Hall-C 12 GeV Project Status Howard Fenker 1/30/09 Hall-C January 2009 Workshop Overall schedule Detector Schedule What have people been working on? Reviews.

Slides:



Advertisements
Similar presentations
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Advertisements

SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
DCal Meeting
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
E08-005: A y 0 in Quasi-Elastic 3 He(e,e’n) Scattering Elena Long Hall A Collaboration Meeting December 17 th, /17/2013Hall A Collaboration MeetingElena.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
AM Software Review. Hall C after 12 GeV Upgrade Beam Energy: 2 – 11 GeV/c Super High Momentum Spectrometer (SHMS) –Horizontal Bender, 3 Quads, Dipole.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
Cherenkov Counters for SoLID Z.-E. Meziani on behalf of Simona Malace & Haiyan Gao (Duke University) Eric Fuchey (Temple University) SoLID Dry Run Review,
Compressor status AWAKE Technical Board meeting 19 August 2015.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
Thomas Jefferson National Accelerator Facility Page 1 Hall-C Hall-C 12 GeV Project Overview of SHMS detector system, Requirements, and Schedule Howard.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
1 SHMS Particle Identification Hall C User’s Winter Workshop, January 30, Garth Huber.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
Transverse Momentum Dependence of Semi-Inclusive Pion and Kaon Production E : Spokespersons Peter Bosted, Rolf Ent, Hamlet Mkrtchyan 25.5 days.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
NP group meeting 14 June Tanja Horn, CUA Colloquium Group meeting, 14 June 2011.
CLAS12 Drift Chamber Prototyping
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Hall C - 12 GeV pCDR Max. Central Momentum 11 GeV/c 9 GeV/c Min. Scattering Angle 5.5 deg 10 deg Momentum Resolution.15% -.2% Solid Angle 2.1 msr 4.4 msr.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
Stephen Wood NPS Collaboration Meeting November 19, 2014 Hall C Status And Lab Perspective on NPS.
CALOR 2012 Vardan Tadevosyan XVth International Conference on Calorimetry in High Energy Physics Santa Fe, NM, June 4 – 8,
Jim Fast Pacific Northwest National Laboratory
HF Test station at P5 A.Mestvirishvili.
Overview of CLAS12 Calibration
The DBD: Outline and Scope
Preparations for a Lehman Review
Hall C KPP Demonstration March 10, 2017.
Extraction Michael Bevins May 17, 2007
East Hall under construction
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

Hall-C 12 GeV Project Status Howard Fenker 1/30/09 Hall-C January 2009 Workshop Overall schedule Detector Schedule What have people been working on? Reviews Endured Recently Future What Happens Next?

12 GeV UPGRADE SCHEDULE

Detectors Schedule shutdown Beam on Today

SHMS Detector Stack

The SHMS Detector System Calorimeter: e/π separation Side Elevation Front Elevation Plan view Yerevan Physics Institute Preshower: Re-use SOS Shower: Gift from HERMES (NIKHEF, Vr.Univ. Amsterdam, Frascati, Yerevan, DESY) Lead-Glass Block / PMT / Base Assemblies from HERMES Low-Exposure modules from HERMES selected Now On-Hand at JLab Tests-to-Date indicate the modules are perfectly suitable for SHMS Glass Transparency PMT Gain Stability

The SHMS Detector System Trigger Hodoscopes - design drawings from JMU group.

Quartz Hodoscope North Carolina A&T

Hall C – 12 GeV University MOUs UNIVERSITYGeneral Collaboration MOUSTATUS Hampton Univw/NSF detector constructionComplete James Madisonw/NSF detector constructionComplete MSU NSCLw/interest in ConstructionUniv signature routing North Carolina A&Tw/NSF detector constructionComplete William & Maryw/NSF detector constructionComplete MOUs serve both the University and JLab— JLab: demonstrates to DoE that we have a commitment for support of those necessary items that are not part of the Project budget. University: provides evidence to administration and funding agencies that the group is an important part of a nationally-recognized effort. We will be developing MOUs with other groups, particularly those who will receive/spend Project funds, in the coming months.

Hall-C Triggers are Simple / Basic Simple trigger block diagram here Perhaps DAQ block diagram SHMS Trigger will be Similar– but it has not been detailed yet.

HB First FULL Coil 20 DEC-2008 Still on the mandrel and inside the Mold Potted and removed from Mold.

Q1 Magnet Trial-Wind completed.

Reviews 11/4/08Director’s Project Review 12/3/08Support Structure/Shield House Reference Design Review >> 2/10/09Horizontal-Bend Magnet Reference Design Review 2/23/09Preliminary Installation Plan Review July ‘09?Lehman Review – Emphasis on Installation? September ’09SHMS Detector Design Review

Director’s Project Review (11/4/08) Summary report for Hall-C 2.2 Tracking Detectors Comments:None Recommendations: None 2.3 Particle Identification Systems Comments 1. The question arose if the pi/e requirements can be reached, given that reactions of the pions will give a tail that extends till under the electron peak. A report on some studies, showing the results of simulations with Geant3 of the PCAL and CAL spectra, was circulated. However, the results are not considered to be conclusive, as it looks as if there will be a considerable loss in the efficiency for electron detection when trying to reach the 1000:1 pion rejection. 2. The question arose if allowing for non-sherical mirrors would result in better light collection. 3. It was not clear what PID method will be used below 4 GeV/c. Recommendations 1. Reinvestigate the pion rejection factor and the accompanying electron efficiency, also checking how well Geant3 (or preferably Geant4) describes measured pion spectra in HMS, and re-evaluate whether the pion rejection requirements quoted by prospective experiments are really necessary. 2.4 Calorimetry Comments 1. The HERMES Pb glass radiators have had their light output degraded by less than 10% due to radiation exposure. This should not present a problem. Recommendations: None 2.5 Trigger and Data Acquisition There are no significant issues. 2.6 Organization and Management Issues Comments 1. Optics simulations to determine the best location should be done before finalizing the mechanical lay-out Recommendations:None

12/03/2008 Super High Momentum Spectrometer (SHMS) Jefferson Laboratory Hall C Carriage Structure Reference Design Alion Science and Technology, Newport News, Virginia Final Reference Design Concept Support Structure Shield House Access Platforms Ladders HB Q1

SS/SH Review (12/3/08) Summary of Draft Report OBSERVATIONS The following items are needed before the Reference Design will be ready to be sent to Procurement for the next phase: 1.Approved technical requirements document. 2.Approved interface document covering the interfaces between the support structure and the equipment on it (magnets, etc.). 3.Drawings need to be updated to show new lead thickness and locations. They should also show the borated polyethylene outside the lead and a typical detail for mounting the poly and lead without needing to drill holes through each lead brick. 4.Provisions for removable shielding around the shield house window need to be included. 5.Preliminary In-Hall Assembly Plan, including how support structure pieces need to be sized to get them into the hall and so a crane can handle them. 6.The need for more or higher capacity bogies needs to be resolved. 7.Re-use of components should be finalized. 8.Bearing design must be finalized. 9.Areas indicated as high stress in the finite element analysis need to be resolved. 10.A convergence model run is needed to verify stresses predicted by the FEA. 11.Hand calculations of weld stresses are needed unless Alion verifies that all welds are in conformance with AWS or AISC design criteria. 12.Stairs/ladders should be shown as envelopes of what is needed. Designs on drawings do not comply with OSHA requirements. Commercial stairs will be much less expensive. 13.All calculations must be checked. CONCLUSION “The feasibility of the design for the Hall C support structure and shield house has been convincingly demonstrated. The project team is now ready to complete the Reference Design in preparation for beginning the search for a Performance Contractor.” The Engineering Contractor delivered the corrected, final Reference Design earlier this week.

So, where do we stand? Procurements – long-lead items progressing: Q1 Magnet – R&D Done. Plan to award construction contract this Spring HB Magnet – R&D Done. Complete review next month, then award contract in Summer. Q2/Q3/Dipole – bid package is on the street … plan to award late this year. Cryo-Control Reservoirs, Superconductor – award contracts this Summer. Carriage/Shield-House – Plan to award Design Contract late this year. Detectors – Designed by October – MRI detectors can then proceed. Remove SOS – May to October of 2011 (middle of Qweak run) Structure Steel, Concrete – begin arriving/installing May, 2012 Magnets, Detectors, Vacuum, Slits, etc. – install in Technical Questions: Detail of Trigger & DAQ, Signal cables, Electronics (S. Wood…) Sieve-slit / Collimator System (T. Horn…) HG Cerenkov Gas System design (??)

See other talks for… Spectrometer Magnets and Structure – Paul Brindza Particle I.D. – Garth Huber SHMS Optics – Tanja Horn Drift Chambers – Peter Monaghan