1 RMS Training Sponsored by the RMS Center May 2010.

Slides:



Advertisements
Similar presentations
Presumed Asbestos Training Programme. Introduction Getting Started The Interface Top Tool Bar Creating a New Site Type I Survey Type II Survey Type III.
Advertisements

CATS System Welcome Screen. Program Access and Authority Three levels of access: Super User: Can update and delete assigned program records (Contract.
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
Home This training presentation is designed to introduce the Residency Management Suite to new users. This presentation covers the following topics: Login.
P2 – RMS Interface May P2 – RMS Interface P2Local RMS CRMS On demand Or scheduled Nightly.
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Overview May 2010.
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Reports for Dummies May 2010.
South Dakota Library Network ALEPH Acquisitions Overview South Dakota Library Network 1200 University, Unit 9672 Spearfish, SD © South.
Spillman Sentryx 6.0.
Billing for Departmental Users
Customer Service Module Course Contents Table of Contents Enter A Request Search A Request Create Invoice (Funeral home request) Search Invoice Manage.
Welcome to the Manage Quality Assurance module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing.
Using Microsoft Outlook: Basics. Objectives Guided Tour of Outlook –Identification –Views Basics –Contacts –Folders –Web Access Q&A.
US Army Corps of Engineers November 2007 Access Control.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
SATERN for Supervisors May Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.  Log.
ONLINE CLAIMS TRACKING
Copyright CHS Payroll, Inc 2004 (Click anywhere to advance screen.) MyPayrollWeb.com Tour The ultimate online payroll experience from CHS Payroll.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Cash and Cash Management.
Web Self Service Take Home Message Web Self Service gives CRM information access to assigned non-CRM users.
MagicInfo Pro Server Software All control, content, and scheduling is performed within the MagicInfo Pro Server software previously installed. Before.
RMS Overview July 2006.
SMART Agency Tipsheet Staff List This document focuses on setting up and maintaining program staff. Total Pages: 14 Staff Profile Staff Address Staff Assignment.
MIP Workbench: Revisions FEMA Learning Management System PROJECT ADMINISTRATION ROLE.
1 RMS Training Sponsored by the GRD - SBH January 2007.
1 RMS Training Sponsored by the RMS Center July 2006.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
SATERN for Supervisors Updated: January Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
1 Command Field: Use this field to go to transactions directly by entering the transaction code. The transaction codes can be found either in the SAP Easy.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
0 eCPIC User Training: Resource Library These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Users December 2009.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Siebel 8.0 Module 2: Overview of EIM Processing Integrating Siebel Applications.
1 OGM Presentation for Your Hospital Today. 2 The Ongoing Maintenance Program The OGM Program Components.
SATERN for Supervisors Updated: December Session Objectives At the end of the session, participants will be able to:  Describe SATERN  Log in.
OLDC Version 3.0 October 18, How to Connect (Telephone Conference) The Deployment Teleconference consists of a telephone conference and a Bridgit.
IT 499 Bachelor Capstone Week 3. Adgenda Administrative Review UNIT two UNIT threeProject UNIT four Preview Project Status Summary.
1 Presentation Coventry City Council IT Application to record and monitor external funding within Education & Libraries Author Mr. Jason Kay Technical.
Hatrak Scheduler UsOn Line Demo HATRAK SCHEDLER.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
PestPac Software. Pay On Commission Commission can be paid on Production, Receipt, or Up-Front. Production: Commission will be paid when work is completed/an.
07/16/2007 C&G Officer User Guide for eCAFSlide 1 C&G Officer User Guide for eCAF.
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Reports for Dummies July 2006.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Chapter 1 Page ref. Chapter 1 Company File Setup and Maintenance 1.
SAP R/3 User Administration1. 2 User administration in a productive environment is an ongoing process of creating, deleting, changing, and monitoring.
Integrated ISO ILL for staff users Borrowing requests – part two Yoel Kortick 2007.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Training Guide for Residents
Melissa Wagner & Jaime Patel
TOPSpro Special Topics
Contractor Mode Administration Tab Overview
Regional Architecture Development for Intelligent Transportation
Contractor Mode Import/Export: Overview
Sponsored by the RMS Center
Entering an Option Modification
Contractor Mode Finances: Overview
QCS An Overview Savannah District Project Engineer 16 Nov 06
Setting Up a New Contract
Utility Billing Balancing the Accounts Receivable
Education Admin Training.
Presentation transcript:

1 RMS Training Sponsored by the RMS Center May 2010

2 RMS Training Objectives for this session: To provide a brief overview to aid in using the current version of the RMS software.

3 RMS Training Select Contract (Home) Local Office District Office District Library System Library Summary Reports RMS Main Menu Selections

4 As you are required to log into RMS using your assigned name and password, you will be able to distinguish between the contracts you have access to and those that you have been denied access to by checking the Display Contracts with Access Denied block at the lower left of the window. The first selection, Select Contract presents the contracts control center and will include everything to do with the particular contract you have selected. You have the option of displaying all the contracts in an office or selected (active, future, completed contracts) contracts for the individual office, as well as any Sub-Offices that may be applicable.

5 The second module, Local Office, tracks data pertaining to the offices and staff that will interface with RMS for all contracts. The staffing will include all local users and other support staff, such as the Contracting Officer, submittal reviewers from other offices, etc. This is also where you would create “Office Documents”, such as the Office Safety Plan, or QA Plan. You can create any desired Milestones for the office and set interface schedule for CEFMS and P2. Some of this information was formally found in the “Local Library”, which has been deleted.

6 The third module, District Office, contains information that will be used in all offices and contracts within the District. It is critical that those that have responsibilities to keep this data current approach it diligently and keep all data in accordance with District policies, etc.

7 The fourth module, District Library, contains all the libraries maintained by the District Office. This provides uniformity of field offices in areas considered appropriate to be directed or shared from District Staff, policies and procedures. It is important to ensure that the libraries contain all desired information to cover the areas listed. Changes made in the Library affect all contracts within the database that fall under the District Office.

8 The fifth module, System Library, contains all the libraries maintained by the RMS Center. These libraries include HQUSACE policy-driven selections that will seldom change and are considered critical enough that uniformity throughout all USACE Offices is required. The Program Types, Contract Status Codes, and the Primary Delay Codes, can be modified to include only those that are relevant to your District to appear in the various “lookup” tables throughout the RMS program. The RMS Center is tasked with keeping this data current and in accordance with USACE Directives and/or Policies.

9 The sixth selection, Summary Reports, presents the reports available across all Contracts in your database. The Reports are divided into sections to pretty much match the actual Contract Screens. You will need to ‘double-click’ the report to launch it.

10 RMS Training ADMINISTRATIONFINANCESQA/QCSUBMITTALSSCHEDULESCLOSEOUTIMPORT/EXPORT CONTRACT REPORTS RMS Contract Menu Selections

11 Administration - This area presents what we need for the normal administrative functions of a typical contract. It is where we will enter the descriptive data and status for the contract and setup the various areas for the contract to utilize RMS in a more meaningful way for the particular contract or Customer. Letters pertaining to the contract will be here under Correspondence and Request for Information. Tracking data for Prime Contractor, Subcontractors, Insurance, Payrolls and Labor Standard Interviews will be found here also.

12 Finances - Anything to do with MONEY will be found with this selection. It is the place where CEFMS data is exchanged and we setup our contract funding and Award CLINS, etc. Contractor Activities, Changes, Modifications and Progress Payments are selected from this modulel. Contractor Claims are available from this location, as well as the Summary level.

13 QA/QC – Whether you are using RMS or a paper napkin to manage contracts, pre-job planning cannot be overlooked. There are just some tasks that the Resident Office must tackle; Quality Assurance and Quality Control are two of the more important ones. RMS simply makes it orderly and consistent. Tracking and reporting tools are found here, as are the tools for setting up the three-phase inspection checklists and planned Labor Standard Interviews. Contractor control and reporting tasks are also included with this selection. The daily Quality Assurance Report (QAR), the Quality Control Report (QCR) and QC requirements are accessed through this selection.

14 Submittals - Submittal Logs and Transmittal Logs are located here. The ENG Form 4288 and ENG Form 4025 are populated from the data entered. Submittal Reviewers are entered from this area. Submittal sections may include the MasterFormat 1995 and/or the newer MasterFormat 2004 library versions from SpecsInTact. (Note: Since the SpecInTact program is maintained by NASA, it probably took a “Rocket Scientist” to come up with the ‘new’ listing of so many Divisions.)

15 Schedules – Anything to do with DATES and PLACEMENT will be found in this section. Dates included here include the Feature Schedule, Activity Schedule, Milestone Schedule and the Monthly Placement Schedule.

16 Closeout – Closeout activities can consume a significant amount of resources and, if not managed carefully, will be put off until the least opportune time…at the end of the job, when you are really too busy to worry about items that have already taken place. This module can be updated throughout the life of the contract and will produce, almost effortlessly, the DD Forms 1354, 1149, and This section is a major time saver. After the contract is completed you will be making periodic Warranty Inspections. This is the place to record the results and actions of the Warranty Inspections.

17 Import/Export – Importing data from a variety of sources is another key feature of RMS. Whether you need to import from the Contractor version of RMS (QCS), a Contractor scheduling package (SDEF) or the submittal register, it is all done from this selection. RMS will also export to other programs, such as P2 and the Government stand-alone program, QAS, which is similar in principle to the Remote QCS program used by our Contractors. A newer feature for this version is the ability to import another contract, where the contract itself may be very similar or even identical.

18 This module, Contract Reports, is similar to the previous “Summary Reports”, but give you reports just for the currently selected contract. The Reports are divided into sections to match the actual modules within a contract. You will need to ‘double-click’ the report to launch it.

19 RMS Training Questions?