Product Redesign MTAC Update February 6, 2003. PRODUCT REDESIGN Bob O’Brien – Industry Co-Chair John DePiazza Joe Lubenow Clarence Banks Robert Lindsay.

Slides:



Advertisements
Similar presentations
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
Advertisements

CO-PALLETIZATION AND CO-MAILING UPDATE Mailers’ Technical Advisory Committee (MTAC), May 17, Update on Co-Palletization and Co-Mailing May 17, 2006.
MTAC General Session Meeting Electronic Verification System (eVS)/ Product Tracking System (PTS) User Group #2 February 16, 2011.
1 MTAC 117  Workgroup Leaders Ty Taylor / Pritha Mehra  Origin Containerization Joel Walker / Sharon Harrison  Continuous Mailers Steve Krejcik / Kelly.
1 R Mail Preparation Changes NCSC January 18, 2007.
Seamless Acceptance Pritha Mehra, USPS Manager, Marketing Technology & Channel Management.
1 Shaping a More Efficient Future Pricing Change Effective Monday, May 14.
1 Product Redesign MTAC Update Cost-Based Rates for Periodicals and Standard Flats February 5, 2004.
Flats Strategy Managing Cost and Maximizing Efficiencies Joe Schick Vice President of Postal Affairs.
Price Change 2015 USPS Pricing Overview May 2015.
Price Change Effective April 26, 2015 Northeast Area Mailing Industry Focus Group Meeting February 25,
Reduce Postage Costs and Improve Delivery, Combined Mailing Solutions PCC Mailers Forum 2014 September 10 th, 2014 Deborah Damore Fairrington Transportation.
1 DSCF Entry Discount Review Tampa Bay Suncoast PCC January 14, 2015.
MTAC WG 114 MTAC Workgroup 114 Establish Service Standards and Measurement Update – May 16, 2007.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
Welcome to the State Mail User’s Forum. Introduction to State Mail & Distribution Services.
An Overview Rita Cohen Mailers Technical Advisory Committee February 22, 2007.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
Product Redesign Update Mailers Technical Advisory Committee May 16, 2002.
® Flats Track for Periodicals, Catalogs & Printers David Mastervich Manager, Periodicals, Catalogs & Saturation Rosa Fulton Executive Director, FSS National.
® Service Standards and Targets September 19, 2008.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report February 5, 2004.
1 MTAC 117 Intelligent Mail Barcodes and Electronic Documentation Workgroup Update.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
MTAC 114 Package Services Sub-Group Service Standards for Market Dominant Products Package Services and Standard Mail Parcels Sub-group Update June 13,
® Intelligent Mail NPPC May 13, Intelligent Mail Vision Provide end-to-end visibility, throughout the entire supply chain, using:  Standardized.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
Optimizing Parcel Preparation & Entry for Seamless Acceptance Final Presentation MTAC Work Group # 109 Industry Leader: Wendy Smith USPS Leader: Jim Cochrane.
MTAC Address Quality Steering Committee. Summary of Activity: Steering Committee met on July 19, 2005 Goal: To achieve excellence in Address Quality Objective:
Mailing Industry View and Congressional Update Northeast Area Mailing Industry Focus Group Meeting Joe Schick Vice President of Postal Affairs.
Postal Logistics & Transportation Jeff Kruepke Quad/Transportation Services (414)
MTAC Workgroup # 87 Update Improving the Drop Shipment Process Washington, D.C. May 18, 2006.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
1 Shaping a More Efficient Future Price Change Proposal Mailers’ Technical Advisory Committee Stephen M. Kearney Vice President Pricing & Classification.
Mailing Services Prices Mailers’ Technical Advisory Committee February 19, 2009 Maura Robinson VP Pricing.
1 Executive Steering Committee Corporate Automation Plan Phase 2 MTAC Meeting November 5, 2003.
Optimizing Parcel Preparation & Entry for Seamless Acceptance MTAC Work Group # 109 Industry Leaders: Chris Finley & Wendy Smith USPS Leader: Jim Cochrane.
PSA and MTAC A Working Relationship November 2, 2005 Pierce Myers Parcel Shippers Association.
MTAC Work Group #82 Parcel Delivery Performance Measurement Effectiveness.
® Service Standards and Performance Measurement MTAC Workgroup 114 Status Report.
1 Seamless Acceptance, Performance- Based Verification Implementation, Benefits, Obstacles and Feedback Ty Taylor, JC Penney Pritha Mehra, USPS MTAC 117.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
1 Postal Operations John Rapp Senior Vice President, Operations.
Workgroup # 120 Communicating Entry Requirements/ In-Home Delivery Dates Solutions/ Seasonality Impacts INDUSTRY CO-CHAIR DALE MILLER POSTAL CO-CHAIR CHRIS.
SERVICE STANDARDS MTAC Work Group #114 February 21, 2007 Jeffrey C. Williamson Manager, Network Development & Support.
1 Product Redesign MTAC Update November 5, Steering Committee Will Continue To Meet –Regular Updates And Feedback Regarding USPS Activity on Key.
Co-Mail UPDATE Jim Wiseman. Co-Mailing What is it?
1 Update on Proposed Prices and Standards Mailers’ Technical Advisory Committee Steve Kearney Vice President, Pricing & Classification Joe Moeller Manager,
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report May 6, 2004.
PRESORT OPTIMIZATION WORK GROUP February 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
February 23, 2006 MTAC Workgroup #87 Improving the Drop Shipment Process Update.
Product Redesign MTAC Update November 7, Workgroups Joint Meeting of Workgroups –Originally Planning For Early 2003 –Primarily Information Sharing.
MMA presentation for MTAC August 2, MTAC Association Presentation Wednesday, August 2, 2006.
1 MTAC 117 – Periodicals Subgroup  USPS Co-Chairs: Bob Galaher, Ruth Stock  Industry Co-Chair: John Stark  Objective: Identify any constraints and define.
1 MTAC WORKGROUP #111 MTAC GENERAL SESSION PRESENTATION August 2, 2007 Presented By Cher Rupp-Ruggeri Steve Colella.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
1 MTAC WG #175 Update for Northeast Area Focus Group May 4 th,
FLAT MAIL PREPARATION OPTIMIZATION February 24, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC February 24, 2005.
Maximizing Postage Savings and Delivery for Small-Volume and Local/Regional Periodicals Max Heath, National Newspaper Association Susan Thomas, Mailing.
USPS 2017 Pricing Overview New York PCC - January 18, 2017.
January 2017 Price Structure Considerations
Standard Mail Volume Profile
Panel 2: Flats Containerization
Price Change 2018 January 2018.
Price Change 2018 October 2017.
Periodicals Simplification Ideas February 23, 2017 Key Points
USPS Proposed Pricing Overview
Price Change 2019 January 2019.
Presentation transcript:

Product Redesign MTAC Update February 6, 2003

PRODUCT REDESIGN Bob O’Brien – Industry Co-Chair John DePiazza Joe Lubenow Clarence Banks Robert Lindsay Pierce Myers Anita Pursley Dennis MacHarg Val Scansaroli Steering Committee - Industry

PRODUCT REDESIGN First-Class - John DePiazza / Susan Campbell Periodicals - Val Scansaroli / Rick Arvonio Standard - Anita Pursley / Cheryl Beller BPM - Charley Howard / Sharon Daniel Parcels - Steve Zwieg / Jim Cochrane Addressing - Joe Lubenow / Wayne Orbke Workgroup Co-Chairs – Industry / USPS

Workgroups Steering Committee Met Tuesday 02/04 Redesign in the Context of: –CSRS Legislation –Omnibus Rate-Case: Timing & Phasing –NIA: Combined Cost; Mailer Response Joint Meeting of Workgroups –Wait For Clarification on Above Items –Send Out Summary of Where Workgroup Proposals Stand PRODUCT REDESIGN

Analyzed Data on Make-up “Before & After” –Results From Real Mailings Very Close to Results From Simulated Mailings –Still Need Additional Data on Real Mailings Collected Information on Extent of Use –Wide Variation –Some Use 17-piece Minimum for Most Mailings –Some Continue to Use 10-piece Minimum Optional D Bundle Minimum in Standard PRODUCT REDESIGN

Factors Affecting Optimal 5-D Minimum Low Piece Weights –More 5-D bundles convert into one 3-D bundle Low-to-Moderate Mailing Density –25% or more of 5-D bundles <= 17 pieces Ability to Build 3-D Bundles Up to 20- pound Limits –If 3-D bundles limited to 3” high, get fewer 5-D bundles converting to one 3-D bundle PRODUCT REDESIGN

Need Your Help to Learn About Effects Make-up at 10-pieces & alternative minimum Would Like Before & After Data For –Number of 5-Digit & 3-Digit Bundles –Number of 5-Digit & 3-Digit Pieces –Piece Weight –Total Pieces and Bundles Constraints on Make-up other than 20 lbs. –Maximum Heights for Bundles in Sacks –Maximum Heights for Production Reasons PRODUCT REDESIGN

Mailer Suggestion: Allow DDU entry of Standard Parcels at DBMC or DSCF rates –Improve Service Consistency for Customers –Postal Service Cost Savings Implement With Customer Support Ruling –Allow DBMC Rate With No Minimum –Allow DSCF Rate With 10 pounds for a 5-Digit Customer Support Ruling Issued December 10th PRODUCT REDESIGN DDU Entry for Standard Parcels

For small volume mailings now origin- entered in sacks Additional incentives for bundles that are newly: –Co-palletized on ADC and SCF pallets and –Drop shipped to DADC or DSCF Settlement Accepted by PRC and Governors Applications Accepted February 10th Implementation on April 20th Co-palletization of Periodicals Flats Bundles PRODUCT REDESIGN

Low cost, no frills merchandise returns service – Capitalize on USPS operational savings Mailer or Consolidator Picks up Bulk Returns at DDU, DBMC, or “Origin” BMC – Allows providers to offer value added services – Credit returns – Redirect merchandise Assumptions Underlying Financial Analysis Being Validated –Probable Spring Filing PRODUCT REDESIGN Parcel Select™ Return Service