WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
“The Other Issues” II Moving Forward in Uncertain Times: Clearly, with reduced/loss of funding in the US and the UK, a timeline of 2010 for an EDR is unrealistic.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
Asian View Point as ACFA Chair and Global View Point as New ILCSC Chair Shin-ichi Kurokawa KEK 2 nd ILC Workshop August 23, 2005 Snowmass, Colorado Shin-ichi.
Concluding Remarks Dongchul Son Center for High Energy Physics Kyungpook National University.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Concluding Remarks TILC08 Sendai 6-Mar-08 Hitoshi Yamamoto Tohoku University.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Albrecht Wagner, Report from ICFA, LP 2007 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA and the ILC 4.Other activities of ICFA Albrecht.
7 th February 2007ILC ACFA workshop - Beijing 1 ILC Detector R&D Tracking Review – Progress Report Chris Damerell RAL On behalf of the ILC Detector R&D.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
Summary R.-D. Heuer, Univ. Hamburg/DESY/CERN CERN, Nov 20, 2008 LCWS 2008 University of Illinois at Chicago Outlook Physics Accelerator and Detector General.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
The collaboration has been created in 2002 for 5 years > Developpment of the software for PFA > Design, construction of prototype to test with beam the.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
F. Richard LAL/Orsay What has happened end of 2007 for ILC and the consequences? F. Richard LAL/Orsay First ILD workshop Berlin, Germany, Jan 14-16, 2008.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
Atsuto Suzuki (KEK), Chair ICFA Report from ICFA ICFA mission and membershipICFA PanelICFA Activity.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
WORKSHOP CHARGE ACFA Physics and Detector Workshop Tsukuba, Apr 17, 2009 Hitoshi Yamamoto Tohoku University.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Some Issues on Detector (and MDI) R&D EURO-GDE Meeting DESY May
ICFA J. Mnich (DESY) November 5, J. Mnich | ICFA LCWS Panel Discussion 5 November 2015 | page 2 ICFA Web Page and Mandate ICFA: International Committee.
New Organization and activities for the detector Sakue Yamada ECFA LC Warsaw June 9, 2008 Introduction IDAG LOI groups Common task groups ILC-CLIC.
J.P.DelahayeTILC08: 06/ 03/ 081 CLIC-ILC Collaboration? Following visit of CERN (Nov 07)
Relations with concept groups
For ILD joint steering board
Strategy Ties Behnke
Introduction to the Workshop
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Update of the Detector Program for ILC Sakue Yamada March
Workshop charge F. Richard for the WWS-OC
Presentation transcript:

WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008, Sendai, Japan

WWSWWS The WWS roadmap In 2007 there were various steps on the WWS Roadmap (recalled in detail in Sugimoto-san presentation): Cautious attitude from the community during the ACFA meeting in Beijing Cautious attitude from the community during the ACFA meeting in Beijing Presentation of an ambitious project during LCWS07 in DESY Presentation of an ambitious project during LCWS07 in DESY Too ambitious ? In particular on engineering aspects requiring extra manpower not to speak of extra funding Too ambitious ? In particular on engineering aspects requiring extra manpower not to speak of extra funding Too early ? Too early ?

WWSWWS ATLAS (T. Akesson)

WWSWWS The crisis In spite of ‘Black December’ the roadmap is becoming truly operational even though: We have to stretch in time the process, as the GDE, to keep everyone on board We have to stretch in time the process, as the GDE, to keep everyone on board We need a more prudent vocabulary (DOE) but hope to maintain our main objectives We need a more prudent vocabulary (DOE) but hope to maintain our main objectives This means going well beyond ‘generic’ R&D to assess, realistically, the overall physics performances and achieve a realistic MDI program. This means going well beyond ‘generic’ R&D to assess, realistically, the overall physics performances and achieve a realistic MDI program. This is well understood by ILCSC where the detector part has taken growing importance. This is well understood by ILCSC where the detector part has taken growing importance. DOE still needs to be convinced as appeared at the last FALC DOE still needs to be convinced as appeared at the last FALC

WWSWWS A new spirit Solidarity rather than competition Solidarity rather than competition Some countries are unaffected by this crisis (no domino effect) or even improving (e.g. Japan, Spain, India, France…) and wish to help Some countries are unaffected by this crisis (no domino effect) or even improving (e.g. Japan, Spain, India, France…) and wish to help The strategy of the WWS should be to help the various concepts in fulfilling the LoIs The strategy of the WWS should be to help the various concepts in fulfilling the LoIs We are not fighting to get 2 experiments approved but to get a project flying We are not fighting to get 2 experiments approved but to get a project flying In this spirit we need to favour better regional balance between LoIs to insure more stability In this spirit we need to favour better regional balance between LoIs to insure more stability Also, in the same spirit, we should not appear as a ‘closed club’ but encourage newcomers and make best use of available resources Also, in the same spirit, we should not appear as a ‘closed club’ but encourage newcomers and make best use of available resources

WWSWWSILC-CLIC The recent CLIC-ILC meeting at CERN is an example of optimizing resources The recent CLIC-ILC meeting at CERN is an example of optimizing resources We all agree on a common goal: the need to build a lepton collider after LHC We all agree on a common goal: the need to build a lepton collider after LHC -> Constructive competitiveness ? -> Constructive competitiveness ? There are mutual benefits to be expected by improving the connections between the two projects: There are mutual benefits to be expected by improving the connections between the two projects: CERN expertise on large detectors CERN expertise on large detectors MDI experts sharing common work (already happening) MDI experts sharing common work (already happening) CLIC benefiting from our well advanced tools to design a detector concept CLIC benefiting from our well advanced tools to design a detector concept ILC concepts tried at ECM >>500 GeV ILC concepts tried at ECM >>500 GeV -> ILC concepts to designate contacts to help CLIC

WWSWWS Next meetings Next ECFA meeting in Warsaw June 9-12 Registration is opened Next ECFA meeting in Warsaw June 9-12 Registration is opened Follows the GDE meeting in Dubna Follows the GDE meeting in Dubna IDAG will start there IDAG will start there CLIC-ILC collaboration on detectors to be discussed CLIC-ILC collaboration on detectors to be discussed LCWS08 November , hosted by a Chicago- land Consortium LCWS08 November , hosted by a Chicago- land Consortium

WWSWWSConclusion The detector roadmap is progressing in spite of the bumps The detector roadmap is progressing in spite of the bumps To get more support, let’s follow the advice given the first day by Suzuki- san: To get more support, let’s follow the advice given the first day by Suzuki- san: