Ministry of Environment and Water Management, Romania Managing Authority for SOP Environment Sectoral Operational Programme Environment - SOP Environment.

Slides:



Advertisements
Similar presentations
Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
European Commission, DG Environment Brussels, 05 April 2006 Screening of chapter 27 - Environment Dr. Violeta Vinceviciene European Commission DG Environment.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
Sectoral Operational Programme for Environmental Infrastructure Ministry of Environment and Water Management.
MAKING USE OF IPA IN CROATIA – OPERATIONAL PROGRAMMES UNDER COMPONENTS III AND IV 13 November 2007.
„Extension and modernization of water and wastewater infrastructure in Arad County”
Public Utility for water supply and sewage „Naissus“ Niš City of Niš, Serbia Local governments: helping each other?
Support for programme and project development: JASPERS and ELENA Ralf Goldmann EMA network Meeting
Ex post evaluation of a sample of projects co-financed by the Cohesion Fund ( ) EEA Financial Mechanism, Brussels 13 June 2005.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Enhancing Institutional and Administrative Capacity case: POLAND
EUROPEAN COHESION POLICY AT A GLANCE Introduction to the EU Structural Funds Ctibor Kostal Sergej Muravjov.
Integrated Projects Spetember 2013 Maja Mikosinska DG Environment European Commission.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Preparation of Bulgaria for future use of EU Structural Instruments Lyubomir Datzov Deputy Minister of Finance.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
1 MINISTRY OF LABOUR, SOCIAL SOLIDARITY AND FAMILY ESF HEAD OF MISSION MANAGING AUTHORITY FOR SECTORAL OPERATIONAL PROGRAMME FOR HUMAN RESOURCES DEVELOPMENT.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
JASPERS in the Environment, Energy and Municipal Sectors Cost – Benefit Analysis Prague, 28 th November 2007.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
EU Water Policy Sustainable water management for generations to come.
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.
EU Financing in Environmental Sector during April 2008.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
Regional policy European Commission EN Update on IPA Component III - environment Brussels, 28 November 2008 Erich Unterwurzacher REGIO.I4 – IPA/ISPA.
Financial assistance to environment - outside the EU Brussels, 28 th May 2009 World Bank event Joanna Fiedler European Commission DG Environment.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
« Performing Efficient Models of Administration Capacity and Regional Reform in the European Union» European Parliament 15 October 2008 Bruxelles Romanian.
Experience of Accessing EU Financial Support in Lithuania 4th PG Funding Meeting , Paris.
1 EUROPEAN FUNDS IN HALF-TIME NEW CHALLENGES Jack Engwegen Head of the Czech Unit European Commission, Directorate General for Regional Policy Prague,
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
Seminar “American Expertise and technology for the water and wastewater sector” 11 April 2011 Business Opportunities in the Romanian water and wastewater.
National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
TAIEX – REGIO Multi Country Workshop on management practices for environmental investments 8-9 December 2015, Vilnius Presentation by BULGARIA Ministry.
Environmental Investments in Latvia and Best Practices 08 December 2015 Zanda Krūkle Senior expert of the Programme management division.
Progress and challenges of a transboundary cooperation Dr. Adam Kovacs International Commission for the Protection of the Danube River (ICPDR) Status of.
Financial Implementation of the Assistance from the Structural Funds and the Cohesion Fund of the EU Sylvia Indjova Head of Certifying Authority Director.
The LIFE Programme Iñigo Ortiz de Urbina LIFE External Assistance Regional coordinator Technical Assistance to Support the Development of Green.
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
Monitoring Expert, NEEMO GEIE
Donor Coordination Process
PRE-ACCESSION PROJECT IMPLEMENTATION IN CROATIA
National Administration “Romanian Waters” NARW Bucharest - Romania
Day 1 Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural Instruments.
Danube Water Conference, Vienna, May 2017
Meeting Standards and Expectations in the Water Industry
Financing Public WSS Infrastructure: Reflections on competing investment drivers and other factors to be considered 3 Challenges & 3 Recommendations from.
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Workshop with the 8 PAF related Proposals & the Habitats Committee
progress of the water reform in bulgaria
Biodiversity, Natura 2000 & Green Infrastructure in the Regional Policy Mathieu Fichter European Commission, DG Regio Team leader "sustainable.
Presentation transcript:

Ministry of Environment and Water Management, Romania Managing Authority for SOP Environment Sectoral Operational Programme Environment - SOP Environment and other programmes for UWWTD implementation - April 21 st 2008 Florian BURNAR

Water sector - Key actors in Romania Ministry of Environment – authority responsible for water sector policyMinistry of Environment – authority responsible for water sector policy Ministry of Administration and Interior – authority responsible for public services policyMinistry of Administration and Interior – authority responsible for public services policy National Authority for Community Services RegulationNational Authority for Community Services Regulation Local authoritiesLocal authorities OperatorsOperators

Transition periods for water Directives Waste water (Directive 91/271/EEC)– sewage systems and waste water treatment plants 2013/2015 – 263 agglomerations of more than 10,000 p.e – 2346 agglomerations of between 2,000 and 10,000 p.e. Sensitive area – advanced wastewater treatment Drinking water (Directive 98/83/EC) 2015 – compliance with quality parameters for drinking water

Cost assessment - environmental sectors

Water sector – top priority The most demanding environmental sector! 19 bil. Euro – total estimated investment costs for compliance with EU Directives Approx. 8.6 Bil. euro needed by 2013, only approx. 4 billion Euro available within SOP framework Optimisation of investment cost at macro level – a must Regionalisation – part of the solution (economies of scale)

Constraints Compliance with the commitments in the AT – sine- qua-non requirement Limited financial resources  high investment need; Limited period of time ( ) Conclusion: Need for investment prioritization;

Available EU funds in Romania EU programmes – the “cheapest” financing source for investments in environmental infrastructure  PRE–ACCESSION  PHARE, ISPA, SAPARD, LIFE –approx. 180 mil. Euro/ year  POST–ACCESSION  SCF – approx million Euro/year expected for environmental projects

ISPA programme overview  42 Financing Memoranda signed for environmental sector, out of which:  29 projects for modernization of water/waste water infrastructure;  7 projects for solid waste management;  6 TA projects.  Total amount of approved ISPA projects – approx. Euro 1.4 billion:  1 billion Euro ISPA grant;  400 million Euro – national co-financing  However, only major municipalities (population over 100,000) – access to EU funds

Financial Perspective  National Development Plan  National Strategic Reference Framework  7 OPs: Human Resources Development Development of Administrative Capacity Environment Transport Competitiveness Regional Operational Programme Technical Assistance

Sectoral Operational Programme Environment

Correlation between NSRF, NDP and SOP Environment NSRF NDP Priority 2 – Development of infrastructure at European standards Priority Axis 3 – Protection and improvement of environmental quality SOP ENVIRONMENT Global Objective – Improvement of living standards and environment, focusing in particular on meeting the environmental acquis Specific Objective 1 Improve the access to water infrastructure, by providing water supply and wastewater services in most urban areas by 2015 Specific Objective 2 Improvement of soil quality, by improving waste management and reduction in the number of old ecological burdens in min. 30 counties by 2015 Specific Objective 3 Reduction of negative environmental impact caused by old municipal thermal plants in most polluted localities by 2015 Priority Axis 1 Extension and modernization of water and waste water infrastructure Priority Axis 2 Development of integrated waste management systems and rehabilitation of old ecological burdens Priority Axis 4 Development of management systems for protected areas Priority Axis 5 Implementation of adequate infrastructure of natural risk prevention in most vulnerable areas Specific Objective 4 Protection and improvement of biodiversity and natural assets by supporting NATURA 2000 implementation Specific Objective 5 Reduction of the incidence of natural disasters for the population, by implementing preventive measures in most vulnerable areas by 2015 Priority Axis 3 Improvement of municipal heating systems in selected priority areas LONG-TERM OBJECTIVES

Distribution of total financial contribution per Priority Axes - Community funding + national counterpart - (in million Euro) Total allocation SOP ENV: Euro million

SOP Environment – Strategy Priority Axis 1 – Water  regional W/WW projects Priority Axis 2 – Waste  regional IWM projects Priority Axis 3 – District heating  selected localities (highly polluted from district heating) Priority Axis 4 - Nature protection  implementation of Natura 2000 network Priority Axis 5 - Flood prevention  selected areas – most vulnerable to floods

SOP Water Sector Strategy Strong strategic approach to maximize cost-efficiency - key to meet compliance with the water sector acquis in the limited timeframe. Main elements: Group communities in clearly defined geographical areas and develop jointly long term investment programmes for water sector development – improve infrastructure and LOS while maintaining affordable level of tariffs and ensuring sustainability of investments Building capacity programmes - provide for clear accountabilities of key stakeholders, while keeping the appropriate expertise to each level of competence (MA, IB, municipalities, operators) Ensure strong coordination of domestic funds with EU funds for water sector investments, both at strategic and operational level Deliver efficiency gains by: –Using economies of scale and saving resources –Optimising investments and operational costs at regional level –Optimising project selection by reducing costs for applicants and by reducing duplication of appraisal; –minimising transactions costs to ensure value for money in terms of administrative overheads

Priority Axis 1 - Extension and modernization of water and wastewater systems Specific objectives –Provide adequate water and sewerage services, at accessible tariffs –Provide adequate drinking water quality in all urban agglomerations –Improvement in purity of watercourses –Improvement of the level of WWTP sludge management Indicative operations Construction/modernization of water sources intended for the drinking water abstraction; Construction/rehabilitation of water treatment plants Extension/rehabilitation of water and sewerage networks. Construction/upgrading of wastewater treatment plants Construction/rehabilitation of sludge treatment facilities Metering, laboratory equipment, leakage detection equipment, etc

Problems addressed by SOP Environment – Priority Axis 1 Infrastructure Only 52% of population have access to centralized water/wastewater services Almost 80% of wastewater discharged in natural receivers untreated or insufficiently treated Most of the existing water infrastructure – in poor status due to long term under-investments Operational aspects Excessive fragmentation of water sector systems and services Inappropriate maintenance and operating services in most small and medium agglomerationsFunding Lack of capacity to attract substantial funding for investment needs in majority of small and medium agglomerations Private sector – not interested to invest in short term Limited capacity to implement large scale projects; only 35 large municipalities managed to attract funds to implement major investment programmes

Building Capacity Programme in the Water Sector Romanian authorities designed programmes to support LA to: –Increase capacity of LA to implement internationally financed programmes –Promote self sustainable regional utilities by introducing principles of cost recovery and efficiency of services –Strengthen the capacity of LA to monitor effectively their public services Regionalisation via ROC and AoM (AoM/IDA) – key element in order to comply with the acquis and to ensure basic living standards (specific objective of prirority 1 under SOP) No viable alternative identified

Pre-accession Programmes for Regionalisation Regionalisation of water services - mainly supported by pre- accession programmes, including so far 36 of 42 counties: –1 Phare TA project - SAMTID for 11 counties Limited investments in DW infrastructure and reorganisation of local water servicesLimited investments in DW infrastructure and reorganisation of local water services –2 ISPA TA projects – FOPIP for other 25 counties Project preparation in parallel with institutional support for regionalisationProject preparation in parallel with institutional support for regionalisation –External loan – for the rest of 6 counties Project preparation in parallel with institutional support for regionalisationProject preparation in parallel with institutional support for regionalisation Slightly different approach, but the same final objectiveSlightly different approach, but the same final objective

Capacity Building Programme in the Water Sector Objective - Support the LA to implement an integrated multi- annual capital investment programme in order to improve the standards of municipal water and wastewater services by creating efficient, financially viable regional service providers able to plan and implement long term investments, in line with National Development Plan (NDP) and EU policies and practices.Objective - Support the LA to implement an integrated multi- annual capital investment programme in order to improve the standards of municipal water and wastewater services by creating efficient, financially viable regional service providers able to plan and implement long term investments, in line with National Development Plan (NDP) and EU policies and practices. Access to EU funds – an incentive to move from a large number of weak services providers to a limited number of big and strong operator, capable to provide services at affordable levels of tariffs, but ensure full cost recovery and loan reimbursement for local authoritiesAccess to EU funds – an incentive to move from a large number of weak services providers to a limited number of big and strong operator, capable to provide services at affordable levels of tariffs, but ensure full cost recovery and loan reimbursement for local authorities

Targets of Regionalization Improved operation of existing regional systemsImproved operation of existing regional systems Investment planningInvestment planning Optimization of available resourcesOptimization of available resources Capability of meeting EU W & WW Directive requirementsCapability of meeting EU W & WW Directive requirements Improved management performanceImproved management performance Improved lending capability; Access to EU investmentsImproved lending capability; Access to EU investments Limitation of political involvement in the supply of water and wastewater servicesLimitation of political involvement in the supply of water and wastewater services Regional Operator as the mechanism for provision of service to small communitiesRegional Operator as the mechanism for provision of service to small communities Availability of more similar companies for benchmarking comparisonsAvailability of more similar companies for benchmarking comparisons Overall target – to provide that 2600 localities of more than 2000 p.e. meet 2018 targets

AoM/IDA – role to monitor and supervise the implementation of the investments, the financial and operational performance of the ROCAoM/IDA – role to monitor and supervise the implementation of the investments, the financial and operational performance of the ROC ROC – role to implement the investment plan and to perform services in line with delegation contract and AoM/IDA’s decisionsROC – role to implement the investment plan and to perform services in line with delegation contract and AoM/IDA’s decisions Contract of delegation of services between AoM/IDA-ROC (the core of the operational and institutional organisation of regionalised water and wastewater management)Contract of delegation of services between AoM/IDA-ROC (the core of the operational and institutional organisation of regionalised water and wastewater management) –AoM/IDA has decision-making and control powers (acc. to Law 241/2006 reflected in the delegation contract) on: Water Sector StrategyWater Sector Strategy Long term investment planLong term investment plan Public assets managementPublic assets management ROC Utility performanceROC Utility performance Tariff policyTariff policy –ROC has maximum of security in the performance of its contractual obligations in order to build its capacity of self-financing investments included in the long term development plan –Introduces the regional mission of the operator –Introduces the role of the AoM/IDA as a contracting party Regionalisation – Main Elements of Institutional Organisation

Regionalization map

Project pipeline – water sector

Regional Long term investment Plans (Master Plans) Intended to help in prioritization of CF investments. prepared at the level of each county of Romania; represents a tool for identification of investment needs in the long run (30 years); Provides for a clear picture of agglomerations acc. to UWWTD;

Specific information and plans summary 25 Plans and investment needed milestonesCurrent situation Gaps or problems identified Stage 1 (interim) by 2015* (Cohesion Fund) Stage 2 (by 2018) Other stages Specific information Drinking Water connection Brief description, quantification of major elements (aggregated data – no of systems, coverage per urban, rural, etc.) Brief description Water treatment Swage Collecting system Treatment level Treatment performance Receiving areas Sewage sludge management

Identification of all agglomerations at county level (maps and data base) “Clustering” of Agglomerations based on techno-economic assessment Options Analysis (central/de-central) Discussion with stakeholders Preparation of Long-term investment plan 26 Definition of agglomerations in Master Plan

Detailed option analysis Preparation of final/detailed maps and data base on selected agglomerations 27 Feasibility study level

Scenarios “Definitions of UWWTD” 28

“Clustering” of Agglomeration 29

Example Roman page 30 Example for Agglomerations – Detailed Definition of Boundaries

Boundary of Agglomeration 31

32 Compliance Dates – RO Accession Treaty Water Supply above inhabit. => Wastewater collection above P.E. => 2013 Wastewater treatment above P.E. => 2015 Below P.E. Intermediate targets => (% on national level). Latest compliance dates: for Water Supply: 2015! for Wastewater: 2018!

Proposed CF investments Balanced proposal between water – wastewater (slightly more for wastewater) focused on Accession Treaty (AT) obligations: –significant contribution to AT obligations –beneficiary population (major agglomerations) Balanced proposal between rehabilitation and extension networks for water and sewerage networks

Priority for CF investments Investments in order of priority: –WWTPs in major agglomerations (sludge treatment facilities included) –Wastewater network in major agglomerations (extensions first, rehabilitation where critically important) –DWTPs (new or rehabilitation) where justified by insufficient quality and/or quantity) –Distribution networks (extensions and/or rehabilitation where critically important) –Stormwater management facilities, where appropriate

Selection of priority investments Two step approach: Step 1: Mandatory criteria –Compliance date –Association agreement Step 2: Ranking –Size of agglomeration (highest weight) –Health improvement –Environmental improvement –Efficiency improvement 35

Priority Investment Measures  Phasing of Investment measures  Approval of LA of MPs and investment list is mandatory!!  Maps of agglomerations should be included in the Urbanism Plan (by LA) 36

37 Types and Purpose of Indicators Type of IndicatorPurpose Project Performance indicators Evaluation of Projects and investment components  Compare situation before and after project implementation => Impact  Benchmarking  compare indicators of different agglomerations  compare with international standards values  Check technical plausibility and feasibility of proposed measures  Compare unit costs Programming indicators  Monitor achievement of (SOP) targets  Aggregation of project results and costs at county and national level

38 Programming Indicators (PRI) Selected indicators can be used for comparison with SOP targets for programming purposes at national level (MESD) –How much did we already (or will we) achieve on county and national level at a (after implementation of projects)? –What are the costs (estimated and real costs) to reach interim targets (i.e. Until 2015) –How far are we away from defined final targets? –How much will it cost to reach final targets?

39 Plausibility Check Check plausibility of data using indicators Compare indicators of each agglomeration and benchmark selected ones (i.e. Unit cost indicators) If major deviation, more detailed evaluation is necessary (explain reasons for difference) Compare data before / after project There has to be a significant impact (change) i.e. If substantial part of the sewer network is rehabilitated (high investment costs) =>reduction of infiltration water should also be significant

Additional investments to the SOP in the water sector National Rural Development Programme co-financed by the EU in the period 2007–2013 and co-ordinated by the Ministry of Agriculture and Rural Development (MARD), will include investments in the water infrastructure in rural areas Protocol signed between MESD and MARD for ensuring complementarity of investments I n the MP framework and avoiding double financing! Governmental Programmes for development water and environmental infrastructure Foreign loans or various forms of PPP are also solutions considered in some of the urban agglomerations.

SOP Planning Mid 2008 – finalizing the process of submission of the first 10 projects to the EC for approval; 4 projects already approved! 2008: another 30 applications for major projects under preparation: part of them to be submitted to the EC in 2008, part of them in 2009; 2009: all major projects submitted to the EC; 2010: starting of preparation of project pipeline for next programming period.

SOP expected results Population benefiting of new/improved water/wastewater services: approx 10 million p.e.; Total compliance with the water and wastewater directives in localities more than inhabitants but also part of the biggest rural localities.

Thank you for attention!