MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

20/01/09 OPERA general meeting Nagoya CNGS report.
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Safety Consolidation in and around the Injector chain* S Baird On behalf of R Brown, V Chohan, J-L Duran-Lopez, B Linseisen, R Steerenberg, F Szonsco (for.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
PS losses during CT extraction, a history about 30 year long... J. Barranco, S. Gilardoni CERN - AB/ABP.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Imperial College London 1 6. Injection into and ejection from circular machines PREACCELERATOR ACCUMULATORRING PARTICLESOURCE INJECTION 1 EJECTION INJECTION.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
1 Radiation Monitoring at CTF3 CTF3 Buildings – weak spots Radiation Monitoring system Monitoring results – First Lessons Idelette Floret, Thomas Otto,
MG - IEFC Workshop MTE status and outlook for 2012 M. Giovannozzi Introduction Recap of 2011 activities Activities before LS1 Milestones Acknowledgements:
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Septum 16 shielding increase: result of phase 2 of “Avant projet” S. Gilardoni (BE/ABP) In collaboration with S. Roesler, D. Forkel-Wirth, S. Damjanovic,
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
21 July 2006, Vancouver Global Design Effort 1 PPS - division into zones and shield wall locations - N. Terunuma KEK.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
The Survey of the Power Supply Reliability at SSRF
Summaries and conclusions of the MTE Workshop
contribution to the round table discussion
ELENA installation and commissioning status
(Beam) Impact of MTE on the PS septa
Plans for ions in the injector complex D
Beam Loss and Radiation Working Group: Conclusions
Radiation protection of Linac4 M. Silari Radiation Protection Group
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
Michael Benedikt AB/OP
Multi-Turn Extraction for PS2 Preliminary considerations
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
ABP/RTL Main RTL Activities for 2007/8:-
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements: G. Arduini, N. Chohan, M. Lazzaroni, M. Poehler, Transport services

MTE losses at extraction 2MG - IEFC meeting 22/01/2010 Losses at extraction, about 2-3% of circulating beam, concentrated in 2 points. Losses at septum 16 due to kicker rise time (~ 350 ns) and the longitudinal structure required by the SPS (de-bunched beam). Issue anticipated in the MTE Design Report. HW solution: design a thinner septum.

MG - IEFC meeting 22/01/20103 Linac3 issue Due to the (weak) existing shielding, the dose in the Linac3 tunnel would exceed the current area classification during MTE operation with 0.85×10 13 p/s (typical CNGS operation). This results is based on a series of measurements performed on November The dose will be about 13  Sv/h using MTE, whereas the limit is 10  Sv/h. With the CNGS based on the CT extraction it was measured about 4  Sv/h. NB: access to the Linac3 is required for continuous tuning of the Lead source and in particular during the next run for the commissioning of the new source

4MG - IEFC meeting 22/01/2010 The area TT2 Linac3 PS SMH16 LEIR

5MG - IEFC meeting 22/01/2010

Existing radiation monitors 6MG - IEFC meeting 22/01/2010

Shielding foreseen during LEAR construction 7MG - IEFC meeting 22/01/2010 During LEAR construction, to accommodate injection/extraction line about 2 m of earth shielding removed. Reinforcement of remaining shielding proposed but not realised.

PS Septum 16 zone 8MG - IEFC meeting 22/01/2010

LEIR injection/extraction tunnel 9MG - IEFC meeting 22/01/2010

Possible solutions for this year Install shielding wall in the LEIR injection/extraction tunnel Presence of small service tunnel for water at ceiling level. Tunnel cannot be shielded, shielding efficiency of the wall reduced. Gallery passage reduced. Impossible to change a magnet in case of failure without removing the shielding (about 10 days). Cables on cable tray near the ceiling are already reaching a high temperature: a shielding wall will prevent air circulation. No impact on PS tunnel infrastructure. Install wall shielding in the PS nearby the zone of the septum 16 Heavy charge on the floor: impact on structural stability to be verified. No impact on repairing activities in the area (septum 16, QFO105). High shielding efficiency. 10MG - IEFC meeting 22/01/2010

Details of the installation 11MG - IEFC meeting 22/01/2010 Wall about 11 m long parallel to the existing tunnel wall. Thickness 80 cm. Material either Iron or Concrete.

Fluka simulations to estimate wall shielding efficiency 12MG - IEFC meeting 22/01/2010

Possible wall material for this year Iron wall (weight ~ 150 t, 11 m long, 80 cm thick, 2.4 m height) Predicted dose reduction factor 20 (needed < 2) No time for installation (painting required plus 3-4 days installation) with current accelerator schedule Less ALARA, i.e. more dose to transport during installation/eventual removal for interventions in the zone Concrete wall (weight ~ 50 t, 11 m long, 80 cm thick, 2.4 m height) Predicted dose reduction factor 4-5 (needed < 2) Compatible with current accelerator schedule Faster installation/removal Material available Both walls are compatible with the available floor space and floor strength after the reinforcement of the small pillars under the floor and the exchange of concrete floor plates with iron plates -> activities already ongoing 13MG - IEFC meeting 22/01/2010

Wall implementation 14MG - IEFC meeting 22/01/2010

Conclusions Linac3 radiation levels turned out to increase due to the MTE losses concentrated at the septum 16. During CNGS operation with exclusively CT extraction larger doses than past years observed. The problem was generated by the choice of not consolidating the shielding between the PS and the LEAR injection/extraction line during the LEAR construction. A concrete wall will be installed before the restart of the machine as compensatory measure. In case the shielding would turn out to be not sufficient for reasons unknown at the moment, CNGS could be delivered during the day (work ongoing in Linac3) with CT extraction, and during the night with MTE. The installation of the wall should be considered as a temporary solution. The current run should be used to look for a better one, for example: Revise the current installation of the Linac3 equipments (radiation mapping of the Linac3 area needed -> detailed measurements to be performed this year) Install shielding on the Linac3 side (if possible) Change the extraction septum (longer time scale) … etc… Hopefully the use of MTE in normal operation should also bring a better extraction efficiency thanks to optimisation. 15MG - IEFC meeting 22/01/2010