1 Lane Carlson ARIES Pathways Project Meeting San Diego, CA Jan 23-24, 2012 Updating the SCLL Design & ASC Documentation.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

General Ledger and Journals. Financial Services - GL and Journals presentation What are journals? A journal [document] is used to record accounting.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
1 Lane Carlson ARIES Pathways Project Meeting Gaithersburg, MD, Oct 13-14, 2011 Substantiating the ASC & Implementing the DCLL Blanket.
Functions.
April 27-28, 2006/ARR 1 Finalizing ARIES-CS Power Core Engineering Presented by A. René Raffray University of California, San Diego ARIES Meeting UW, Madison.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
Systems Code Status J. F. Lyon, ORNL ARIES Meeting June 14, 2006.
Summary and Closing Remarks Farrokh Najmabadi University of California San Diego Presentation to: ARIES Program Peer Review August 18, 2000 UC San Diego.
Neutron Wall Loading Profile Using CAD/MCNP Interface and (progress report) Mengkuo Wang ARIES Meeting June 16-17, 2004 University of Wisconsin - Madison.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
29 July Lane Carlson, Charles Kessel Mark Tillack, Farrokh Najmabadi ARIES-Pathways Project Meeting Washington, D.C. June 29-30, 2010 Exploring the.
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
Poloidal Distribution of ARIES-ACT Neutron Wall Loading L. El-Guebaly, A. Jaber, D. Henderson Fusion Technology Institute University of Wisconsin-Madison.
1 Lane Carlson, Mark Tillack, Farrokh Najmabadi, Charles Kessel University of California, San Diego & Princeton Plasma Physics Lab US/Japan Workshop on.
Development of the New ARIES Tokamak Systems Code Zoran Dragojlovic, Rene Raffray, Farrokh Najmabadi, Charles Kessel, Lester Waganer US-Japan Workshop.
Chamber Dynamic Response Modeling Zoran Dragojlovic.
US-Japan Workshop on Fusion Power Plants and Related Advanced Technologies High Temperature Plasma Center, the University of Tokyo Yuichi OGAWA, Takuya.
ARIES Town Meeting On Physics of Compact Stellarators as Power Plants Farrokh Najmabadi and the ARIES Team September 15-16, 2005 Princeton Plasma Physics.
26 Jan Lane Carlson, Charles Kessel Mark Tillack, Farrokh Najmabadi ARIES-Pathways Project Meeting San Diego, CA Jan 26-27, 2011 Needful Systems.
Highlights of ARIES-AT Study Farrokh Najmabadi For the ARIES Team VLT Conference call July 12, 2000 ARIES Web Site:
ARIES Systems Studies: ARIES-I and ARIES-AT type operating points C. Kessel Princeton Plasma Physics Laboratory ARIES Project Meeting, San Diego, December.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
PRE-PROGRAMMING PHASE
Page - 1 Rocketdyne Propulsion & Power Role of EASY5 in Integrated Product Development Frank Gombos Boeing Canoga Park, CA.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
CASE Tools And Their Effect On Software Quality Peter Geddis – pxg07u.
ArcGIS Workflow Manager An Introduction
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Progress in ARIES-ACT Study Farrokh Najmabadi UC San Diego Japan/US Workshop on Power Plant Studies and Related Advanced Technologies 8-9 March 2012 US.
A new approach for exploration of tokamak power plant design space Farrokh Najmabadi, Lane Carlson, and the ARIES Team UC San Diego 4 th IAEA Technical.
Using OCR for Census Data Capture in China National Bureau of Statistics of China.
Systems Analysis Development for ARIES Next Step C. E. Kessel 1, Z. Dragojlovic 2, and R. Raffrey 2 1 Princeton Plasma Physics Laboratory 2 University.
Hutch Neilson Princeton Plasma Physics Laboratory K-DEMO Project Meeting 26 June 2013 NFRI-PPPL K-DEMO Project Status and Plans Overview.
1 TenStep Project Management Process ™ PM00.8 PM00.8 Project Management Preparation for Success * Manage Documents *
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Systems Code – Hardwired Numbers for Review C. Kessel, PPPL ARIES Project Meeting, July 29-30, 2010.
1 Lane Carlson 1, Mark Tillack 1, Farrokh Najmabadi 1, Charles Kessel 2 1 University of California, San Diego & 2 Princeton Plasma Physics Lab US/Japan.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
1 Lane Carlson ARIES-Pathways Project Meeting Gaithersburg, MD, July 27-28, 2011 Generalization and Blanket Updates to the ASC.
ARIES- ACT, Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting September 2012 Bethesda,
European Fusion Power Plant Conceptual Study - Parameters For Near-term and Advanced Models David Ward Culham Science Centre (Presented by Ian Cook) This.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Progress of ARIES Systems Code Development Zoran Dragojlovic A. René Raffray Farrokh Najmabadi ARIES-“TNS” Project Meeting June 14 and 15, 2007 General.
Systems Analysis Development for ARIES Next Step C. E. Kessel 1, Z. Dragojlovic 2, and R. Raffrey 2 1 Princeton Plasma Physics Laboratory 2 University.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
Assessment of Fusion Development Path: Initial Results of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego ANS 18 th Topical Meeting on the.
Development and Scope of ARIES Systems Code Zoran Dragojlovic A. René Raffray Farrokh Najmabadi ARIES-“TNS” Project Meeting April 3 and 4, 2007 University.
Neutron Wall Loading Update L. El-Guebaly, A. Jaber, A. Robinson, D. Henderson Fusion Technology Institute University of Wisconsin-Madison
ING XBRL Proof of Concept July 19, ©2005 page 2. Utilizing XBRL  ING Objectives  Benefits  Goals  Proof of Concept Plan  Stat  USGAAP  Pain.
1 Lane Carlson, Charles Kessel, Stephen Efthyvoulos ARIES-Pathways Project Meeting Bethesday, MD April 4-5, 2011 Finalized Systems Code Modifications &
TEXFIRS Summary Data Reports. NFIRS 5.0 Web-based Summary Output Reports Tool Run summary and statistical calculations on the data saved to the national.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
Comments on ARIES-ACT 1/2011 Strawman L. El-Guebaly Fusion Technology Institute University of Wisconsin-Madison
Engineering models in the ARIES system code, Part II M. S. Tillack, X. R. Wang, et al. ARIES Project Meeting January 2011.
MELCOR model development for ARIES Safety Analysis
Improvements to power flow modeling in the ARIES system code
Maintaining software solutions
Trade-Off Studies and Engineering Input to System Code
University of California in San Diego
Development of a Visualization Tool for the ARIES Systems Code
Update of ARIES ACT-1 systems analysis
Systems analysis of ACT2 design space
Outline System architecture Current work Experiments Next Steps
Follow-up of the 2015 meeting Items 2 & 3 of the agenda
Analysis of Technical and Programmatic Tradeoffs with Systems Code
ACT-1 design point definition
Presentation transcript:

1 Lane Carlson ARIES Pathways Project Meeting San Diego, CA Jan 23-24, 2012 Updating the SCLL Design & ASC Documentation

2 ASC Progress New! Continual systems code updates to improve credibility and transparency. Refining of SCLL design. New comprehensive documentation. New ASC Homepage for all ASC-related material. Oct action items for ASC:  Focus on updating and completing SCLL design  Delay issuing DCLL strawmen until a consensus on new thicker build is incorporated  Investigate additional 3D printing Status Ongoing Forthcoming Ongoing

3 ARIES Design Nomenclature NameBlanketPhysicsStrawman Point ACT-SASCLL (SiC self-cooled PbLi)AdvancedIssued April 2011 ACT-SA (b)SCLLAdvancedRe-run June 2011 ACT-SA (c)SCLLAdvancedRe-ran Jan 2012 ACT-SCSCLLConventionalIssued April 2011 ACT-DADCLL (dual-coolant PbLi)AdvancedForthcoming ACT-DCDCLLConventionalForthcoming All formally-issued strawmen available online: ARIES ACT-SA -DC SCLL, Advanced DCLL, Conventional

4 Substantiating SCLL Design What is different from ACT - SA (b) such that we need the SA (c) update? Radial build, plasma surface area corrected (July 2011 presentation) Power balance corrected (Oct 2011 presentation) New, easier-to-read printouts for strawman points

5 ASC Homepage History Documentation o Modifications o Equations o Code Modules o Input & outputs o Examples o Flow of calculations o Power flow diagram o Reference documents o Old documentation Strawmen Points VASST

6 Documentation Page 1 o Modifications:  Subversion SVN version control  SVN history log  Modifications sheet (ASC_mods.xlsx)

7 Documentation Page 2 o Equations:  Volume calculations  Blanket, divertor pumping powers  First wall and divertor heat flux  Power summation  Gross cycle efficiency  Current drive  Part construction, references and constraints Part or calculation Ref. docs, where this resides in the code, notes Equations, notes, assumptions Defined variables and explanations

8 Documentation Page 3 o Code Modules (C++):  Physics, Aries, Cost, Costing Accounts, Design Point, Geometry, Part.cpp Code module Date of documentation ASC version (SVN #) Module name History of the module Notes on module and its purpose Reference docs (viewable on ASC Documentation page)

9 Documentation Page 4 o Input files:  Raw data file from physics module  Setup files – choose divertor, blanket, scanning mode  Runaries script – designates points to scan  Radial build input file – IB, OB, vertical  Materials – name, purpose, density, cost, cost basis year  Inflation factors  Costing parameters  Magnets – TF and PF coil parameters  Power flow – neutron multiplication factors, efficiencies, power flow fractions

10 Documentation Page 5 o Output files:  Raw data output file  Part files for CAD drawings  Costing accounts and algorithms  System engineering summary  Powers and heat fluxes summary  Inflation factors, material properties, part compositions printouts o Flow of calculations diagram – flow of the code structure o Power flow diagram – complete listing of all power fractions, power flow, generated, lost and recovered heat. o Reference documents – spreadsheets, papers, journal articles, etc. from contributing team members to reference equations, assumptions and hard numbers in the systems code. o Old reference documents – from Z. Dragojlovic for archival purposes.

11 Documentation Page 6 o Systems Code Flow of Calculations & Structure  Input files  Processing/computation  Databases  Output files  Filtering steps o Power Flow Diagram, as presented Oct. 2011

12 Strawmen Points Page o Version o History/overview o Four-corners approach o Strawmen issued  Name  Date  Blanket  Physics  ASC version  Notes o Filtering sequences

13 VASST Page o VASST Version o Overview o Filtering sequences o Samples o Screenshots

14 VASST Filtering Sequence o Used to help find ACT-SA strawman point

15 Easier-to-read part printouts combine all part parameters

16 Summary & Future Work Modifications continue to enhance & clarify the ASC. Comprehensive documentation posted on ASC Homepage:  Ready to implement changes to SCLL design as they become available and ready to run further systems analysis.  Incorporate any new inputs and modifications into the code, e.g. new builds, compositions, physics parameters, etc.  Please call to attention any errors in documentation or updates to parameters/equations within the code.

17 3D Divertor Printing

18 3D printing – what we’ve learned Good exercise to evaluate clearances and assembly process. Ambitious goal of printing ~1/2-m scale divertor module. ~30x longer printing time than initial part (~200 hours). More material than anticipated ~150 in 3 (3 cartridges). Print ½ scale for time constraints. ~50 x 20 cm scale ~10 cm scale