Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.

Slides:



Advertisements
Similar presentations
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Advertisements

1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Louisiana Safe Routes To School Program
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Southern Corridor Study Recommendations March 16, 2011.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as local roads and streets.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Safety Audit Components Safety assessment for risk Management.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Abstract Bicycle use as a primary means of commuting to work increased 145% (American Community Survey, US Census Bureau) from 1996 to 2006 in Portland,
1 Bicycle and Pedestrian Planning and Design U.S. Department of Transportation Federal Highway Administration FHWA Course on Bicycle and Pedestrian Transportation.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Trail Funding Sources & General Information
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Outdoor Learning Area School Parking School Playground Existing Recreation. Facilities School Parking Neighborhood Tree Buffer Basketball Courts Abandoned.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
STA Safety Project PID #76439 December 12, 2006.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Complete Streets Training Module 4b – Designing for All Users.
MD 30 (Hanover Pike) at Mt. Gilead Road
Roads Operations, Public Works
Interdisciplinary teams Existing or new roadway
Public Information Meeting NW 100th Street Reconstruction Project
Safety Audit Components
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Presentation transcript:

Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015

2010 Comprehensive Plan MISSION: The City of Lakeland will provide cost effective and efficient public services focusing on maintaining and enhancing business, cultural, recreational, and environmental qualities of the environment. Goal #10: “To assure safe traffic circulation in the City of Lakeland with well maintained streets that are multi-modal (for walking, biking, and driving).” Source: 2010 City of Lakeland Comprehensive Plan

Problem Statement How can the City of Lakeland support pedestrian and vehicular traffic in a safe manner? Typical Concepts: 1. Widen the road to include paved shoulders. 2. Construct a separate sidewalk along the road.

Quality Avenue Data Quality Avenue is a primary street directly serving over 195 households. Minnesota DOT classifies Quality Avenue as a “Local” roadway and rural character. Road width is 22’ – 24’. Speed limit is 30 mph. Does not have curb and gutter. Storm water is conveyed via roadside ditches or onto the road itself. Utilities are buried along the road. (Voice/Data, water, sewer, electric, natural gas).

Vehicles and Pedestrians

Road and R.O.W. Features

Quality Avenue

Concept 1: Widen the road to include paved shoulders. Design a 4’ shoulder on each side of the street. MNDOT study found that this reduces accidents by 29%. Source: Minnesota’s Best Practices for Pedestrian/Bicycle Safety Report, Storm water devices could be designed and constructed as the same time. (Part of the long range goal for the City of Lakeland). Road striping will be required. All residents using this street would be affected. (R.O.W., driveways, buried utilities, trees, intersections, signage, and street lighting).

Concept 2: Construct a single, separate sidewalk. Minimum 5’ width. (Federal Highway Administration and Institute of Transportation Engineers). May fit within the 30’ Right of Way. Challenges with ditches, trees, and personal property features. Design could adjust to terrain features (natural or manmade). One side of the road or both sides? Will there be a need for lighting the walks? ADA requirements to include in design.

Recommendations 1. Create a working Task Force. a) City of Lakeland employees and residents. b) MN DOT and private engineering firm. 2. More Data Gathering and Action Items. a) Community surveys or open forums to identify concerns. b) Log traffic speeds and traffic counts. c) Field survey Quality Avenue (utilities, culvert lines, ROW, topography, driveways) d) Develop cost estimates in packaged plans. e) Does the City of Lakeland qualify for State and Federal Grants?

Timeline Assessment, Programming, Planning, and Approvals 2 – 3 years. Budget Identification within Public Works 1 – 3 years Design, Bidding, and Construction 1 – 2 years Total Time Commitment: 4 – 8 years.

Acknowledgements Mr. Matt Kline, Dir. Of Public Works, City of Lakeland. Mr. Mark Nagel, Gov’t Affairs Consultant. Dr. Craig Waldron, School of Business, Hamline University.