Muon Stations M2-M5 Hardware status Outline: Gas System status UF/PNPI HV-system status Remaining M2-M5 installation tasks – Air cooling system status.

Slides:



Advertisements
Similar presentations
Dmitrii Mausuzenko, Oleg Maev (PNPI)
Advertisements

M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Problems with Muon System N. Bondar O.Maev
TB Peter Glässel, Heidelberg1 TPC Progress.
Muon System Safety Issues Burkhard Schmidt.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
The RPC Closed loop Gas System Slides from Bianco and Guida.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Update on the M1 schedule Muon Meeting March 23, 2009 Burkhard Schmidt.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
CALO News Pascal Perret LPC Clermont 22 January 2012.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
on behalf of the RF group
Presentation transcript:

Muon Stations M2-M5 Hardware status Outline: Gas System status UF/PNPI HV-system status Remaining M2-M5 installation tasks – Air cooling system status – Rack cooling – DSS related issues – Moving system Closing test and alignment status Burkhard Schmidt

Gas System Commissioning Status: The common gas analysis rack has been commissioned in the past weeks and the values for the water contamination, measured with different devices make finally sense. We have about ppm of H 2 O and 30ppm of O 2 in the return line. (Values went slightly down with new calibration of H 2 O meter.) A software upgrade took place last week and we have now the gas analysis available online The commissioning of the M1 gas racks is ongoing and will be completed by July 11. The GEM part maybe only a bit later, as some more work is required still. All chambers are flushed since April 10 with the (CO 2 /Ar 60/40) for cost reasons: –CF 4 for 1day in vented mode operation costs 1000 CHF. –CF 4 for 1day in recirculation mode costs 100 CHF.  We intend to continue running without CF4 until colliding beams are within reach  The system is running very stable.

Gas System Commissioning To be done still: Recalibrate some flow cells in the distribution racks. (Gas Group) Move the test chamber to the UXA zone for continuing checks on the gas quality. (CBPF expressed interest) Display some gas system information in the Muon ECS and define thresholds for actions. (Florence group?) 14/4 15/4 16/417/4

UF/PNPI HV-System Hardware (PNPI): Spare modules of RDBs (5), Masterboards (2) and Hostcards (2) are available at CERN and calibrated. Software: Four components exist: 1.PVSS  Michela (Firenze) 2.DIM server  Magnus (CERN/DO) 3.Driver for Host-card  Evgueni (PNPI) 4.Firmware for FPGA  provided by UF  People in charge for all 4 parts are better identified.  3. and 4. will obviously change when we go to the USB interface (discussions with MSU only started) 14/4 15/4 16/417/4

UF/PNPI HV-System Status: We got new Driver and Firmware from CMS (UF). The Driver has been upgraded by Evgueni to run under SLC4 and tested. The new Firmware has not been installed yet. Planned for next week. The problems observed with modules turning off disappeared since we use the new Driver. The system needs more debugging at several levels, which is ongoing. Presence of people at CERN is important for the debugging. 14/4 15/4 16/417/4

Air Cooling System Status Cooling hoses are installed on the A- and C-side. Additional cables to power the blowers with 400V/32A are in place. Space for the blowers has been made in the base of the M2-M5 support structure, retaining the same mass as we had before. Blowers have been installed in May. Heat exchangers, filters and distributors for the cooling hoses need to be installed still. It will take at least 2 weeks to complete the system  We are late due to lack of manpower and the rather low priority given to this system.  The temperature in the detector has to be monitored carefully by us in this phase where the cooling system doesn’t work yet.

Rack Cooling Turbines are operational since many months and the rack cooling is not really a problem. However, optimal cooling is desirable to improve longevity of the electronics, in particular the ODE boards. Therefore:  Heat exchangers should be connected  Racks should be closed properly (also important in case of fire!) Investigations on rack temperature and on optimal position of the heat exchangers are in progress (Nikolai) Rack cooling could be completed within the next 2-3 weeks if manpower is made available (move Gennady to this task ?)  We are late due to lack of manpower and the rather low priority given to this system.

DSS Issues Water Leak Detection (WLD): WLD will be done with special water leak detection cables. Material ordered, should be delivered and installed soon (Nikolai). Recipients will most likely not be installed (lack of space). Gas System / HV-interlock: Problems with the Gas System provoke a DSS signal now. The HV-interlock needs still to be cabled up. A 3-6 hour delay before cutting the HV for the chambers is foreseen.

Control of Moving System (Marco, Laurent, Nikolai, Robert) System for station movement is in place and has been partially used for the closing test. Some more work is needed to complete the installation (mechanical and electrical aspects) and to test the system.  Planned in the coming 2 weeks. Control system for the Filter moving is not yet complete (cupboard with electrical circuitry needs to be assembled, installed and tested) Some improvements are desirable after the experience gained with the closing of the system in the past week.  It will most likely take until the second half of July to complete everything.

Operating Procedure for the moving of the Muon Filters and Muon stations An operating procedure has been prepared with high priority after the incident of May 19, when 4 aluminum plates fall from MF2 (A-side) EDMS document  Please, read it carefully

Control of Moving System First measurement results for Muon Filters: Reference: control of reproducibility of result Closed: after first complete closing on Friday Closed: after moving the filters 4mm direction cryogenics mm

Closing Test

Much preparation work was needed –Chamber supports (baloconies) –Rerouting of Cables, change of screws Work of Oleg and Sasha was very Much appreciated

Closing Test Additional guides

Closing Test Much preparation work was needed A small gap (5-10mm) remains in the centre, despite the modification of a vertical plate Filter (beam plugs) with +/- 5mm In their nominal position)

Station Alignment A very difficult job (mainly done by Thomas), which is unfortunately not yet completed, despite many measurements taken by Sandra and Jean-Christophe and subsequent corrections (help of Wander appreciated). C-side station alignment: Could be verified in the final station position and is rather good. A-side station alignment: Could only been done so far with the A-side filters opened. Unfortunately the inclination of the M5A (also M4A?) wall in the x-y-plane changed by about 4mm when moving to the closed position, so the alignment has been partially lost. M2A (also M3A ?) looks rather ok.

Station Alignment Measurement with position encoders (end-switches), reference done in open position, the other measurements in the closed position Measurement shown is for end-switch on MF3 A-side, close to M5A) mm

Summary Station Alignment Station z-alignment (A- and C-side): We are within 4-5mm in the nominal position. Final z-values are driven by gaps between the filters, clearances etc. ok C-side: y- alignment:ok x-alignment: Moving M3-M5 1.5mm to the beam axis brings all stations within 1mm relative to each other in x and ensures symmetry around x=0  should still be doable in the coming weeks A-side: y-alignment: looks ok for M2A (M3A ?). Tilt of M5A spoils y-alignment  Needs checks and new measurements, which can not be done with ECAL/HCAL closed. To be seen. x-alignment: Moving stations M3 and M4 3mm out and M5 even 6mm brings all stations within 1mm relative to each other and ensures symmetry around x=0  should be doable in the coming weeks, but difficult to re-measure.

Summary Station Alignment Final station Offset: With the values given on the previous slide we would have a station offset of mm.  Given the poor quality of the Muon filter closing around x=0, this is in my opinion acceptable. New measurements of the system when closed would be very desirable. In case the calorimeters cannot be opened with the beam-pipe under vacuum, a new strategy needs to be developed with the surveyors for doing such measurements. The clearances around the beam plug need to be re-measured for the A- side with the system closed. Should be done as soon as possible. With the values given on the previous slide we expect clearances around the beam-plugs of at least 5mm, which are desirable.

Conclusion A non negligible number of small tasks remain to be accomplished in the coming weeks, which require our concerted efforts. In addition we have to reserve some time to clean the zone and remove material we don’t want to be subjected to INB rules later on.