Dec-09 SE ORLANDO FL L&DC 5-Dec-09 Install schedule of next 25 FSS in progress
MTAC 115 – November 18, FSS Redirection – New Deployment Plan 19 FSS planned for redirection ● Deploy fewer FSS in 10 sites Two sites removed from original plan 12 new FSS sites 42 FSS sites versus 32
MTAC 115 – November 18, Phase 1A (Redirect Sites) Space Planning FSS Site# FSS Linthicum MD IMF1 Charlotte NC L&DC1 Rochester NYL&DC2 Philadelphia PA NDC1 Philadelphia PA P&DC2 Mid Island NY P&DC1* Westchester NY P&DC1 Stamford CT P&DC1 North Metro GA P&DC2 Atlanta GA L&DC2 North Houston TX P&DC1 Minneapolis / Eagan P&DC2 San Diego P&DC2 * Mid-Island receiving 4 th FSS
® USPS / IDEAlliance Think-Tank II Susan Hawes Operational Requirements
MTAC 115 – November 18, WG 115 collaborated with IDEAlliance, again! ● Met September 2, 2009 ● Focus: Presort software programs and data files ● Participants this time included production and systems/software representatives Provided context for Think-Tank II Participants ● Reviewed workgroup recommendations Auto-ready pallet Non-compensated bundles Bundle heights 3”, 4”, or 6” Think-Tank II Meeting
MTAC 115 – November 18, Modeling Exercise What would FSS pallets look like today? ● Volume and thickness of flats has changed since earlier modeling of bundles and pallets in 2007 ● Pallet prep the same as 5-D/5-D schemes today Test Plan included real “address lists” for destinating Dulles FSS site ● Using specific ZIP Codes processed on FSS ● Using real mailpiece characteristics and volumes
MTAC 115 – November 18, Test plan included: ● Bundle and pallet counts ● Current presort rules for comparison ● ‘Artificial’ Labeling List data to use when identifying FSS schemes ● Presort software that used LL to make up bundles and pallets ● Specified bundle heights for each presort processing Testing process was to: ● Run presort for all 3-digits (201, , 226 and 227) ● Roll up data for non-FSS 5-digits using today’s rules ● Prepare individual FSS sort plan pallets (1-4 5D ZIPs per sort plan) ● Prepare multi FSS pallets based on each site Presort FSS Test Plan
MTAC 115 – November 18, FSS schemes: ● FSS sort plans mirror 5-digit and 5-digit scheme sort plans ● Dulles currently has 49 FSS sort plans 19 sort plans with 1 5-digit ZIP Code 20 sort plans with 2 5-digit ZIP Codes 8 sort plans with 3 5-digit ZIP Codes 2 sort plans with 4 5-digit ZIP Codes Test results: ● Periodicals had few FSS sort plan pallets ● Pallet counts remained same for PER and STD mailings ● FSS scheme pallet (all sort plans at a site) has potential Test Plan Results
MTAC 115 – November 18, Test Plan Results Test #Bundle height# BundlesPallet Presort# PalletsWeight Standard Mail 1 209,694 1,6071, ,543 1,6021, ,217FSS FSS Scheme51, FSS FSS Scheme51, FSS FSS Scheme51,819 Periodicals Mail 1 105, , , , FSS FSS Scheme FSS FSS Scheme FSS FSS Scheme1666
® MTAC 115 in Review Krista Finazzo Postal Co-Chair Joe Schick Industry Co-Chair
MTAC 115 – November 18, Workgroup Focus – Issue Statement Deployment Phase1 FSS ● FSS program will impact: Flats preparation How mail is presented and scheduled for entry Continuous process - mail owner to USPS ● Interdependencies of inputs and outputs through entire process, concept to delivery Will drive standards/requirements for prep & entry Will play a major role in determining efficiency of processing on FSS
MTAC 115 – November 18, Desired Results “Identify areas of impact to the USPS and customers associated with preparation and entry of flats in an FSS environment including the lowest combined cost model.”
MTAC 115 – November 18, Workgroup Action Items Workgroup 96 handed off four items to MTAC WG 115: ● Bundle preparation ● Containerization ● Presort Parameters ● Destination entry
MTAC 115 – November 18, Workgroup Activities Developed a prototype system “Automated Flats Processor” (AFP) to improve: ● Productivity of bundle processing ● Equipment space required to process daily volume ● Capability to accept multi-zone pallets ● Flats auto processing – induction to piece sorting
MTAC 115 – November 18, Workgroup Activities AFP key functions are: ● Auto Depalletize Bundles – automatically unloads bundles from pallets ● Distribute Bundles based on sort plans with OEL readability – convey & prep bundles for processing ● Process Bundles – cut and remove bundle strapping and load bundles into ACTs ● Make Dollies – produce sort plan based dollies ● Dispatch Dollies – full ACTs, produced for specific sort plans, released for induct into flats sorting equipment
MTAC 115 – November 18, Workgroup Activities Bundle / Container testing: ● Built on auto-ready pallet concept ● Evaluated – uniform bundle heights, compensation of bundles, containerization, and bundle securing methods ● Determined counter-stacked bundles of uniform height travel well through transportation / distribution system Bundle securing methods tested: ● Two cross-straps around length and girth ● Shrinkwrap “bellyband” with a single-strap as alternative to strap only
MTAC 115 – November 18, Workgroup Activities Discovered auto-ready pallet prep will allow bundles to flow directly to the bundle prep operation and bypass APPS processing Evaluated potential pallet levels: ● Pure FSS (single scheme) ● Pure FSS (multiple schemes) ● Combined FSS and non-FSS
MTAC 115 – November 18, Workgroup Activities Assessed impact of volume reduction ● Volume reduction has required more ZIP Codes and FSS sites than original plan ● Some original sites receiving fewer machines ● Volume reduction makes preparation of FSS single- scheme pallets more difficult Considered single preparation solution ● Lowest end-to-end cost achieved with one bundle preparation method Prep compatible with FSS and AFSM process
MTAC 115 – November 18, Status of Action Items Bundle ● Optimal bundle height of 3”, 4”, 6” ● Secured using two cross-straps Container ● Non-compensated bundles on compensated pallet ● Content determined by FSS scheme & destination Presort ● Driven by FSS Label List and sort plan contents Entry ● Destination entry, at minimum, should not change and may contract with optimized network
MTAC 115 – November 18,
® FSS Mail Preparation Next Steps Krista Finazzo Manager, Operational Requirements Rosa Fulton Executive Director, FSS
MTAC 115 – November 18, FSS Flat Mail Prep – Next Steps Propose new MTAC workgroup ● Workgroup: “Implementing FSS Presort Parameters” ● Align under the “Optimization of Mail Preparation & Entry” focus area Charter of new workgroup: ● Develop and implement presort parameters to support defined (optional) FSS prep ● Identify timing of software updates related to FSS deployment ● Communicate timing & FSS Label List
MTAC 115 – November 18, In closing