GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS 4.1.9.

Slides:



Advertisements
Similar presentations
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectOct. 23, 2003 Page 1 EM-1 I & T Lesson’s Learned Need to define all documents / training required for I&T personnel –LAT-MD ,
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
I&T&C Organization Chart
GLAST Large Area Telescope:
THEMIS Mission Assurance
GLAST Large Area Telescope:
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
Integration and Test Organization Chart
LAT Environmental Test Planning and Design Review
Introduction and Overview
Integration & Test Instrument Operations Coordination
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS I&T Engineer B. Grist WBS Reliability & QA D. Marsh WBS Environmental Test Manager M. Lovellette Online Manager R. Claus Science Verification, Analysis, and Calibration E. do Couto e Silva Particle Test Manager G. Godfrey Integration, Facilities, Configuration, and Test L. Wai Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD I&T Preparation EM1 Model I&T Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T Calibration Unit I&T Flight LAT I&T Mission I&T Support

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Outline of Talk 1.Responsibilities 2.Requirements 3.Operational flow 4.Contamination Control 5.Mechanical GSE 6.Traveler implementation 7.“To do” list

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Responsibilities 1.Manufacturing support functions a)Technician coordination, training, and support b)Flight hardware receiving inspection c)Hardware non-conformance reporting d)Review of LAT handling and transportation procedures 2.Mechanical test flow implementation a)Traveler / work instruction control system for flight hardware b)Review of I&T mechanical GSE c)Coordination of mechanical integration d)Review of test plans and procedures e)Support and oversight of LAT tests 3.Contamination control implementation

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Requirements 1.LAT Performance Assurance Implementation Plan (LAT-MD-00039) 2.LAT Quality Manual (LAT-MD-00091) 3.LAT Contamination Control Plan (LAT-MD-00404) 4.LAT Installation Performance Verification Plan (LAT- MD-00408)

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Operational flow I&T Management Elliott Bloom Brian Grist Contamination Control Transport Tests Integration CAL TRK ACD Technician Control Grid Manufacturing Management Larry Wai Ossie Millican Receive Validate Store QA Management Darren Marsh NASA Flight Hardware Training System safety Non Conformance Requirements Audits and surveillance

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Contamination Control 1.Implement LAT CCP 2.Supervise technician training and conformance 3.Controlled flight hardware storage 4.Mechanical GSE control 5.Clean room procedures enforcement 6.Clean room environmental monitoring: particulate count, temperature, humidity 7.Wireless alarm system for disaster prevention: automated real time analysis of environmental data, manager (me) lives within 10 min of Integration Area 8.Tape lift, witness plate processing

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Component Contamination Specifications Matrix LAT Component: Control Category: ACD (plastic scintillator tiles) TRK (silicon strips) CAL (Cesium Iodide crystals) Molecular sources HeliumSaltWater Particulate <=class 100,000 Misc. fallout <=class 100,000 Misc. fallout Other environmental >30% humidity (prevent ESD) 30-50% humidity (prevent ESD, prevent water contamination)

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Mechanical GSE 1.Frame: connecting to Grid bosses and Frame Support Fixture 2.Worm Gear Reducers: connect to Frame and Frame Support Fixture. 360 degree rotation. 3.Frame Support Fixture: connects to floor and Frame via Worm Gear Reducers 4.TKR Unit Lift Fixture: maintains stability for Unit as it is connected to Grid. 5.CAL Unit Lift Fixture: maintains stability for Unit as it is connected to Grid. 6.CAL Container: connects to Frame and contains nitrogen flow to CAL. 7.Overhead Crane: 5 ton overhead crane for lowering subsystems and lifting integrated LAT 8.ACD Lift Fixture: connects to ACD and crane rigging. 9.Metrology Fixtures: strategic location of laser tracker balls for measurement of fiducial points 10.Fixtures for integrated LAT testing: SLAC test beam, shipping, thermal vacuum, vibration table

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai GLAST Integration Area – Building 33 SLAC

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai LAT Integration High Bay Clean Room (1)

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Hook Height Maximum Hook Height Minimum ACD LAT Integration High Bay Clean Room (2)

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai LAT Integration Fixture Conceptual Drawing (1)

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai LAT Integration Fixture Conceptual Drawing (2)

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Traveler implementation 1.Management uses SureTrack 3.0a from Primavera Systems 2.Wireless palm PC interface to flight hardware traveler / work instruction system 3.Flight hardware validation check-list 4.Controlled generation of Non Conformance Reports 5.Associated records from test flow implementation 6.Associated calibration records for metrology tools 7.Associated flight hardware environmental history records from contamination monitors (temperature, humidity, particulate count, tape lift/witness plate results)

GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai “To do” list 1.Contamination control implementation plan 2.Technician coordination and training plan 3.Hardware test flow implementation plan 4.Validation of test flow implementation plan 5.Setup/test of (wireless) electronic traveler system 6.Work instruction development