HLab meeting 2/17/09 K. Shirotori. Contents Noise reduction for CYRIC experiment.

Slides:



Advertisements
Similar presentations
attract circuit When two objects are pulled together.
Advertisements

attract When two objects are pulled together circuit.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
High Quality Audio Design VSX-1016TXV - Direct Energy Power Engine - High Quality D/A Converter - Direct Construction.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
1 A proposal of new simple system for testing a large number of MPPC for the R&D phase of GLD calorimeter 2007/Feb/6 ACFA ILC Workshop ICEPP, University.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Vex 1.0 © 2006 Carnegie Mellon Robotics Academy Inc. Test Bed Assembly.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
J-PARC でのハイパー核ガンマ線分 光実験に向けた Hyperball-J の建設状 況 東北大理、 KEK 、 セイコー EG&G 、 富士電機システム ズ 白鳥昂太郎、 田村裕和、 小野浩、 笠見勝裕、 小池武志、 竹内孝行、 千賀信幸、 春山富義、 保川幸雄 and the Hyperball-J.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Electromagnetic shielding of the SQUID in the nEDM Experiment: Bolts and Nuts Andrei Matlashov, Michelle Espy, LANL, P What happens when SQUID is.
J-PARC での YN 相互作用の研究 東北大学理学研究科 三輪浩司. Contents Physics background YN interaction Scattering experiment, spectroscopy Past experiments of YN scattering.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
SksMinus status SKS meeting 2008/1/18 白鳥昂太郎. SksMinus setup SksMinus  STOF : Time-of-flight  SAC & BAC: K - beam veto and  - ID (n=1.03)  SDC1~4 :
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
HD target.
Measurement of Ge detector by New cooling KEK Apr 25 th K.Shirotori.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Electricity.
MPPC update including plastic connector T2K experiment collaboration meeting 2007/4/18 (Wed) S.Gomi T.Nakaya M.Yokoyama ( Kyoto University ) T.Nakadaira.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
Measurement of Ge detector by New cooling system KEK May 30 th K.Shirotori.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
Grounding.
Fumihiko Ukegawa University of Tsukuba, Japan 6th Joint Korea-Japan ScEcal Meeting September 3, 2010 Kobe University Photo-sensor studies.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Testing of Low Voltage Installations
MPPC Test Setup Alam Toro S. 1. Objective Characterize main variables in ideal conditions To provide a setup to characterize multiple devices To provide.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
PPAC in ZDC for Trigger and Luminosity Edwin Norbeck University of Iowa Luminosity Workshop November 5, 2004.
ILC meeting 5/14 A large amount of measurement concerning fundamental property of MPPC 光検出器 MPPC の 基礎特性に関する大量測定 University of tsukuba M2 Hiroko koike 1.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Electrostatic deflector development at RWTH Aachen
Grounding.
Calorimeter Mu2e Development electronics Front-end Review
Upgrade of the scintillator testing station in Prague
RD51-WG X June test beam experience: useful information for October
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Parity Violation Experiments at JLEIC
Particle Detection System for MERIT
BESIII EMC electronics
R&D of MPPC for T2K experiment
Trigger issues for the CALICE beam test
RPC Front End Electronics
SksMinus status 04 HB meeting 2008/5/09 白鳥昂太郎.
Particle Detection System for MERIT
Presentation transcript:

HLab meeting 2/17/09 K. Shirotori

Contents Noise reduction for CYRIC experiment

Purpose To measure polarization of proton (Scifi-MPPC システムを用いた陽子陽子散乱断面積測定と左右非対称度の測定 ) –p+ 12 C → 12 C+p pol ⇒ p pol + 12 C→ 12 C+p scat ⇒ p scat measured ⇒ LS force effect Test MPPC + Scifi active target Study for us (staff, students)

Necessary to noise reduction MPPC gain is small : ~10 5 –Planned to use PMT amplifier ⇒ The noise is enhanced by PMT amp, too. –Difficulty of one photon separation from pedestal –Energy resolution –Common noise ⇒ Accidental trigger, Gomi data Weak point of detector system –Ground of bias circuit –Protection of electromagnetic wave No cover of bias circuit Flat cable between bias circuit and MPPC –Hand made…?

Basic concept Ground : Same ground level –Detectors, crates, electric circuit, HV Clear cabling –As simple as possible (beautiful cabling) Insulation –No ground loop Shield for weak points –Al foil method for flat cables

Environment at TR4 Noise source : Cyclotron magnet, RF, beam line magnet, vacuum pump, compressor, electric power supply… ⇒ Cannot be removed. *~20 kHz switching noise from cyclotron magnet +  All system (detector, electronics, cables) in Target room4 ⇒ To connect all ground to be same by ground ribbon *Ground loop Need to connect beam pipe (target vacuum chamber) to electronics –AC100V between beam pipe and electronics (floating ground) ⇒ Beam pipe to be ground or other common ground *Nose from Cyclotron Ground of electronics power supply is unknown. ⇒ Not used *Not used for Hyperball2 experiment (Ground loop or some noise appeared and switching noise ~20kHz) Ground rod in target room4 is connected to the beam pipe. ⇒ Not used *Not effective reduction for Hyperball2 situation and risk of ground loop

Target room4

Beam pipe Shield Vacuum chamber Beam from Cyclotrons Frame (isolated from floor) Bias circuit (Yaki-niku, Kameki-sushi) Detector (Scifi, MPPC) AC100V DAQ PC NIM VME Distribution board Turbo pump Unknown : Distribution board ground, beam line ground, beam line power supply, any untouchable device Hole

Bias circuit ▼ 1 M  ▼ ▼ 0.1  F MPPC Bias HV PMT amp

Set up principle Connect beam pipe to electronics –Shut out the risk of AC100V (Ground rod in target room4 is connected to the beam pipe) –Ground of electronics power supply is unknown. ⇒ Not used Connect between bias circuit and NIM&VME circuit by ground ribbon Carefully check the insulation (ground loop by lemo i-connector) Try and error around bias circuit (flat cable shielding, to connect beam line and lemo- connector by ground ribbon)

Set up NIM VME Frame Vacuum chamber Beam line AC100V Cable (lemo) Cable (flat) Floor Ground Upstream of beam line Connected Disconnected ?? Electronics ⇒ Frame ground by ground ribbon

Target room4 Beam pipe Shield Vacuum chamber Beam from Cyclotrons Frame (isolated from floor) Bias circuit (Yakiniku, Kameki-sushi) Detector (Scifi, MPPC) AC100V DAQ PC NIM VME Distribution board Cable (lemo) Cable (flat) Turbo pump Tako-ashi Unknown : Distribution board ground, beam line ground, beam line power supply, unknown device Hole

Ground of bias circuit ▼ 1 M  ▼ ▼ 0.1  F MPPC Bias HV PMT amp Lemo Common ground ⇒ Beam line Lemo Frame Flat cable (covered Al foil) Ground ribbon Ground ribbon

Ground of bias circuit ▼ 1 M  ▼ ▼ 0.1  F MPPC Bias HV PMT amp Lemo Common ground ⇒ Beam line Lemo Frame Flat cable (covered Al foil) Ground ribbon Ground ribbon

Noise reduced Noise : 20 kHz (switching) +  (maybe ground loop) One photon (after PMT map) : ~3 mV Noise : 20 mV ⇒ 1~2 mV (~2 Ge room) 理由 強固なグラウンド : 同相成分の除去 Cabling : No ground loop アルミ作戦 : ケーブルの遮蔽とグラウンド 強化 Sample of noise (almost reduced) To be continued ….

圧縮 BeforeAfter