CSULB EE400D DOCUMENTATION INSTRUCTIONAL SERIES PRELIMINARY DESIGN REVIEW.

Slides:



Advertisements
Similar presentations
Instructions and Guidelines for Final Report and Final Presentation 55:089 EE Senior Design Fall, 2008.
Advertisements

Criteria for Formatting of the Project Report
National Aeronautics and Space Administration Systems Engineering (SE) Tools National Aeronautics and Space Administration Example.
Final Project Team Selection Team Selection Written project proposal Written project proposal Presentation of project proposal Presentation of project.
Schedule. Team Notebook Grading Contents: meeting logs (date, time, duration, who is present, topics discussed, action items) graded assignments expenses.
Term Project Teams of ~3 students Pick a system (discuss choice with me)  Want simple functionality, security issues, whole system (e. g., client and.
Fundamentals of Engineering for Honors - Team Project P. 1 Spring Quarter 2003 Engineering H193 Project Notebook & Brainstorming Sketches Week 1 Day 2.
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Term Project Pick a system (discuss choice with me)  Want simple functionality, security issues, whole system (e. g., client and server side) Submit a.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Team Name Final Presentation Team Members Date Rev
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Project Management Session 7
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Final Report – An Overview Week 4 Day 2.
Session 7 Page 11 ECE361 Engineering Practice Brainstorming, Trades, Evaluation, and Conceptual Capture.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
CSULB EE400D Documentation Instructional Series
Project Proposal ECE 445 Lecture 2 Jan 27, 2015 ECE Main Slide.
Prepared for the Ottawa Region MISA Professional Network Centre - Summer 2006 Writing a Research Proposal for Funding An Overview.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Brainstorming & Project Management
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Unit 2: Engineering Design Process
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Instant Design Challenge Using the Design Process and Engineering Notebook.
1 Systems Engineering Process Review Mark E. Sampson EMIS 8340 Systems Engineering Tool—applying tools to engineering systems.
Lecture 4 Title: The Scope Management Plan
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
Scientific Communication
First-Year Engineering Program Advanced Energy Vehicle Topics: AEV Design Concept Screening and Scoring.
Physics Project Management Chin-Sung Lin Eleanor Roosevelt High School.
Blog Post Grading. GENERAL OVERVIEW Do the posts capture the progress and development of your project?
Request for Proposal (RFP)
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
Project Deliverables CEN Engineering of Software 2.
Project Proposal. What is Project Proposal?  A project proposal is written, to make an offer and to try to convince a supervisor or a future customer.
FINAL REPORT LAYOUT Criteria for Formatting of the Project Report.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
Long Reports. Recommendation Report – Intro, Problem, Solution, Conclusion Topic and reader Principles of effective page design – Type, margins, textual.
Preliminary Design Review (PDR) Advanced Energy Vehicle.
Project Deliverables CIS 4328 – Senior Project 2 And CEN Engineering of Software 2.
Technical Report Outline Title Page Frontispiece Abstract Table of Contents List of Figures/ List of Tables.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
How to Write a Project Proposal Specialization Introductory Module Thursday, May 9, 2013 Barbados.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES BLOG POSTS.
CSULB EE400D DOCUMENTATION INSTRUCTIONAL SERIES PRELIMINARY DESIGN REVIEW.
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Long Reports.
Product Validation Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Planetary Lander PDR Team Name
CSULB EE400D Documentation Introduction to Engineering Design Series
IEEE Std 1074: Standard for Software Lifecycle
CSULB Department of Electrical Engineering Thursday, October 19, 2017
CSULB Department of Electrical Engineering Thursday, October 19, 2017
Introduction to New Product Development (Portfolio)
The George W. Woodruff School of Mechanical Engineering
SMA Powered Micro Robot
Project Title, date “Team Name: Team members, …”
Project proposal presentation Guidelines
Brainstorming & Project Management
Introduction to Engineering Design II (IE 202)
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Introduction to Engineering Design II (IE 202)
CIS 4328 – Senior Project 2 And CEN Engineering of Software 2
Presentation transcript:

CSULB EE400D DOCUMENTATION INSTRUCTIONAL SERIES PRELIMINARY DESIGN REVIEW

The Preliminary Design proceeds from a clear definition of the Mission Objective(s) and Profile Program/Project Level 1 Requirements/Verification System/Subsystem Level 2 Requirements/Verification This material was codified in the Preliminary Design / Project Planning Blog Post. The Preliminary Design Review presents how your design has proceeded to date with the goal of meeting these objectives and requirements.

PRELIMINARY DESIGN REVIEW GUIDELINES Power Point Presentation 40 minute maximum duration Each person in the group should present their own work. Be familiar with the material, do not reed it from the overhead or from a sheet of paper Speak clearly, with authority, and eloquently Practice the presentation to ensure all topics are covered in the time allotted. Have simple and uncluttered visual materials. Do not put too much information on one visual. Plagiarism – Provide source for all visuals, text, block diagrams, etc.

PDR OUTLINE Title Page with WBSProject Manager Mission Objectives/ProfileProject Manager Requirements and Verification Program/ProjectProject Manager System/Subsystem System, Subsystem Engineers Design InnovationProject Manager Systems/Subsystem DesignSystem Engineer Electronic System Design System Block Diagram(s) Interface Definitions Mechanical System Design System Resource Reports Mass Budget Power Budget Design and Unique Task Descriptions Subsystem Engineers The Design Process: sketches, back of the envelope, trade-off studies, models… Summary Schedule and CostProject Manager Appendix: Sources

TITLE PAGE Team Member Names Division Assignments

SIMPLE ROBOT WORK BREAKDOWN STRUCTURE (WBS)

CLEARLY STATE MISSION OBJECTIVES AND MISSION PROFILE

LEVEL 1& 2 REQUIREMENTS REQUIREMENT EVALUATION RUBRIC 1. Is the requirement, Quantitative, Verifiable, and Realizable 2. Is the requirement located at the correct level (1 – Program/Project or 2 – System/Subsystem) 3. Is the requirement response to a higher level requirement or customer’s objective? Is the linkage clearly defined? Is requirement consistent with other requirements? 4. Does requirement provide links to source material? 5. Are equations used to calculate a requirement provided and are answers correct? 6. Is language in the form of a requirement? 7. Is a single requirement defined (i.e., breakup statements that contain multiple requirements)

LEVEL 1 REQUIREMENTS WITH VERIFICATION

LEVEL 2 REQUIREMENTS WITH VERIFICATION

SYSTEM AND SUBSYSTEM DESIGN BLOCK DIAGRAM

INTERFACE DEFINITION DESIGN EXAMPLES Your system interface includes your interface matrix and schematic(s).

RESOURCE REPORTS Resources that are important to your project need to be tracked over the life of the project. UFO Ab-ducted, BiPed, Spider, – Power and Mass Rover, ATechTop – Power Cost must be managed by all projects Over the life of the project; as simulations and experiments are run, trade-off studies completed, models and prototypes built and tested, you will be able to finalize your design. Until then, there will always be uncertainty. This level of uncertainty is managed by allocating margins to project resources. This may be done at the system, subsystem, and/or component level.

DESIGN UNIQUE TASK DESCRIPTIONS THE DESIGN PROCESS Sketch of the Design Ideas Back of the Envelope Calculations Trade Off Studies Models Mathematical Computer Simulation Physical Models (Rapid Prototyping) Full-scale Prototypes Scale Models

TASK DESCRIPTIONS EXAMPLES

Rapid Prototyping Example

COST AND SCHEDULE Bill of Materials Schedule with tasks By person

COST AND SCHEDULE EXAMPLES

APPENDIX Sources for outside information.

APPENDIX EXAMPLES

SUMMARY Focus On Original work – what you have learned Demonstration of the Engineering Method – From Objectives to Design Demonstrations with real hardware Do Not Show Product Pages Copied Promotional Text No linkage to Requirements

RESOURCES Introduction to Engineering Design and Problem Solving Design Synthesis Preliminary Designs PDR Outline Document F'14.pdf F'14.pdf PDR Grading Criteria