Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.

Slides:



Advertisements
Similar presentations
Update on Status of Tier-1 GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Advertisements

Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
DOSAR Workshop VI April 17, 2008 Louisiana Tech Site Report Michael Bryant Louisiana Tech University.
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
20 Sept Kunsu Oh*, Jonghu Lee** *Dept. of Physics Pusan National Univ., **KISTI GSDC.
Tier 2 Prague Institute of Physics AS CR Status and Outlook J. Chudoba, M. Elias, L. Fiala, J. Horky, T. Kouba, J. Kundrat, M. Lokajicek, J. Svec, P. Tylka.
Ian M. Fisk Fermilab February 23, Global Schedule External Items ➨ gLite 3.0 is released for pre-production in mid-April ➨ gLite 3.0 is rolled onto.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
RAL Site Report HEPiX Fall 2013, Ann Arbor, MI 28 Oct – 1 Nov Martin Bly, STFC-RAL.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Ali Zahir Site Admin / Faculty Member ALICE T1/2 March.
ALICE data access WLCG data WG revival 4 October 2013.
José M. Hernández CIEMAT Grid Computing in the Experiment at LHC Jornada de usuarios de Infraestructuras Grid January 2012, CIEMAT, Madrid.
Preparation of KIPT (Kharkov) computing facilities for CMS data analysis L. Levchuk Kharkov Institute of Physics and Technology (KIPT), Kharkov, Ukraine.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
11 ALICE Computing Activities in Korea Beob Kyun Kim e-Science Division, KISTI
Computing Infrastructure Status. LHCb Computing Status LHCb LHCC mini-review, February The LHCb Computing Model: a reminder m Simulation is using.
November 16, 2012 Seo-Young Noh Haengjin Jang {rsyoung, Status Updates on STAR Computing at KISTI.
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.
1 1APCTP LHC Konkuk University. Introduction to GSDC Project Activities in 2009 Strategies and Plans in 2010 GSDC office opening ceremony CERN.
Sejong STATUS Chang Yeong CHOI CERN, ALICE LHC Computing Grid Tier-2 Workshop in Asia, 1 th December 2006.
Grid Lab About the need of 3 Tier storage 5/22/121CHEP 2012, The need of 3 Tier storage Dmitri Ozerov Patrick Fuhrmann CHEP 2012, NYC, May 22, 2012 Grid.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Dr. Saif-ur-Rehman Muhammad Waqar Asia Tier Center Forum.
KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.
KISTI-GSDC SITE REPORT Asia Tier Center KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan,
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Status of the Bologna Computing Farm and GRID related activities Vincenzo M. Vagnoni Thursday, 7 March 2002.
Status of India CMS Grid Computing Facility (T2-IN-TIFR) Rajesh Babu Muda TIFR, Mumbai On behalf of IndiaCMS T2 Team July 28, 20111Status of India CMS.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
Doug Benjamin Duke University. 2 ESD/AOD, D 1 PD, D 2 PD - POOL based D 3 PD - flat ntuple Contents defined by physics group(s) - made in official production.
STATUS OF KISTI TIER1 Sang-Un Ahn On behalf of the GSDC Tier1 Team WLCG Management Board 18 November 2014.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
Data transfers and storage Kilian Schwarz GSI. GSI – current storage capacities vobox LCG RB/CE GSI batchfarm: ALICE cluster (67 nodes/480 cores for batch.
Development of a Tier-1 computing cluster at National Research Centre 'Kurchatov Institute' Igor Tkachenko on behalf of the NRC-KI Tier-1 team National.
BNL dCache Status and Plan CHEP07: September 2-7, 2007 Zhenping (Jane) Liu for the BNL RACF Storage Group.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
KISTI activities and plans Global experiment Science Data hub Center Jin Kim LHCOPN-ONE Workshop in Taipei1.
Global Science experimental Data hub Center April 25, 2016 Seo-Young Noh Status Report on KISTI’s Computing Activities.
UK Status and Plans Catalin Condurache – STFC RAL ALICE Tier-1/Tier-2 Workshop University of Torino, February 2015.
Pledged and delivered resources to ALICE Grid computing in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Report from US ALICE Yves Schutz WLCG 24/01/2007.
GSDC: A Unique Data Center in Korea for Fundamental Research Global Science experimental Data hub Center Korea Institute of Science and Technology Information.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Ian Bird WLCG Workshop San Francisco, 8th October 2016
LCG Service Challenge: Planning and Milestones
October 28, 2013 at 14th CERN-Korea Committee, Geneva
Kolkata Status and Plan
Update on Plan for KISTI-GSDC
KISTI-GSDC Tier-1 SITE REPORT
Luca dell’Agnello INFN-CNAF
RDIG for ALICE today and in future
Update from the HEPiX IPv6 WG
Project Status Report Computing Resource Review Board Ian Bird
Simulation use cases for T2 in ALICE
IPv6 update Duncan Rand Imperial College London
Presentation transcript:

Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea Committee Meeting

Current Status – Resource: Nodes, Services and TAPE – Operation – Network Plan – Next Milestones – Pledges – Network upgrades Conclusion KISTI-GSDC/ Outline

GSDC Tier-1 Team KISTI-GSDC/ ROLEName Representative Haeng Jin Jang System Administration Heejun Yoon Seunghee Lee Gianni Mario Ricciardi Storage: Disk & Tape Heejun Yoon Sang-Oh Park(*) Network Hyeongwoo Park KISTI support Power supply & Colling KISTI support Grid Middleware Il-Yeon Yeo Sang-Un Ahn(*) KiAF support & Production Sang-Un Ahn Sul-Ah Ahn (*) New member from 1 st June 2012

Activities In March, approved as a Tier-1 candidate for ALICE by WLCG Overview Board and acquired full membership for ALICE at ALICE Collaboration Board In June, the first demonstration plan for Tier-1 submitted to WLCG Management Board – The first one revised, then the second version has been prepared reflecting the comments by WLCG and our recent progress In August, agreement on the collaboration with KIT (DE) especially for TAPE library: set-up and test KISTI-GSDC/

Resources: Nodes & Services CPUs – Intel Xeon 12 physical cores -> 24 logical cores w/ HT per Worker Nodes (WN) – Total ~1500 cores (~17k HepSpec06) dedicated to Tier-1: 62 WNs – Capable to run ~1500 jobs (1 job per 1 logical core) Disks – 1000 TB disks: Hitachi + EMC 2 Services w/ gLite 3.2 middleware in production – EMI migration in progress (plan to be submitted to WLCG GDB) – 2 CEs, Top|site BDII, VOBOX, XROOTD (1 redirector and 9 pools) KISTI-GSDC/ Storage Element MonALISA

Resources: TAPE TAPE library pre-test (File System + (un-)staging + XROOTD) completed – IBM test (Mar. 2012): GPFS+TSM+XROOTD – ORACLE test (Aug. 2012): QFS+SAM+XROOTD For cache (allows prompt access to archived data), additional disk pool (as a buffer) is required – Min. 200 TB; max. 400 TB for pA data delivered in coming Jan. - Feb. IBM TAPE library will be delivered: installation and functioning test will be complete by the end of November – 1PB media capacity (extendable up to 3 PB) – Minimum 1.92 GB/s throughput (tape drive: 240 MB/s) – Dual robot arms – 3 years maintenance support + recovery services within 24hrs KISTI-GSDC/

Operation KISTI-GSDC/ On service for ALICE as WLCG Tier-1 candidate since March in 2012 – Test-bed from October in 2010 – Capable to run ~1500 jobs, >7000 jobs done everyday – Up to now, total 820k jobs performed successfully – Site Availability/Reliability reported monthly by WLCG MB since Aug March – October in 2012 Internal network issue solved 1, ,000 # of Jobs Maintenance Active jobs Done jobs

Network to LHCOPN KISTI-GSDC/ Gbps connection is required to join LHC OPN (Optical Private Network) among Tier-0 (CERN) and other Tier-1s

Network Traffic Status KISTI-GSDC/ Start of torrent-based ALICE package distribution service: Observed large incoming traffic (maximal 5 minutes) after Dedicated 1Gbps established GLORIAD-KR – CERN – ‘Yearly’ graph (1 Day Average) – Correlation with # of active jobs Incoming Traffic in bps Outgoing Traffic in bps Maximal 5 minutes Incoming Traffic Maximal 5 minutes Outgoing Traffic Functional test Internal network issue solved

Next Milestones KISTI-GSDC/ TAPE library set-up and data transfer test (to be ready before pA): collab. with KIT (DE) 2.Complete 24 hours on-call service plan: shift scheme and notification (SMS, , etc.) 3.Tier-1 service stability test: demonstration at least 2 months(>90%) 4.Upgrading network bandwidth up to 10Gbps in order to join LHCOPN: first, 2Gbps by 2013

Pledged Pledged resources – Based on WLCG & ALICE Collaboration MoU – Provides 2000 cores for Tier-1, 2PB for TAPE by 2014 – Meeting ALICE requirement by 2013 KISTI-GSDC/ Current (ALICE Req.) Pledged CPUs 1,500 (2,000) 1,5002,000 Disk (TB) 1,000 (1,000) 1,000 Tape (TB) - (1,500) 7001,5002,000

Network Upgrade KISTI-GSDC/ In 2013, dedicated 2Gbps (current 1Gbps) established between KISTI-CERN Plan to upgrade to 10Gbps connection in a few years

Conclusion Demonstration of WLCG Tier-1 for ALICE is going well according to plan: – ALICE collaboration appreciated its progress of KISTI-GSDC as WLCG Tier-1 candidate (ALICE collaboration board in 12 th Oct. 2012) For pA data, it is crucial that TAPE library has to be fully functioning by the end of this year Precise plan for upgrading network >3Gbps is mandatory to be integrated into LHCOPN KISTI-GSDC/

KISTI-GSDC/ Thank you 14