TPO Corners Installing an Outside Corner: Outside Corner Steps: Complete field and curb membrane attachment.Start welding with pre-molded corner against.

Slides:



Advertisements
Similar presentations
How to Make a Patch Pocket
Advertisements

35 FOOT LADDER 3 PERSON.
Proper Wear of the Military Uniform.
JM RhinoPlate Overview. JM RhinoPlate Roofing Concept INDUCTION –Electromagnetic induction is an invisible force used to generate heat in a conductor.
EVA Liner (PP Lower Limb Prosthetic) Polypropylene Technology International Committee of the Red Cross.
Flexible Manufacturing Common Sheet Metal Seams Copyright © Texas Education Agency, All rights reserved.
NERI TORCH TRAINING PART VII PRACTICAL EXAM PREPARATION.
Homemade Sushi Demystified Making Sushi at Home A Quick Guide by Erin Evans.
MyLock 644D Service Seminar.
How to Make a PAPER TIGER. STEP 1: MAKE BODY TUBE 1. Use a spent engine to roll your body tube out of copier paper the short way 2. Test the size by sticking.
Welcome to my show!! Lay 1 nori sheet on a rolling mat & put ¾ cup sushi rice on it. Spread rice over.
Energy Coffee Can Racer Lab
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Firestone Building Products EPDM Training. Membrane Attachment.
SLOPE BINGO!!!! Students—be sure you have your materials! You will need: A Bingo Play Card A Slope Bingo Calculation Sheet Something to write with Your.
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
Copyright © Texas Education Agency, All rights reserved.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Hexagons & Hexagonal Prisms. Hexagons Hexagons are 6 sided shapes. Hexagons can be dimensioned in 2 different ways. 1. Across the faces. 2. Across the.
RS6 Hood Vent Templates and fab Instructions. You will need- Painters tape. 1” and 2”+ Aircraft paint stripper Tape measure mm T square Good pencil Drill.
Firestone Building Products. is: UltraPly™ TPO membrane in the field of the roof. RubberGard EcoWhite™ EPDM, or RubberGard™ EPDM (black), for wall flashing.
 Page 3 – Introduction  Page 4 – Materials Needed  Page 5 – Steps 1-2  Page 6 – Steps 3-4  Page 7 – Steps 5-7  Page 8 – Steps 8-9  Page 9 – Steps.
How to make a paper airplane
Day and Night by M.C. Escher
Sectional sectional plans are at their most basic a vertical cut through a building that gives a flattened view of the interior.
Installation. Indoor Unit Installation Typical Installation.
Products & Accessories Details System Highlights Hands On
LIGHT SHADOW AND REFLECTION
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
XR Stick ™ Firestone Building Products. XR Stick ™ Firestone’s XR Stick™ is a two-component, low- rise polyurethane adhesive designed to attach Firestone.
UNIT 3 THINKING MATHEMATICALLY BY BLITZER Hamilton Paths and Hamilton Circuits.
Chapter 27 Nail Tips & Wraps.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Oxyacetylene Cutting O.A.C. Pattern Cutter Cutting Torch.
TPO Membrane attachment and Base Tie-In Adhered System System Design Adapts Easily To Unusual Roof Profiles or Slopes System Design Is Easy To "Beef.
17/02/03Designed by Barry Forbes Graphic Communication Hexagons & Hexagonal Prisms.
WELDING TIPS Start at one end of pattern. Lay darkest pieces onto pattern. Line up with black lines, then lightly hot-tack into place at corners. Leave.
Using commercial patterns Trimming, pinning, cutting out, transferring pattern markings. © PDST Home Economics.
1. First write your name on the line Alma Mater A W E S O M E C H E E R F U L Write an adjective that means “good”. Write an adjective that means “happy”.
Firestone Building Products
Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,
Lecture 4: Floodfill. Floodfill Overview First assume that there are no walls Give each cell a distance from the goal. The goal has distance 0. Repeat.
Using a Microscope.
STARLIGHT SKYLIGHTS How to Install: Standard Deck Mount Skylights.
Hexagons & Hexagonal Prisms.
Everything about drywall (lather)
Gallerie Wrap Professional quality photo wraps that anyone can do! In Less Than Five Minutes!!!
WELDING Basic Angles Project Copyright © Texas Education Agency, All rights reserved.
Firestone Building Products EPDM Training – Termination and Miscellaneous.
Residential Construction 2201 Installing Vinyl Siding.
Microscope Overview Natural Science Flora. Microscopes Cost is between $600-$800 so lets try to figure a few ways to AVOID breaking them! Cost is between.
Test Your Knowledge- What is Wrong??. 1. What is wrong with the placement location of these dimensions? The longer dimensions have been positioned inside.
Animal Escape Watercolor image utilizing an animal that is ‘escaping’ from the confinement of the border.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Flexible Manufacturing
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
TPO Competitive Test Programs
An introduction to the Compound Light Microscope (This is a note check, for p. 3) You must make sure you have these correct for studying them later.
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
The Pinhole Camera.
Lay two pieces of paper on top of each other. Fold paper “hotdog”.
Vertical Bandsaw Parts & Accessories.
Origami & Kirigami “3-D Tactile Geometry”.
R F Z D W X C E Y M S V N G T I A L H Q P J O U
SCALING & REPLICATING AN IMAGE INTO A DRAWING.
Knife Skills mise en place
One Point Perspective: City Drawing A Tutorial
Welding Tools.
Inside Cover - Right Insert Text / Image Back Cover
Presentation transcript:

TPO Corners

Installing an Outside Corner:

Outside Corner Steps: Complete field and curb membrane attachment.Start welding with pre-molded corner against the curb and work out onto the field sheet. Place welder tip into vertical and work your way out. Be sure to roll the edges of the curb wrap and flashing.

Welding Focus

Something to look for… If the corner cut in the field around the curb extends more than 1” into the field, a patch of TPO membrane is required and then apply the outside corner flashing.

Completed Outside Corner The detail is complete once the corner is installed in accordance with current Firestone details and passes a probing test.

Things to look for

Right or Wrong?

Installing an Inside Corner:

Inside Corner Steps Cut Line Place pre-molded inside corner into corner, being sure to cover the pinhole, and weld from the center out. Make sure to roll the corner properly and avoid over heating the corner.

Installing an Outside Corner: The detail is complete once the corner and T-patch are installed in accordance with current Firestone details and passes a probing test.

Things to look for

Right or Wrong?