Lead from the front Texas Nodal 1 Texas Nodal CRR Requirements Overview of Requirements for TPTF Shawna Jirasek and Beth Garza September.

Slides:



Advertisements
Similar presentations
March 13, 2013 ERCOT Public CRR Transaction Limits NPRR463 Implementation Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Advertisements

Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Lead from the front Texas Nodal 1 Texas Nodal CRR Optimization Trade-Offs Presentation to address trade-offs between different strategies.
Texas Nodal 1 Texas Nodal Settlements Mini-Market - CRR July 31, 2007.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
February, 2012 ERCOT Public ERCOT CRR Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
March 6, 2012 ERCOT Public ERCOT CRR Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Market Participant Data Access 1 Market Participant Data Access Jan Stephen Kerr.
Network Model Management System (NMMS)
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager NATF 31 August 2010.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
ERCOT Clarification for PCRR Allocation Terms and Conditions Should this sentence be included under Refund option [Section 7.4.2(c)(i)] Before the applicable.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
Congestion Revenue Rights 1 TCR to CRR Transition Plan NOIE Workshop Nodal CRR registration process for NOIEs (REVISED) Beth Garza.
Lead from the front Texas Nodal 1 Texas Nodal CRR Auction Block Alternatives TPTF Presentation Beth Garza, CRR Package Leader August.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
CRR MUI Upgrade Requalification Demonstration WebEx
Market Trials Congestion Revenue Rights
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
ERCOT CRR Update to CMWG
PR CRR Framework Upgrade
Presentation transcript:

Lead from the front Texas Nodal 1 Texas Nodal CRR Requirements Overview of Requirements for TPTF Shawna Jirasek and Beth Garza September 11, 2006

Lead from the front Texas Nodal 2 Agenda Overview Requirements Sections –General –Auction –Allocation –Bilateral Market –Data Exchange Conceptual System Design Overview

Lead from the front Texas Nodal 3 Overview CRR Team is led by Shawna Jirasek and Beth Garza. This presentation highlights areas of interest or contention in the CRR Requirements The entire CRR Requirements Document is presented for approval The September 2005 protocols used as a baseline for these protocols but changes resulting from the August 2006 approved version and the in-flight NPRRs are noted. The CRR Conceptual System Design is provided in draft and is not yet set for approval.

Lead from the front Texas Nodal 4 General Requirements Defining CRRs Requirement IdFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) 7.1 (1); 7.1 (3) (a); 7.1 (3) (b); 7.1 (3) (c); 7.1 (3) (d); 7.1 (3) (e); 7.2 (c); 7.3 (1) (a); 7.3 (1) (b); 7.3 (1) (c); 7.3 (6) (a); 7.3 (6) (b); 7.3 (6) ©; 7.3 (6) (d); 7.3 (8)*** ***Per inflight NPRR, approved by TPTF Coverage of SourcePartial Description: The CRR System shall support the following products of CRRs: Categories: Point-to-Point (PTP) Options, Point-to-Point (PTP) Obligations and Flowgate Rights (FGRs). Types: tradable & non-tradable. Classes: Auction, Allocation & Bilateral Market. Time of Use blocks: weekday peak (5x16), weekend peak (2x16), off-peak (7x8) and the 24 hour combination of the three (3) times of use (7x24). This parameter shall be configurable by the CRR Market Operator to meet market Protocols. –An awarded CRR Auction Bid and PCRR allocation for each one-month strip of 7x24 block shall be recorded by ERCOT as one one-month strip of the 5x16 block, one one-month strip of the 2x16 block, and one one- month strip of the 7x8 block of the same MW amount, the same CRR source and CRR sink or flowgate, and the same month as the 7x24 block.*** ***This portion of the requirement is based on the TPTF approved but still in-flight NPRR protocol revision and is still pending Nodal change control approval.

Lead from the front Texas Nodal 5 General Requirements Defining CRRs Requirement IdFR2 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) 7.2 (a); 7.2 (b); 7.2 (d); 7.3 (6) (a); 7.3 (6) (b); 7.3 (6) (c); 7.3 (6) (d) Coverage of SourcePartial Description: A CRR is defined as a PTP Option or PTP Obligation or a Flowgate Right (FGR). A PTP Option or PTP Obligation is defined as a right from a Source to a Sink for a number of MWs for a certain time of use from a start date to an end date. A FGR is defined as a right for a number of MWs for a certain time of use from a start date to an end date with a designated directional network element, or a bundle of directional network elements. The quantity of CRRs identified by the CRR system is a function of transmission network capacity. The quantity of CRRs owned by each CRR owner shall be stored by the CRR system. Tradable CRRs shall be permitted to be exchanged between the CRR Owner and a CRR Account Holder from a start date to an end date in quantities as small as one Time of Use Block*** and one-tenth of a MW; not to exceed the block (times of use), dates or quantity of MW that are owned. *** This portion of the requirement is based on the TPTF approved but still in-flight NPRR protocol revision and is still pending Nodal change control approval.

Lead from the front Texas Nodal 6 General Requirements CRR System Requirement IdFR8 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (1); (6) (b); (7) (b) Coverage of SourcePartial Description: The CRR system shall schedule markets to run in the following order, begun by a CRR Market Operator: PTP Allocation (Stage 1) MCFRI Allocation (Stage 2) Auction Each subsequent market shall be run including the results of the previous markets, including all already allocated and awarded CRRs.

Lead from the front Texas Nodal 7 General Requirements CRR System Requirement IdFR12 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (2); (2) (a); (2) (b); (2) (c); (2) (d); (2) (e); (2) (f); (2) (g); Coverage of SourcePartial Description: The CRR System shall make available on the MIS Public Area the following information to all market participants once a market run (auction or allocation) has been posted: Aggregated CRR Results (including CRR identifier, CRR type, clearing price for auctions, source and sink for PTP or Flowgate for flowgate rights, start and end dates for the right and MW amount). Identity and post contingency flow of each binding directional element based on the CRR Network Model used in the CRR Auction All CRR bid, offer and nominations without identifying the owner.

Lead from the front Texas Nodal 8 General Requirements CRR System Requirement IdFR14 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) ; (1) (c); (1) (d); (1) (f); (1) (g); (1); (4) Coverage of SourcePartial Description: The CRR System shall provide functionality that shall enable CRR Market Operators to issue public and private messages to CRR account holders. The messaging functionality shall be capable of attaching files including but not limited to the following types: Microsoft Office Compressed files PDF PSS/E RAWD AutoCAD files Image Text At a minimum, the system must be capable of handling attachments of 5MB per message.

Lead from the front Texas Nodal 9 General Requirements Modeling CRRs Requirement IdFR20 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (f); (3); (3) (a); (3) (b) Coverage of SourceFull Description: The CRR System shall model Load Zones and Hubs as a group of one or more electrical buses with distribution factors to weight their contribution on CRR injections and withdrawals. To calculate these factors, the CRR System shall use the following assumptions:  Resource Nodes: the injections and withdrawals shall be fully assigned to a Resource Node.  Load zones: the injections and withdrawals shall be distributed among the electrical buses proportionally to the loads from the zone.  Hubs: the injections and withdrawals shall be equally distributed among all electrical buses in the hub.

Lead from the front Texas Nodal 10 General Requirements Additional areas of interest Timing of posting to the MIS will be as identified in the protocols and will be configurable within the CRR System. Time of use blocks will be configurable; meaning that the hours and descriptions can be adapted in the future.

Lead from the front Texas Nodal 11 Auction Requirements Bidding in the Auction Requirement IdFR21 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (5) (b) (ii) Coverage of SourceFull Description: The CRR System shall enable the CRR Market Operator to divide sources and sinks into the following four categories: Non-biddable Biddable as part of PTP Obligation only Biddable as part of PTP Option only Biddable as part of PTP Obligation and PTP Option. Assumption: Initially this configuration shall only allow for obligations to be sold for the first month of the annual auction (January). If the ERCOT Board allows shall be sold for multiple month strips. Note: The ERCOT CRR team recommends an NPRR to clarify this section of the protocols to validate this assumption. NPRR language to follow.

Lead from the front Texas Nodal 12 Auction Requirements Optimizing the Auction Requirement IdFR23 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (1) (e) Coverage of SourcePartial Description: The CRR System shall optimize annual auction revenues across the entire auction. Note: This entire requirement is based on the August 2006 protocol revision and is still pending Nodal change control approval.

Lead from the front Texas Nodal 13 Auction Requirements Optimizing the Auction Requirement IdFR33 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) 7.3 (7); (1); (4); (5) (a); (5) (b) (i); (5) (b) (ii); (5) (b) (iii) Coverage of SourcePartial Description: The CRR System shall enable ERCOT to conduct an annual auction once a year, consisting of two auction runs (one for each year). The CRR System shall enable ERCOT to conduct a monthly auction once a month, consisting of 1 auction run which simultaneously solves at least 3 auction models.

Lead from the front Texas Nodal 14 Auction Requirements Optimizing the Auction Requirement IdFR31 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (2); (1); (2); (1); ; (1) (a); (1) (a) (i); (1) (a) (ii); (1) (a) (iii) Coverage of SourcePartial Description: The CRR System shall ensure that no CRR Account Holder is awarded CRRs with a value that exceeds their auction- wide credit limit. This limit shall be calculated as the minimum of the ERCOT determined credit limit and the self-imposed credit limit (if specified by the CRR Account Holder). The calculation shall account for the sum of all transactions evaluated as all awarded CRR Auction Bids multiplied by the absolute value of the corresponding bid price; plus all awarded CRR Auction Offers with negative offer prices multiplied by the absolute value of their corresponding offer price; plus the additional credit requirements for all awarded PTP obligations.

Lead from the front Texas Nodal 15 Allocation Requirements Allocation Process Requirement IdFR37 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (c) (i); (c) (ii); (c) (iii) Coverage of SourcePartial Description: For stage 1 of the allocation process the CRR System shall split allocated CRRs according to CRR Market Operator defined percentages. These CRRs shall then be release to CRR Account Holders according to a CRR Market Operator defined time-line.

Lead from the front Texas Nodal 16 Allocation Requirements Allocation Process Requirement IdFR46 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) (h) (i) (A); (h) (i) (B); (h) (i) (C); (h) (ii) (A); (h) (ii) (B); (h) (ii) (C) Coverage of SourcePartial PCRRs allocations shall be one of ten types: Option –Nuclear, coal, lignite or combined-cycle resources –Gas steam resources capacity –Gas steam resources refund –Hydro, Wind, Simple Cycle or other resources not included in the entitlement list capacity –Hydro, Wind, Simple Cycle or other resources not included in the entitlement list refund Obligation –Nuclear, coal, lignite or combined-cycle resources –Gas steam resources capacity –Gas steam resources refund –Hydro, Wind, Simple Cycle or other resources not included in the entitlement list capacity –Hydro, Wind, Simple Cycle or other resources not included in the entitlement list refund The price, expressed as a percentage of the applicable CRR auction clearing price, associated with each type of PCRR shall be configurable by the CRR Market Operator to meet market Protocols. Negative clearing prices shall have a separately configurable percentage.

Lead from the front Texas Nodal 17 Bilateral Market Requirements Bilateral Process Requirement IdFR40 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) 7.1 (2) (d); (i); (1) (f); 7.8 (1); 7.8 (5) Coverage of SourcePartial Description: The CRR System shall provide a Bilateral Market system to allow eligible CRR Account Holder to buy and sell non-expired tradable CRRs and, report change of ownership from bilateral transactions outside of ERCOT system. The CRR System shall only allow transactions for CRRs including the next day until before the cut-off time. The cut-off time parameter shall be configurable by the CRR Market Operator to meet market Protocols.* PCRRs shall only be bilaterally traded through the ERCOT system after the completion of the CRR auction that determined their value. MCFRIs shall be permitted to be bilaterally traded through the ERCOT system prior to the completion of the CRR auction immediately subsequent to its allocation. *Note: This requirement is based on the August 2006 protocol revision and is still pending Nodal change control approval.

Lead from the front Texas Nodal 18 Bilateral Market Requirements Allocation Process Requirement IdFR42 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) 7.1 (2) (d); 7.8 (4) Coverage of SourcePartial Description: The CRR System shall check that the credit impact of a bilateral trade to both parties involved is acceptable to the ERCOT credit requirements. This shall include the impact of buying an obligation as well as selling an option or a positively valued obligation. The transaction shall be put in a pending status until all credit checks are complete. Note: Credit check requirement for bilateral trading is an outstanding question to Credit regarding Credit System capability

Lead from the front Texas Nodal 19 Bilateral Market Requirements Additional areas of interest Bilateral Trading of not less than one-day (by time of use) granularity If a day(s) is bilaterally traded, then the month may not be offered into subsequent monthly or annual auctions.

Lead from the front Texas Nodal 20 Supplementary Requirements The monthly auction optimization must complete within 80 hours The CRR System must be capable of accepting 30,000 bids per auction The CRR System shall be available at minimum 24/7 during auction bidding/offering and optimization and 0600 to 2000 during all other business days The CRR System will create a 23 hour day for Spring Daylight Savings Time and a 25 hour day for Fall Daylight Savings Time

Lead from the front Texas Nodal 21 Conceptual System Design Selected Nexant iHedge Solution Web-based, integrated tool Driven by Calculation Subsystem Built on Database Subsystem and Data Interface Subsystem Interacts with users through Market User Interface (MUI) and Market Operator Interface (MUI) Interface with other systems will depend on program architecture design but the vendor will provide the CRR System ‘end points’

Lead from the front Texas Nodal 22 Conceptual System Design

Lead from the front Texas Nodal 23 Conceptual System Design Key Assumptions 24-hour blocks will be managed as 3 separate time of use blocks Smallest granularity of bilateral markets will be the time of use per day Auction-wide credit limits will be imposed MW will be expressed in tenths (0.1 MW) The network model used for the CRR System will be a PSS/E data base in RAWD format –Modeling activity will consider contingencies, outages, non-thermal constraints ERCOT will use an integration layer bus wherever possible but will have point to point interfaces as a fallback The system will be able to function with the following maximum dimensions: Buses 7,500; Branches 10,000; Contingencies 2000; Sources and Sinks 2000; PTP bids and offers 30,000; Flowgates 40