Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.

Slides:



Advertisements
Similar presentations
Server Technology Confidential Page 1, June 22,2009 Server Technology Global Services.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Chapter 15: Packaged Software and Enterprise Resource Planning
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
The Software Quality Star: A conceptual model for the software quality curriculum Ronan Fitzpatrick School of Computing, Dublin Institute of Technology,
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
The Waterfall Model A Case Study
IT Workforce: A Global Perspective Dr. Muhammad Shafique Member Subcommittee on Human Resource Development.
WHS Management Plans.
David Warne Independent Manufacturing Consultant.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
NIMS and ICS Animal Disease Emergencies. HSEMD, IDALS, CFSPHAnimal Disease Emergency Local Response Preparedness, 2008 National Incident Management System.
From Research Prototype to Production
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
What is a life cycle model? Framework under which a software product is going to be developed. – Defines the phases that the product under development.
Overview of WP1 at a Glance Pierre Bonnal Engineering Department Scientist-in-Charge for CERN.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Time Collection with Mobile Devices Session Presented by JP Issock Quality Business Consulting.
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
ANKITHA CHOWDARY GARAPATI
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
Software QA Safety Systems at SLAC Enzo Carrone Controls Department – Safety Systems SLAC National Accelerator Laboratory.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Technology Department WP2 Progress Report Th. Otto
Project Management and Quality Assurance Support Pierre Bonnal on the behalf of the members of the newly created EN-MEF-QOP section.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Review of the processes released in the framework of the MMP Goran Perinić.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
I. Bergevoet - Training preparation
Pragmatics 4 Hours.
MEM Cybersecurity Working Group Update to PCD Technical Committee
Definition of CIM “CIM is the integration of the total manufacturing enterprise through the use of integrated systems and data communications coupled.
MEM Cybersecurity Working Group Update to PCD Technical Committee
The ILC Control Work Packages
Quality Assurance applied to Accelerator Safety
Regulation and Licensing Department Accela Replacement Project Initiation Request Agency CIO/IT Lead - Michelle Langehennig, Chief Information Officer.
LINAC OPS Budget Review
Infor EAM in the Handling Engineering Group at CERN
Presentation to Project Certification Committee, DoIT August 24, 2008
HHS Child Welfare National IT Managers' Meeting
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer to technical coordination 3. Bringing survey closer to the integration and configuration activities 4. Re-centering quality and process management Main impacts on HE, MEF and STI

Engineering Department ENEN What is changing in EN November 18, 2013Roberto SabanA&T Sector Organization in Remote Handling and Manipulation Activities 1 Streamlining and boosting remote handling and manipulation activities Distributed across several sections in STI

Engineering Department ENEN 1 Streamlining and boosting remote handling and manipulation activities Domains of activity 1. Disseminate design practices for accelerator components which take into account remote manipulation 2. Design, develop and procure or manufacture devices which can remotely manipulate, measure, inspect 3. Operation, service November 18, 2013Roberto Saban3

Engineering Department ENEN 1 Streamlining and boosting remote handling and manipulation activities The Scope  Reduce the dose to personnel for interventions in highly radioactive areas but also operations in hazardous areas and conditions (e.g. ODH)  Inspection, measurements, manipulation, handling of light weights  Deploy when cumulative savings of tens of mSv or repetitive operations where it would allow cumulative savings of a few mSv per cycle  In the A&T Sector but can be extended to experiments or FB interventions November 18, 2013Roberto Saban4

Engineering Department ENEN 1 Streamlining and boosting remote handling and manipulation activities Mission of STI for Remote Manipulation Mission of HE for Remote Handling  Design and development of controls, electronics, sensors, etc.  Design and development of mechanical interfaces (grippers, holders, etc.)  Specification of controls, electronics, sensors, etc.  Design and development of mechanical interfaces (grippers, holders, etc.) 50 kg November 18, 2013Roberto Saban5

Engineering Department ENEN 1 Streamlining and boosting remote handling and manipulation activities  Completion of the ongoing projects  TIM software, both embedded and supervision  Installation and commissioning of the ISOLDE robots  Procurement, adaptation of industrial solutions for conveyors  Manipulation and handling of collimators  Common solutions on peripherals  Future projects involving manipulation and handling Collaboration areas between HE and STI November 18, 2013Roberto Saban6

Engineering Department ENEN What is changing in EN November 18, 2013Roberto SabanA&T Sector Organization in Small works for the accelerators and experimental areas 2 Bringing small works closer to technical coordination As a unit in one of the sections in MEF

Engineering Department ENEN What is changing in EN November 18, 2013Roberto SabanA&T Sector Organization in Survey Unit From BE As a section in MEF 3 Bringing survey closer to the integration and configuration activities

Engineering Department ENEN What is changing in EN November 18, 2013Roberto SabanA&T Sector Organization in Quality and Organizational Processes Part of the Project Office As a section in MEF 4 Re-centering quality and process management

Engineering Department ENEN 4 Re-centering quality and process management November 18, 2013Roberto SabanA&T Sector Organization in QOP = Quality and Organizational Processes A&T Sector activities still rely on the LHC Project QAP that is partly obsolete (1998– 2003); hence:  Mission #1: Develop a modular and scalable quality management and systems engineering framework, suited the needs of the A&T Sector and superseding the LHC Project QAP and other general purpose QA related documents

Engineering Department ENEN 4 Re-centering quality and process management November 18, 2013Roberto SabanA&T Sector Organization in Quality and Organizational Processes  Mission #2: (core mission) Provide support to A&T Sector programs, projects and activities in the fields of:  Project Management & Systems Engineering  Risk, Quality, Maintenance* Management Means: internal consulting, coaching, training and operational support * after the Maintenance Management Project is completed

Engineering Department ENEN 4 Re-centering quality and process management November 18, 2013Roberto SabanA&T Sector Organization in Quality and Organizational Processes  Mission #3: performing the technical auditing (i.e. chairing the specification committees) of the tendering documents for the supply contracts released in the A&T Sector as per the CERN Procurement Rules

Engineering Department ENEN 4 Re-centering quality and process management November 18, 2013Roberto SabanA&T Sector Organization in Quality Assurance Committee  Collect needs in matter of quality management, systems engineering, project management, risk management, product lifecycle management…  Overview the development of the modular and scalable quality management and systems engineering framework  Identify and anticipate trends in matter of QA, SE, PM, RM, PLM…  Enforce the implementation of coordinated practices

Engineering Department ENEN The MEF Group Reloaded November 18, 2013Roberto SabanA&T Sector Organization in Coordination, planning for CERN Accelerators Support, coordination & engineering for secondary beams and experiments Quality configuration databases integration studies Quality configuration databases integration studies Coordination LHC & LINAC4 Organization, Scheduling & Safety Engineering for Beams & Experiments Liaison to Experiments Services & Installation Quality and Organizational Processes Database & Configuration Management Survey Integration