ALEJANDRA MEJIA SEPTEMBER, 2015 Savings To Code Discussion: Repair Indefinitely Rule Sets.

Slides:



Advertisements
Similar presentations
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Advertisements

Summer Projects Patrick Willoughby Maintenance Engineering.
Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
Microsoft Dynamics® SL
Unit I Module 1 - Introduction to RCM
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
From Cutting Red Tape to Maximizing Net Benefits Alexander T. Hunt U.S. Office of Management and Budget Challenges on Cutting Red Tape Rotterdam, The Netherlands.
CPUC EM&V WO54 – Market Assessment & Market Effects Baseline Characterization Market Effects Study of Investor-Owned Utility Residential.
….Repair Indefinitely 1 A New Class of Retrofits:… ACEEE 2010 Summer Study Examples of Candidate Measures for “Existing Baseline” Douglas Mahone Cal Technical.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
California Energy Commission Role of Codes and Standards and Energy Procurement Planning in Determining Baseline Chris Kavalec, Demand Analysis Office.
Energy Efficient Investments ENE Energy Advisors Performance Contracting in New Hampshire March 21, 2015.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 13 Reliability.
NS5 Work Orders How to Create a Work Order for an Unplanned Event.
Overview of Federal Appliance Standards and Their Impact on Regional Loads Tom Eckman Northwest Power and Conservation Council BPA Utility Brown Bag September.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Floating Head Pressure for Refrigeration Single Compressor Systems Michele Friedrich, PE – Sr. Engineer Dustin Bailey – Engineer PECI 11/2/2010.
Software Reliability: The “Physics” of “Failure” SJSU ISE 297 Donald Kerns 7/31/00.
Multi-Family Replacement Window Assumption Request 9/30/2008 RTF Meeting Rich Arneson and Bruce Carter.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Rooftop Package HVAC Operations and Maintenance Measures: David Baylon Stan Price Bob Davis.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Name of Building(s) or Project Speaker(s) Organization(s)
Our School REQUIRES INFRASTRUCTURE IMPROVEMENTS to maintain the working condition of the building. The total cost of the needed work is $2,255,000. We’ve.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Lighting systems HVAC systems Lighting Equipment HVAC Equipment Miscellaneous loads Envelope Energy Conservation Measures (ECMs)
The 2012 IECC A Rare Opportunity for Major Energy Savings Add AIA.
September 30, 2003Conservation Resources Advisonry Committee 1 Commercial Sector Measure Quest Sources & Findings.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Variable Speed Heat Pumps Provisional UES Proposal Presentation to the Regional Technical Forum September 18, 2012 Presentation by Kacie Bedney, Bonneville.
High Efficiency Evaporator Coils for Medium Temperature Cases Dustin Bailey, Engineer PECI Jan 5, 2010.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OZONE-DEPLETING SUBSTANCE PHASEOUT ISSUES TED KOSS
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
ALEJANDRA MEJIA OCTOBER 22, 2015 Savings to Code Subcommittee: Update and Preview of Expected Deliverable.
Chapter 7 Buying Decisions Lesson 7-1 Designing a Buying Plan LEARNING OBJECTIVES: - DISCUSS THE RESULTS OF BEING FINANCIALLY RESPONSIBLE AND FINANCIALLY.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
BellSouth Telecommunications – Performance Measurements District BellSouth Performance Measurements Replacement of Current Reporting with a Single Report.
Session 14 & 15 Lab Exercises. Assessing and working with data in the model – Instructor’s presentation What are the top five areas of focus for applying.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
Credit Recovery and Credit Advancement Presentation By Andy Meadows Education Specialist and Robin Nelson Coordinator Instructional Services.
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
Mastering Inspections in WebTMA Jenny Pino TMA Systems.
….Repair Indefinitely 1 A New Class of Retrofits:… ACEEE 2010 Summer Study A Brief History of EULs in California Douglas Mahone Cal Technical Forum March.
ALEJANDRA MEJIA NOVEMBER 20, 2014 Measure Selection Porocedure.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference ERP Fixed Assets ERP Fixed Assets Presented by: Will Brock ERP Programmer PowerPoint.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
PRELIMINARY DRAFT EXCERPT RECOMMENDATIONS ON MEASUREMENT AND VERIFICATION METHODS IN THE FRAMEWORK OF DIRECTIVE 2006/32/EC ON ENERGY END-USE EFFICIENCY.
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
 Ensure utilities plan for and provide services by which Missouri’s residents and businesses can achieve their goals with less energy over time, with.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
QuickServe Online Service Training
Sean Weber Energy Engineer
SCE “To-Code” Pilot Lessons Learned
Track 2 Working Group 4th Meeting
Track 2 Working Group 2nd Meeting
Track 2 Working Group 4th Meeting
Energy Efficient Investments ENE Energy Advisors Performance Contracting in New Hampshire March 21, 2015.
Ex Ante Review Overview
Position Control Fiscal Year End
الوحدة 20 مهارات التواصل مع الآخرين
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 13 Reliability.
J. Cofala Z. Klimont CIAM/IIASA
Proposed Replacement of 8800PPH Steam Boiler ( )
QuickServe Online Service Training
QuickServe Online Service Training
Iteration – While Loops
Presentation transcript:

ALEJANDRA MEJIA SEPTEMBER, 2015 Savings To Code Discussion: Repair Indefinitely Rule Sets

Current Measure Type Rule Set September 2015 Discussion: Repair Indefinitely Rule Sets 2 No Yes Code Baseline Existing Efficiency Baseline for 1/3 EUL Code Baseline for 2/3 EUL Age > EUL Equipment Failed?

There is an Implementation Problem with the Current Rule Set September 2015 Discussion: Repair Indefinitely Rule Sets 3 No Yes Code Baseline Age > EUL Existing Efficiency Baseline for 1/3 EUL Code Baseline for 2/3 EUL Commission policy is to have no default option—to allow field conditions to dictate measure application type. However, implementation has led to assumed “Yes” answer unless “preponderance of evidence” standards are met.

September 2015 Discussion: Repair Indefinitely Rule Sets 4 However, implementing a Repair Indefinitely measure type goes beyond fixing implementation of current Commission Policy. It adds a completely new option to be implemented correctly…

Proposed Repair Indefinitely “Master Rule Set” September 2015 Discussion: Repair Indefinitely Rule Sets 5 Code Baseline Existing Efficiency Baseline for 1/3 EUL Code Baseline for 2/3 EUL Age > EUL Equipment Failed? Existing Conditions Baseline No Yes No Yes Meet RI Criteria? 1. Not catastrophic failure 2. History of repair 3. Cheaper to repair

Question to be Clarified September 2015 Discussion: Repair Indefinitely Rule Sets 6 What does Repair Indefinitely application mean?  Existing conditions baseline for how long?  The retrofit equipment’s entire EUL?

September 2015 Discussion: Repair Indefinitely Rule Sets 7 Now on to tailoring the “Master Rule Set” to the individual measures we are characterizing…

MF Boilers September 2015 Discussion: Repair Indefinitely Rule Sets 8 1. The failure mode is not catastrophic  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 2. There is a history of rebuild and repair rather than replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 3. It is more economic to rebuild and repair than to replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment?

MF Windows September 2015 Discussion: Repair Indefinitely Rule Sets 9 1. The failure mode is not catastrophic  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 2. There is a history of rebuild and repair rather than replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 3. It is more economic to rebuild and repair than to replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment?

Commercial HVAC September 2015 Discussion: Repair Indefinitely Rule Sets The failure mode is not catastrophic  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 2. There is a history of rebuild and repair rather than replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 3. It is more economic to rebuild and repair than to replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment?

Air Compressors September 2015 Discussion: Repair Indefinitely Rule Sets The failure mode is not catastrophic  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 2. There is a history of rebuild and repair rather than replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment? 3. It is more economic to rebuild and repair than to replace  How can this be established?  Should it be case-by-case or “deemed” for particular equipment?