Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

Chapter 4 Welding Symbols
CHAPTER 4 Dimensioning.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Welded Joints What is welding?
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
IPC Datum Features Datum features indicate the origin of a dimensional relationship between a toleranced feature and a designated feature or.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
HAND FINISHING PROJECT #1 - End ‘A’ Parallel to ‘E’.05mm - Side ‘B’ Parallel to ‘D’.05mm - Side ‘C’ Parallel to opposite side 38 mm.05 mm - End ‘A’ Perpendicular.
Specification of niobium sheets 031/05/2010 O. Capatina G. Arnau Izquierdo W. Weingarten S. Atieh.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
O. Siegmund Brazed body Leak Checking The latest anode on the brazed body assembly seems to have only one leaky pin, others are better than ~10 -9 so the.
Q: How do I view and upload a document? First, Login to NTREIS Transactions First, Login to NTREIS Transactions.
1.3GHz Input Coupler for ILC
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Material samples provided by Niovawe: N22: Niobium.
Status of Activities at CERN
KNOWLEDGE & INTERPRETATION – BOCLAIR ACADEMY – Technical Department.
KNOWLEDGE & INTERPRETATION – Graphic st aidans high.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Print Reading for Industry BRX 210 – Module 1
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
Unit 22 Welding Prints. Unit 22 Welding Prints.
Beam Vacuum Interconnect Design Options Ray Veness.
Documentation on present system and piping layout P. Tropea Tracker Upgrade Engineering and Cooling 12 November 2008.
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Beam tube for Crab Cavity Beam tube provided by.
Results of short module and qualification strategy
435B Transport Container Fabrication Challenges and Solutions
SPL RF coupler: integration aspects
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Solenoid Yoke Door-Barrel Connection
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Wideband kickers Mechanical design and Fabrication
LARP Phase II Secondary Collimator RC1
Preliminary Y-chamber specifications – First draft
EBTF Design Review Technical Meeting Group
Firs samples Injection direction
Injection direction This area is OK , because the pin into the tube have a supporting point in this area . The injection force push the pin to the other.
First Article Inspection Report (FAIR) Training
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
LARP Phase II Secondary Collimator RC-1
Function Machines – Simple – Worksheet A
Mixed Numbers & Improper Fractions – Converting – Spot the Mistake
Mixed Numbers – Adding & Subtracting – Spot the Mistake
Linear Graphs – Gradient-Intercept Method – Worksheet A
Mixed Numbers – Dividing – Spot the Mistake
Mixed Numbers – Subtracting – Spot the Mistake
Production Cryo HL-LHC BPMs
Unit Fractions – Mixed Arithmetic – Spot the Mistake
Mixed Numbers – Multiplying & Dividing – Spot the Mistake
Improper Fractions to Mixed Numbers – Spot the Mistake
Mixed Numbers – Adding – Spot the Mistake
Mixed Numbers to Improper Fractions – Spot the Mistake
Plan for completion of Task 2
Presentation transcript:

Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141

Material samples #DrawingComments R000-A02t=3mm, ok but for cavity body t=4mm (new samples) 2Please indicate that edges of the plate are either parallel or perpendicular to rolling direction R000-A04idem 16/10/20142 Samples are to be provided for every batch of material (heat nº) CERN material certificates for SS flanges:

Last comments sent (all prints) #Drawing Comment A50 D7 – welded from both sides? A53 D5 – welded from both sides? Same for C A13 B5 – position 1 and 2 not indicated on the drawing Complex welding to be discussed P02 Deep drawing seems too deep. Is there enough material? + trimming… P05 Same as for P A51 C6 – welding detail: 60/60 but only 1 side? A73 B1 – filet brazing (Nota) – tbd B1 – radius 0.1mm might be increased in all CF flanges (tbd) (sheet 2/2) B7, C2 – geometrical tolerances tbd (sheet 2/2) P02 C6 – mixed tolerances? A78 Geometrical tolerances to be discussed P01 Missing welding detail of the tube A76 D6- welded 60% from both sides? P03 Missing welding detail of the tube P05 B6 – g6 or H7? P01 Missing welding detail of the tube P01 Missing welding detail of the tube P01 Missing welding detail of the tube P02 Missing welding detail of the tube P01 B5 – geometrical tolerances tbd A5 – missing reference C… A7? A77 Brazing symbol. Why filet weld is required? Leak tightness? Tbd B7 – sheet 2/2 – tolerances to be discussed Machining of centre slot not indicated 16/10/20143

Production prints: summary 16/10/20144 #DrawingComments A50 1-2B7 – missing reference A50 2-2tolerances to be discussed… Note 2: orientation critical… is it shown? P02B6 – tolerances enough? tbd P02(!) A73 2/2 Step in the inner diameter tbd P03tolerances to be discussed… R001-P03Missing tolerances on inner diameter Welding symbol: change side See next slide A73Welding annotations: W01, W02, W03…next slide Intermediate assembly step: add geometrical tolerances?

16/10/20145 Production prints: specific comments

16/10/20146

7

8

9 Discussed during the meeting- to be checked (consistency of tolerances)

16/10/201410

Suggestions for welding details 16/10/ Technical contact: Paula Freijedo-Menendez

16/10/ Technical contact: Paula Freijedo-Menendez