NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Ray Lundquist, NASA GSFC
1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
ISIM Integration & Test Mike Drury JWST-PRES
The NIRSpec Critical Design Review Oct 8th Dec 11th 2008 T. Beck (& M. Stiavelli)
James Webb Space Telescope Update Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
IMPRS June Organigram of ESA, in the late 1980s
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Fine Guidance Sensor 2010 HST Calibration Work Shop Ed Nelan Barbara McArthur STScI.
James Webb Space Telescope Integrated Science Instrument Module Status Jamie Dunn JWST/ISIM Manager JWST Partner’s Workshop May 19, 2009 JWST-PRES
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
Summary of the JWST Integrated Science Instrument Module (ISIM) and Structural/Thermal Subsystem Systems Requirements Reviews (SRRs) Jerry Kriss 04/15/2004.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Hubble Science Briefing
INS NIRSpec, 12 May 2005 Introduction to NIRSpec Michael Regan.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Constellation Space Transportation Planning Office July 30, 2009.
01/15/2004 TIPS/JIM Summary of the JWST Mission and Observatory Systems Requirements Reviews, and Micro-Shutter Array (MSA) Confirmation Review Jerry Kriss.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Mid-InfraRed Instrument (MIRI) Delta-Systems Requirements Review: March 9 Margaret Meixner MIRI support scientist.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
NIRSpec - the JWST Multi-Object Spectrograph P. Jakobsen (ESA), S. Arribas (CSIS), T. Beck (STScI), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford),
New gTLD Auction Proceeds CCWG Status Update
Rosetta Science Ground Segment Overview
Software and Systems Integration
The European Contribution to eXTP
James Webb Space Telescope
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
Science Policies and Timeline
SLAC DOE Program Review
Instrument PDR Summary of Objectives
GLAST Large Area Telescope:
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
SPICA / FPI Mechanical /Optical Issues
Instrument Overview Larry Springer HMI Program Manager
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM

Light Path

PDR Objectives Assess compliance with requirements Assess NIRSpec system specifications Assess external interface definitions Integrated Science Instrument Module Microshutter Array Detector Subsystem Assess predicted NIRSpec performance Assess cost, schedule, and risk estimates

PDR Format Board Led by ESA with NASA participation Co-chaired by NASA Independent Review Office Technical Panels System Structure, thermal, and mechanisms Optics Electrical and software Product Assurance Programmatic Panel

PDR Timeline Dec 1 Documents delivered Dec 2 Kick-off meeting held … Panel meetings … Jan 6 Panel chairs met “Review Item Dispositions” submitted Jan 31-Feb 2 Co-location ESA/Industry ESA/Instrument Science Team Feb 9 Panel chairs reported to board Feb 15 Board met

PDR Verdict NIRSpec PASSED its PDR!

PDR Major Findings Microshutter technology is a risk Electrostatic discharge is a risk Create stray light control plan Include detector in EMC control plan Cool light sources used in ground tests Prevent contamination by water Manage target acquisition interfaces Test cold after observatory integration

No Schedule Change JWST launch date slipped to June 2013 NIRSpec delivery date is unchanged Necessary to control ESA costs Requires timely definition of interfaces Requires timely delivery of subsystems NASA funding ISIM to support schedule

Microshutter Update Technology demonstration tests Lifetime test: <5% shutters fail after 10 5 cycles Acoustic test: <1% shutters fail Vibration test: <1% shutters fail Radiation test: <1% shutters fail Open/closed contrast: >2000 EMC/EMI test Demonstrate ability to plug shutters in lab Stiction issue 0.5% shutter stuck open after 10 5 cycles Heating to 300 K causes shutter release

Rogue Path Update Unbaffled telescope Sky skirts FSM and illuminates POM NIRSpec wants 9 mm increase in FSM mask NIRCam coronagraph blocked by >6 mm Outer edge of FSM mask Inner edge of NIRSpec mask

Orders of Magnitude in Scale 10  4  365  K Shutters Q1 Q2 Q3 Q4

Plate Scale Changes We must position targets in shutters Allocate 5 mas for plate scale changes Corresponds to 0.01% change in focal length Rephase primary as often as once a week