Variance Analysis. Variance analysis Variance analysis is the evaluation of performance by means of variances, whose timely reporting increase the opportunity.

Slides:



Advertisements
Similar presentations
Costs and Budgeting.
Advertisements

Standard costs and Variance analysis Unit 10 University of Sunderland Dr Vidya Kumar 1.
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 17 Budgetary Control.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
Standard Costing and Variance Analysis
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Standard costing.
C H A P T E R 9 Evaluating Personnel and Divisions.
Standard Costing and Variance Analysis
Chapter 10 Standard Costing: A Managerial Control Tool
VARIANCE ANALYSIS 1 LECTURE 8.
Costs & Break-Even GCSE Business Studies tutor2u™
Standard Costs and Balanced Scorecard
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
Costs and Costing Systems Cost Units – units of output to which costs can be charged A cost is simply an item of expenditure Costs are defined as the normal.
Chapter 12 – Standard Costs: Direct Labor and Materials
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Four: Information for planning, control and performance.
Chapter 17 – Additional Topics in Variance Analysis
Financial and Managerial Accounting
Standard Costs Budget for a single unit
Flexible Budgets and Variance Analysis
This test consists of 10 questions designed to test your understanding of methods of budgeting The links provide you with a choice of answer, along with.
Budgeting - HL Only Learning Objective:
Chapter 21 Flexible Budgets and Standard Costing.
IGCSE Economics 4.2 Costs of Production.
Business Funding & Financial Awareness CAPITAL BUDETING J R Davies May 2011.
Deluxe Linens Deluxe Linens makes high-end sheets which they sell to major retail stores and on their website. The budgeted costs for materials and direct.
Standard Costing and Variance Analysis
IB Business and Management 3.4 Budgeting. Learning Outcomes To be able to explain the importance of budgeting for organisations Calculate and interpret.
1 Module 3 Costing Techniques. 2 (3.1) MARGINAL COSTING (A) Important Formulae Contribution (c) = Sales (s) – Variable cost (v) N= No. of units sold,
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Use with Business Accounting and Finance Second Edition by Catherine Gowthorpe ISBN © 2005 Thomson Learning.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number Can use PC or mobile!
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
Chapter 16 Fundamentals of Variance Analysis.
Copyright 2004 – Biz/ed Costs and Budgeting.
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
1 Budgeting Learning Objective: Understand the function of financial budgets. Awareness of the concept of a financial budget Pg
9-1 Standard Costing: A Functional-Based Control Approach 9.
F5 Performance Management. 2 Section D: Standard Costing And Variance Analysis Designed to give you knowledge and application of: D1. Budgeting and standard.
Supply.  Labor and output  One basic question every business owner must answer is how many workers to hire  Marginal product of labor: the change of.
Measuring and Increasing Profit. Unit 1 Reminder – What is Profit? Profit is the reward or return for taking risks & making investments.
Variance Analysis. Within the context of management accounting, variance analysis studies differences between actual and budgeted figures and looks at.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & standard costing E2. Functional budgets E4. Basic.
Actual Outcome or Income – Budgeted Outcome or Income FAVOURABLE Variance = good for the business, this means that the actual figures are better than.
BREAK-EVEN (BE) Unit 2 Business Development Finance GCSE Business Studies.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Standard costing.
GCSE Business Studies Unit 2 Developing a Business
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 15
Good or bad? Actual income was £500 less than budgeted for the period.
Copyright © 2013 Nelson Education Ltd.
MANAGEMENT AND COST ACCOUNTING
Principles of Accounting 2002e
Standard Costing and Variance Analysis
Costs and Budgeting.
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Cost accounting Session 7.
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Variance Analysis

Variance analysis Variance analysis is the evaluation of performance by means of variances, whose timely reporting increase the opportunity for remedial action Variance analysis is the evaluation of performance by means of variances, whose timely reporting increase the opportunity for remedial action Variance analysis involves an investigation of the difference between Variance analysis involves an investigation of the difference between –Actual costs and standard costs or –Between actual costs/revenue and budget costs/revenue It enables mangers to identify problems which need further investigation with a view to implementing remedial action It enables mangers to identify problems which need further investigation with a view to implementing remedial action The value of variance analysis lies in managers being able to isolate where increased costs are actually occurring and take remedial action in that specific area The value of variance analysis lies in managers being able to isolate where increased costs are actually occurring and take remedial action in that specific area

Standards and budgets Standard costing and budgeting share one thing in common - they are both concerned with the future rather than what has happened Standard costing and budgeting share one thing in common - they are both concerned with the future rather than what has happened But there is an important difference - budgets relate to aggregates (e.g. sales revenue and total costs) whereas standards refer to per unit figures But there is an important difference - budgets relate to aggregates (e.g. sales revenue and total costs) whereas standards refer to per unit figures Variances can be calculated against both standards and variance but for the sake of simplicity we will focus on variances against budget figures Variances can be calculated against both standards and variance but for the sake of simplicity we will focus on variances against budget figures Instead of using terms like standard costs or standard price we will use the terms budget price per unit or budget quantity Instead of using terms like standard costs or standard price we will use the terms budget price per unit or budget quantity

Variance A variance is the difference between the budgeted level of costs and revenue and the actual levels of costs and revenues A variance is the difference between the budgeted level of costs and revenue and the actual levels of costs and revenues Positive/favourable variance Positive/favourable variance –A better than expected result –Costs lower or revenue higher than expected –Should led to higher than expected profits Negative/adverse/unfavourable variance Negative/adverse/unfavourable variance –A worse than expected result –Costs higher or revenue lower than expected –Should led to lower than expected profits

Steps to be taken Construct a budget Construct a budget Monitor results against the budget Monitor results against the budget Identify the variance Identify the variance Calculate the variance Calculate the variance Analyse and explain the variance Analyse and explain the variance Evaluate the significance of the variance both in absolute terms and in proportionate terms Evaluate the significance of the variance both in absolute terms and in proportionate terms Attribute responsibility for the variance Attribute responsibility for the variance Take action to correct the problem Take action to correct the problem

Basic variances Actual Budgets Actual Budgets Sales revenue £9.7m £10m Sales revenue £9.7m £10m Total costs £9.5m £9m Total costs £9.5m £9m Profits £0.2m £1m Profits £0.2m £1m Sales revenue was £300k down on the budget figure- this was an adverse variance of £300k Sales revenue was £300k down on the budget figure- this was an adverse variance of £300k Costs were £500k up on the budget figure- again adverse variance but this time of £500k Costs were £500k up on the budget figure- again adverse variance but this time of £500k Add the two together and there is £800k variance on profits Add the two together and there is £800k variance on profits

Types of variance Sales variance - sales revenue different from expected Sales variance - sales revenue different from expected Cost variance - total costs different from expected Cost variance - total costs different from expected Materials variance - cost of direct materials different from expected Materials variance - cost of direct materials different from expected Labour variance - cost of direct labour different from expected Labour variance - cost of direct labour different from expected Overhead variance - overhead costs different from expected Overhead variance - overhead costs different from expected Profit variance - profits different from expected Profit variance - profits different from expected These are the broad headings for variances but within each category there are sub variances These are the broad headings for variances but within each category there are sub variances

Quantity or price? In all cases variances are caused by either In all cases variances are caused by either –A price which is different from that planned –Volume which is different from that planned Alternatively it is possible that a variance might be caused by a combination of the two Alternatively it is possible that a variance might be caused by a combination of the two The purpose of variance analysis is to separate out the two elements The purpose of variance analysis is to separate out the two elements

Saes revenue variance

Sales revenue variance This is where sales revenue is different from expected. This is where sales revenue is different from expected. It is the result of It is the result of Sales volume variance - caused by the actual volume quantity sold being different from the planned volume Sales volume variance - caused by the actual volume quantity sold being different from the planned volume A volume variance measures the impact on revenue of the difference between actual and expected quantity sold A volume variance measures the impact on revenue of the difference between actual and expected quantity soldAnd/or Sales price variance – caused by a difference in the price actually paid compared to that in the budget Sales price variance – caused by a difference in the price actually paid compared to that in the budget A price variance measures the difference between the planned price and the actual selling price A price variance measures the difference between the planned price and the actual selling price

Sales revenue variance Actual Budget Actual Budget Quantity sold 9m 10m Quantity sold 9m 10m Price per unit £3.5 £3.6 Price per unit £3.5 £3.6 Sales revenue £31.5m £36m Sales revenue £31.5m £36m There was an variance on sales revenue of £4.5m.This was caused by a combination of a lower than planned level of sales and a price charged which was lower than planned There was an variance on sales revenue of £4.5m.This was caused by a combination of a lower than planned level of sales and a price charged which was lower than planned We can disaggregate the £4.5m by separating out the quantity/volume variance from the price variance We can disaggregate the £4.5m by separating out the quantity/volume variance from the price variance

Formulae Sales revenue variance = Sales revenue variance = (AQ X AP) minus (BQ X BP) Price variance = Price variance = (AP- BP) x AQ Volume/ quantity variance = Volume/ quantity variance = (AQ –BQ) x BP Where AP is actual price per unit and AQ is actual quantity sold Where AP is actual price per unit and AQ is actual quantity sold and BP is budget price per unit and BQ is budget quantity sold and BP is budget price per unit and BQ is budget quantity sold

Sales revenue variance The overall variance is (9m x £3.5) minus (10m x 3.6) = £31.5m minus £36m. This is an variance of - £4.5m The overall variance is (9m x £3.5) minus (10m x 3.6) = £31.5m minus £36m. This is an variance of - £4.5m It can broken down into price and volume variances It can broken down into price and volume variances Price variance = (£3.5-£3.6) x 9m = - £0.9m Price variance = (£3.5-£3.6) x 9m = - £0.9m Volume variance =(9m - 10m) x £3.6 = - £3.6m Volume variance =(9m - 10m) x £3.6 = - £3.6m Notice that the price and volume variances sum to -£3.4.5m Notice that the price and volume variances sum to -£3.4.5m Both variance are adverse although the volume variance was of greater significance than the price variance Both variance are adverse although the volume variance was of greater significance than the price variance

Direct materials variance

Material variances Variance on the cost of materials used as inputs can be attributed to: Variance on the cost of materials used as inputs can be attributed to: Materials price variance Materials price variance –Difference between planned cost and the actual cost per unit of materials used. and/or and/or Materials usage variance Materials usage variance –The difference between the planned quantity of materials used and the actual quantity used

Materials variance Actual Budget Actual Budget Cost per unit £5 £4 Cost per unit £5 £4 Quantity in units Quantity in units Total costs £2500 £2200 Total costs £2500 £2200 There is an adverse variance of £300 on direct materials used in production There is an adverse variance of £300 on direct materials used in production Notice that there was an adverse variance on price per unit but a favourable variance on quantity of materials used. Clearly the adverse variance more than cancelled out the favourable one Notice that there was an adverse variance on price per unit but a favourable variance on quantity of materials used. Clearly the adverse variance more than cancelled out the favourable one

Formulae Direct materials cost variance = Direct materials cost variance = (AQ x AC) minus (BQ x BC) Direct materials price variance = Direct materials price variance = (AC – BC) x AQ Direct materials usage variance = Direct materials usage variance = (AQ – BQ) x BC Where AQ is actual quantity used and AC is actual cost per unit Where AQ is actual quantity used and AC is actual cost per unit And BQ is budget quantity and BC is budget cost per unit And BQ is budget quantity and BC is budget cost per unit

Materials variance The total variance is (£5 x 500) minus (£4 x 550) = £2500- £2200 = £300 (adverse) The total variance is (£5 x 500) minus (£4 x 550) = £2500- £2200 = £300 (adverse) The variance on cost per unit of materials was (£5-£4) x 500 = £500 (adverse) The variance on cost per unit of materials was (£5-£4) x 500 = £500 (adverse) The variance on materials usage was ( ) x £4 = £200 (favourable) The variance on materials usage was ( ) x £4 = £200 (favourable) The adverse cost variance was greater than the favourable usage variance leading to an adverse variance overall The adverse cost variance was greater than the favourable usage variance leading to an adverse variance overall

Direct labour variance

Labour variance This type of variance is related to the cost of labour employed – both price of labour and/or its efficiency This type of variance is related to the cost of labour employed – both price of labour and/or its efficiency Total labour cost variance - this is the difference between what it cost to employ direct labour and what it was expected to cost for the actual level of production Total labour cost variance - this is the difference between what it cost to employ direct labour and what it was expected to cost for the actual level of production Labour rate (price) variance - labour available at a price different from expected. The variance is the difference between the wage rate that was expected to be paid and the wage rate actually paid Labour rate (price) variance - labour available at a price different from expected. The variance is the difference between the wage rate that was expected to be paid and the wage rate actually paid Labour efficiency variance - production required more (or less) labour than expected or planned. It is caused by labour being more (or less) efficient than was expected Labour efficiency variance - production required more (or less) labour than expected or planned. It is caused by labour being more (or less) efficient than was expected

Labour variance Actual Budget Actual Budget Rate per hour £9 £8 Rate per hour £9 £8 Hours of labour required 50,000 40,000 Hours of labour required 50,000 40,000 Total cost of labour £450,000 £320,000 Total cost of labour £450,000 £320,000 There was an adverse variance on direct labour of £130,000 There was an adverse variance on direct labour of £130,000 It was caused by a combination higher than planned wage rate and higher than planned quantity of labour to complete the work It was caused by a combination higher than planned wage rate and higher than planned quantity of labour to complete the work But which of the two was more important? But which of the two was more important?

Formulae Total labour cost variance= Total labour cost variance= (AR x AH) minus (BR x BH) Labour rate variance = Labour rate variance = (AR- BR) x AH Labour efficiency variance = Labour efficiency variance = (AH – BH) x BR Where AR is actual wage rate per hour and AH is actual number of hours needed to complete the job Where AR is actual wage rate per hour and AH is actual number of hours needed to complete the job And BR is budget wage rate per hour and BH is budget hours to complete the job And BR is budget wage rate per hour and BH is budget hours to complete the job

Labour variances The overall labour cost variance is = (£9 x 50k) minus (£8 x 40k) = £450k - £320k = £130k The overall labour cost variance is = (£9 x 50k) minus (£8 x 40k) = £450k - £320k = £130k The labour rate variance is (£9 - £8) x 50k = £50k The labour rate variance is (£9 - £8) x 50k = £50k The labour efficiency variance is (50k-40k) x £8 = £80k The labour efficiency variance is (50k-40k) x £8 = £80k The high variance on labour costs was caused by a rise in the rate paid per hour and an increase in labour required over the quantity planned in the budget. Of the two variances the efficiency variances producer the greater impact The high variance on labour costs was caused by a rise in the rate paid per hour and an increase in labour required over the quantity planned in the budget. Of the two variances the efficiency variances producer the greater impact

Overhead variances

Fixed overhead expenditure variance Formula: budgeted fixed overheads minus actual fixed overheads Formula: budgeted fixed overheads minus actual fixed overheads Caused by a change in price of fixed overheads e.g. rent, standing charges Caused by a change in price of fixed overheads e.g. rent, standing charges If expenditure is higher than expected it could mean the full costs of overheads is not being absorbed (covered) in the price If expenditure is higher than expected it could mean the full costs of overheads is not being absorbed (covered) in the price Over absorption occurs if actual overhead costs are less than standard Over absorption occurs if actual overhead costs are less than standard

Variable overhead variances Overall variance = budget cost of variable overheads minus actual costs of variable overheads Overall variance = budget cost of variable overheads minus actual costs of variable overheads or (actual production x budget variable overhead rate per unit) -actual variable overhead cost or (actual production x budget variable overhead rate per unit) -actual variable overhead cost Caused by Caused by –Changes in overhead costs e.g. changes in the cost of water, gas, electricity –Or changes in activity levels linked to labour or machine hours worked

Overhead volume variance This is cause by changes in activity levels linked to labour or machine hours worked This is cause by changes in activity levels linked to labour or machine hours worked Formula: (budget quantity of input hours for actual production-actual input hours) x variable overhead rate Formula: (budget quantity of input hours for actual production-actual input hours) x variable overhead rate If actual output is less than planned this will cause a variance because overheads will not be fully absorbed If actual output is less than planned this will cause a variance because overheads will not be fully absorbed Output/sales in excess of plans will lead to over-absorption Output/sales in excess of plans will lead to over-absorption

Interdependence of variances (1) The cause of a particular variance may affect another variance in a corresponding or opposite way The cause of a particular variance may affect another variance in a corresponding or opposite way Workers trying to improve productivity (favourable labour efficiency variance) might become careless and waste more material (adverse material usage variance) Workers trying to improve productivity (favourable labour efficiency variance) might become careless and waste more material (adverse material usage variance)

Interdependence of variances (2) A new improved machine becomes available which causes A new improved machine becomes available which causes An adverse fixed overhead expenditure variance (because this machine is more expensive and depreciation is higher) An adverse fixed overhead expenditure variance (because this machine is more expensive and depreciation is higher) Favourable wage efficiency and fixed overhead volume variances (higher productivity) Favourable wage efficiency and fixed overhead volume variances (higher productivity)

Interdependence of variances (3) If supplies of a specified material are not available, this may lead to If supplies of a specified material are not available, this may lead to A favourable price variance (cheaper material used) A favourable price variance (cheaper material used) An adverse usage variance (cheaper material caused more wastage) An adverse usage variance (cheaper material caused more wastage) An adverse fixed overhead volume variance (production delayed while material was unavailable) An adverse fixed overhead volume variance (production delayed while material was unavailable) An adverse sales volume variance (unable to meet demand due to production difficulties) An adverse sales volume variance (unable to meet demand due to production difficulties)