Clear and Foster Creek Fish Passage Assessment and Prioritization Project Draft Methodology Report: For the Clear and Foster Creek Fish Passage Assessment.

Slides:



Advertisements
Similar presentations
Risk Assessment Refinement BARRIERS TO MIGRATION Aerial Imagery Capture and Processing Derive Channel TypologiesDevelop Remote Sensing Methods Fieldwork.
Advertisements

A forum for coordinating state, federal, and tribal watershed and salmon monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring.
U.S. Department of Energy Pacific Northwest National Laboratory Evaluation of Juvenile Salmonid Culvert Passage SM Anglea, GD Williams, KD Ham, and GA.
BPA Proposal Fish Passage Assessment & Prioritization Program Washington County Land Use & Transportation Greg Miller, P.E., Operations Manager Principal.
Identifying important barriers in the Hudson River Estuary Andrew J. Peck, Ph.D. Michelle Brown Craig Cheeseman The Nature Conservancy October 2012.
Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
What is a Culvert? Culvert Components Culvert Design and Construction
080820_v1DP TRAVEL MANAGEMENT - PROCESS ON THE GILA NATIONAL FOREST.
1 Floodplain Management SESSION 7 Stream Systems on Dynamic Earth Floodplain Management Principles & Practice Prepared By Donald R. Reichmuth, PhD.
Design of Hydraulic Controls & Structures
Culvert Hydraulics using the Culvert Design Form
Design of Open Channels and Culverts CE453 Lecture 26
Assessing Fish Passage at Culverts Metrics and Preliminary findings. Presentation by Richard Thompson Ministry of Environment.
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Design of Open Channels and Culverts
Topographic maps show…. - USGS: Uses for topographic maps… -
Topographic Maps.
Climate Change: An Aquatic Perspective and State Management Needs Gary Whelan MI DNR Fisheries Division September 2008.
1 Mixing engineering and biology. Where Fish Passage is required Connectivity is required across the landscape wherever there are fish. Fish and fish.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
BNSF Railways- Nason Creek LWP Reconnection Project PRCC/Tributary Fund– November 10, 2011 Wenatchee, WA.
Incorporating Spatial Heterogeneity in Temperature into Climate Vulnerability Assessments for Coastal Pacific Streams NOAA, UW, USGS This project will.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Time of Travel. American Water Charleston intake on the Elk River Charleston 1,000, ,984 = 1880 seconds or 31 minutes.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Natural Resource Information Systems Aquatic Organism Passage Managing your Data in INFRA and NRIS Water Brian Sanborn USFS – NRIS Water/Air Region 9 –
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
Culvert Project Fish Passage – Moving from a focused culvert evaluation to FREP. Richard Thompson Senior Habitat Biologist Ministry of Environment.
Ecological rationale for determining buffer width Forest Ecosystem Management and Assessment Team (FEMAT) Report.
Evaluation of Fish Passage Improvement Projects in the South Coast and Rogue River Basins Duck Creek Associates Dylan Castle.
Uniform Open Channel Flow
Coos Watershed Association Watershed Restoration Projects.
1 Testing the Ability of Native Cutthroat Trout to Pass Through Small Culverts on Steep Slopes N. Phil Peterson, Ryan K. Simmons, Jeffery T. Light Forest.
Introduction Left: Old Kenston High School was built in 1950 Right: New Kenston High School was built in 2006.
Bradshaw Model. Upstream Downstream Discharge Occupied channel width Channel depth Average velocity Load quantity Load particle size Channel bed roughness.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Nehalem River Basin: Technical Assistance for Watershed Data Synthesis, Restoration, and Outreach Priorities 4/16/2008.
Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project No Jason McLellan Confederated Tribes of the Colville Reservation January.
Culvert Hydraulics Hydrotechnical Design Parameters Channel Hydraulics Culvert Hydraulics Culvert Sizing.
Chesapeake Fish Passage Prioritization Project: Overview MARY ANDREWS NOAA JULIE DEVERS USFWS ERIK MARTIN THE NATURE CONSERVANCY CHESAPEAKE BAY FISH PASSAGE.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
1% Sales Tax Commission Board Meeting June 3, 2015.
What is the Bradshaw model?
Bridges Reach analysis Fundamental tool for design
There are 2 Types of Bridge Inspectors – Class B and Class A.
Indices of Road Erosion Bear Valley Watershed, Idaho
EXAMPLE Water flows uniformly in a 2m wide rectangular channel at a depth of 45cm. The channel slope is and n= Find the flow rate in cumecs.
Project funded by: Wild Rivers Coastal Alliance
The North Atlantic Aquatic Connectivity Collaborative Changes for 2016
a design technique for achieving fish passage
Chesapeake Bay Program Budget & Finance Workgroup Meeting
February Earth's Features !.
Identifying Barriers to Fish Passage in Mason County
11/20/2018 Culverts Culverts are the same as bridges as far as locating cross sections 11/20/2018.
UH-Downtown White Oak Buffalo.
Using ArcGIS Pro to Evaluate the Impacts of In-Stream Barriers on Fish Habitats Case study: Bonneville cutthroat trout (BCT) habitats in the Bear River.
Culvert Hydraulics using the Culvert Design Form
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Hydraulics Updates to the IndianaDesign Manual
Eightmile Creek Barrier Assessment
Longitudinal Profile Survey for Successful Culvert Replacement
The North Atlantic Aquatic Connectivity Collaborative Changes for 2016
Stream Crossing Replacement Policy
Baffles – Structures - Spans
Shaver Creek Permitting
Presentation transcript:

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Draft Methodology Report: For the Clear and Foster Creek Fish Passage Assessment and Prioritization Project Presenters Jenny Walsh, Upstream Connection George Robison, Watersheds Northwest

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Presentation Outline Determining fish bearing streams and potential crossings Landowner permission process for field measurements Field measurement methods Hydraulic and cost analysis Prioritization Timeline and outreach

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Finding Crossings for the Assessment Upward extent of fish use not well known Created new maps that have best available information on fish use Each crossing is uniquely numbered to key all information to the GIS database Non crossing issues such as small dams and ponds also considered

Fish Bearing Status and Crossings

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Landowner Permission Process GoalsGoals Gaining trust Education Involvement

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Landowner Permission Process ObjectivesObjectives Establish contact and introduce the project Gain permission to examine potential fish passage barriers on the ownership Educate and exchange information Communicate results

Tax Lot Codes

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Landowner Permission Process ObjectivesObjectives Establish contact and introduce the project Gain permission to examine potential fish passage barriers on the ownership Educate and exchange information Communicate results

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Tools for Outreach Mailings Flyers Press releases CRBC Newsletter CRBC Website Public meetings – CRBC meetings, small community outreach meetings, open house, final report presentation.

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Field Protocol Issues Field measurements must be tied to specific objectives and needs for cost analysis and prioritization. They include: Fish use status at crossing (from updated ODF maps with interim classification for unknown streams along with field verification of presence used for crossing status and habitat use above blockage) Stream slope/profile (critical in determining which design options are viable for cost information) Presence of bedrock or shallow fill to bedrock (critical in determining design options) Degree of drop at outlet or inlet of culvert (essential in determining fish passage status)

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Field Protocol Issues Field measurements continued: Length and slope of culvert (essential in determining fish passage status) Size of existing culvert (useful in pointing to inlet drop at higher flows or in determining risk of catastrophic failure in relation to streamflow) Height of fill and width of road (critical to know in determining needed replacement culvert length for cost information) Stream width (necessary to size replacement culvert options and in determining replacement bridge span for cost estimates)

Design Elements for Simple Design Stake (BM) Invert Elevation 200 foot profile* (*needed profile varies in length) Fill cover Valley fill/Substrate Condition

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Fish Passage Status based on slopes and drops Capacity of Culvert Needed size and design type of new crossing Hydraulic Analysis

Cost Analysis Field measures will be reduced and used to determine a preferred approach (Approach decision tree with criteria in Draft Methodology report) Each approach will be given a cost based on factors like length, span, fill height and other factors (criteria is given in Draft Methodology Report)

Stream width greater than 20 feet? Yes No Long-span bridge Slab bridge Or open box Open metal Arch with footings Streambed Simulation CBS Stream width between feet? Yes Bedrock within three feet of stream surface or within expected elevation of culvert invert? No Steep dynamic stream (>4% gradient) with high scour potential? Stream gradient between 0-8% Yes Bedrock close to (within two feet) of surface and uniform bedding expected? No Yes No

Prioritization Combines cost info, length of habitat, severity of fish passage problem and other factors like failure risk into analysis. With updated GIS coverage can also look at connectivity to culvert and take basin position into account

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Assessment Uses Fish passage is being assessed comprehensively in the Clear and Foster Creek basin. This assessment should: Provide information for cooperative grant funding by identifying the most critical crossings needing action Become a model and a pilot for an assessment for the entire Clackamas basin Become an additional outreach platform to help gain understanding, acceptance and support from basin landowners concerned about improving watershed conditions

Clear and Foster Creek Fish Passage Assessment and Prioritization Project Timeline to Completion Major Milestones –Draft Methodology Report (Submitted) –Field measurements (June-Early July) –Hydraulic Analysis and Prioritization July-August –Draft of final report submitted (September) –Final Report (October)