Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
1 Shams Siddiqi, Ph.D. Representing LCRA and Rates and Resources Council (RRC) consisting of 31 NOIEs serving Central Texas TAC.
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
West to North CSC Location Scenario 3b WMS August 20, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
Unit-Specific Bid Limits based on Modified Generic Cost.
1 TAC Report to the ERCOT Board February 21, 2006.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
1 TAC Report to the ERCOT Board February 16, 2005.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
Criteria for Economic Transmission Additions Bill Bojorquez May 4, 2006.
Long Term Study Transmission Results May 21 st, 2013.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 TAC Report to the ERCOT Board November 14, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
Modeled Load Levels in the Valley
TAC Report to the ERCOT Board
TAC Report to the ERCOT Board
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Warren Lasher Manager, Long-Term Planning and Policy
New England Resource Adequacy
Presentation transcript:

Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011

Question 2 Assignment: Consider questions related to market design and possible levers to tune economic calculations: 1 A.Should the Consumer Benefit metric even be used? What will lead to the right balance of resolving congestion through transmission build vs. generation build, given the energy only market design? Where should the risk reside? Should there be dependence on a market solution, rather than having the certain cost of building transmission? What method ensures long-term viability of the market (generation and transmission co-exist) and the consumer is cost effective served? How do we calculate the quantity of benefit? (discount rate, should there be one, and should it apply to Societal Benefit, Consumer Benefit, or both?) How certain are transmission cost estimates? How certain are transmission congestion studies? How does the use of SPSs and RAPs fit in, or do they? Note: items shown in orange are reserved for a later discussion by ERCOT staff and/or TDSPs.

A) Use of the Consumer Benefit metric 2 The use of the Consumer Benefit metric for economic transmission planning decisions is a concept that has always been foundational in ERCOT, given that wires cost are paid for on a ‘load ratio share’ basis by all loads in ERCOT The concept of minimizing delivered cost of power to loads (i.e. Consumer Benefit) metric has been in use since the inception of the Economic Transmission Planning at ERCOT as seen in the statement below from the first ERCOT Power System Planning Charter and Processes document that was approved at the October 9, 2003 TAC meeting: …These components contribute to local congestion costs currently “uplifted” or socialized, in a similar manner to wires charges, and therefore fall into the desired optimization mix necessary to minimize energy delivery costs… At the May 4, 2006 TAC meeting the transmission expansion benefit metric was expanded to include Societal Benefit as the primary metric with the Consumer Benefit metric as the backstop 1 : Reject Project NPV of SS > NPV of TCOS NPV of CS > NPV of TCOS Quantify SS & CS over life of project RPG Recommend Project Approval Yes No Yes 1) Note that for purposes of economic evaluations, an indication of the NPVs of Societal and/or Consumer Surplus will be used and based on the best estimates available using planning judgment from the transmission cases available.

B) & C) Finding the right balance: Trans vs. Gen 3 While it is always a good idea to consider the potential for pending generation siting to resolve congestion, and factor this into the project approval process, it should not become a barrier to consumers (via the Consumer Benefit metric) utilizing transmission build to lower their delivered cost of load into growing load centers It is desirable to find an economically optimal balance between transmission expansion to cover localized load growth vs. generation siting In practice, the desire to find this optimal balance is often complicated by a myriad of externalities, such as: Permitting constraints associated with emissions considerations near major load centers A specific load center experiencing import constraints may benefit from new generation siting locally; however, there is already plenty of generation in the market located outside the load center When ERCOT completed its independent review of the Houston Import study in August 2010, they performed a number of sensitivity studies, One of these sensitivities aimed to determine if pending generation additions in Houston would better resolve the congestion problem Ultimately, the Houston gas plant expansion scenario was not found to be an effective substitute to transmission build from the Consumer Surplus metric perspective

D) Can transmission build into load centers actually drive more generation out of the market, increasing cost to load? 4 To appropriately answer the question about transmission build into load centers leading to less efficient generation exiting the market, will require an examination of market impacts on both sides of the constraint in order to understand the net effect. During the August 2010, TAC / Board review and subsequent endorsement of the Fayetteville-Zenith 345 kV project to increase import capability into Houston (utilizing the Consumer Benefit metric) Concern was expressed by some market participants that this may lead to more of the less economically efficient generation in Houston being mothballed or retired This is a logical question, given that market clearing prices in Houston (relative to the rest of ERCOT) will be reduced by the new 345 kV import path However, the converse is also true, in that prices outside Houston will no longer be unnecessarily depressed associated with the ongoing congestion into Houston There is significant historical evidence that the severity of congestion into the Houston zone and South zone in 2008 and 2009, depressed North and West zone prices relative to Houston and South Potentially contributing to more mothballing and/or retirements there

D) Can transmission build into load centers actually drive more generation out of the market, increasing cost to load? 5 During the time period of ’09 and ’10, there were approximately 7,381 MW of generation that Suspended Operation. Likely, related to the expectation of continued N-H and N-S congestion, over 80% of this capacity (6,019 MW) exit was located in the North and West zones. Thus, it is important to consider generation impacts on both sides of the constraint of interest to answer this question. Notes: 1) Permian Basin 5 & 6 were RMRd by ERCOT and were removed from RMR status as of 12/1/ ) Units that had their suspension start after summer peak in a specific year are shown as leaving the market for the following year (i.e. this is a summer specific representation of unavailability)

H) How does the use of SPSs and RAPs fit in? 6 As was discussed on the prior side, it is important to consider the price distorting impacts on both sides of the constraint to properly answer this question. Additionally, why should consumers be subjected to unnecessarily high prices associated with congestion that could easily, inexpensively, and quickly be resolved through the temporary use of SPSs and RAPs? Some market participants have raised the question about whether or not SPSs and RAPs are compatible with the Energy Only Nodal Market design Specifically, they are raising the question of whether or not, their use has the net effect of prematurely eliminating a transmission constraint that some generator is benefiting from and thus may leave the market afterwards The Nodal Operating Guides provide specific guidance on this issue in Section 5.3 (2): The contingency studies will be performed for reasonable variations of Load level, generation schedules, planned transmission line Maintenance Outages, and anticipated power transfers. At a minimum, this should include projected Loads for the upcoming summer and winter seasons and a five-year planning horizon. The TSPs involved should plan to resolve any unacceptable study results through the provision of Transmission Facilities, the temporary alteration of operating procedures (i.e., RAPs), temporary Special Protection Systems (SPSs), or other means as appropriate.