MGS8020 Control.ppt/Apr 9, 2015/Page 1 Georgia State University - Confidential MGS 8020 Business Intelligence Control Apr 9, 2015.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Test Automation Success: Choosing the Right People & Process
Introduction to Systems Development and Systems Analysis
HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 H/P No.:
Solutions Summit 2014 Corporate Rollout Jonathan Haynes, CPA, CGMA and Kelly Darren, CPA.
Process Mapping. Why Flow Chart? To understand a process or system To (visually) depict all key steps in a process or system To compare existing and ‘ideal’
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
Software Quality Assurance (SQA). Recap SQA goal, attributes and metrics SQA plan Formal Technical Review (FTR) Statistical SQA – Six Sigma – Identifying.
Overview Lesson 10,11 - Software Quality Assurance
Six Sigma Continuous Improvement Training Six Sigma Continuous Improvement Training Document and Standardize Six Sigma Simplicity.
Hazard Analysis and Critical Control Points
The Quality Improvement Model
Applying a Systems Approach EPA Regions 9 & 10 and The Federal Network for Sustainability.
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Introduction to Systems Analysis and Design Trisha Cummings.
Integrated Capability Maturity Model (CMMI)
Read to Learn Explain the purpose of accounting. Describe how property rights are measured. Define the three components of the accounting equation. Describe.
Vancouver User Group Presented by Trevor Moore
CLEANROOM SOFTWARE ENGINEERING.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Change to Project Title
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
1 LSSG Green Belt Training Control: How do we make it happen at a controlled speed?
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. Finance Process 22 May 2006.
Welcome to MT140 Control Wendy Davis. Unit 5 Leadership: Review Leaders Provide: Vision: A mental image of a possible and desirable future state of the.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Resource Management Resource Management 3.03 Understand support services.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Copyright 2013 John Wiley & Sons, Inc. Chapter 3 Monitoring and Controlling the Transformation System.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Quality Management Theory Terms, Concepts, & Principles.
DMAIC: Control Robert Setaputra. Objective Maintain the changes made in the X’s in order to sustain the improvements in the Y’s.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Ambient Monitoring Program PM 2.5 Data Lean 6 Sigma Air Director’s Meeting May 2015.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XIV)
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
TM 720: Statistical Process Control DMAIC Problem Solving
Control Phase Wrap Up and Action Items
Control Phase Wrap Up and Action Items
Resource Management 3.03 Understand support services
CLINICAL INFORMATION SYSTEM
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
RISK REDUCTION PROCESS
Resource Management PP Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Presentation transcript:

MGS8020 Control.ppt/Apr 9, 2015/Page 1 Georgia State University - Confidential MGS 8020 Business Intelligence Control Apr 9, 2015

MGS8020 Control.ppt/Apr 9, 2015/Page 2 Georgia State University - Confidential Control Measure Control Analyze Improve Define Implement Controls –Determine process capability, implement controls to ensure continuance; assign process ownership and manage organizational change Standardize –Create standard operating procedures; create and implement training programs; document project Evaluate Benefit –Calculate the profit of the project and identify opportunities for replication

MGS8020 Control.ppt/Apr 9, 2015/Page 3 Georgia State University - Confidential Agenda 1.Control Plan 2.Benefit Measurement & Change Management 3.Monitoring

MGS8020 Control.ppt/Apr 9, 2015/Page 4 Georgia State University - Confidential Control Plan Strategy Ensure that the process improvements that have been implemented are sustainable and institutionalized Eliminate the need for manual control and vigilance in maintaining process performance Minimize process tampering (over-adjustment) Visible and easily understood by those involved in the process Well documented and simplified as much as possible

MGS8020 Control.ppt/Apr 9, 2015/Page 5 Georgia State University - Confidential Results At the end of the control phase you should be able to describe and demonstrate the process improvement: what the data shows about the effectiveness of the improvements that have been implemented why you are confident that these were the correct improvements and should be standardized how the control mechanisms have been documented and are being utilized in day-to-day operations how the gains will be sustained and who will be responsible what the key learnings are and what recommendations the team developed for further improvements

MGS8020 Control.ppt/Apr 9, 2015/Page 6 Georgia State University - Confidential Prevention vs. detection: Manufacturing Processes

MGS8020 Control.ppt/Apr 9, 2015/Page 7 Georgia State University - Confidential Prevention vs. detection: Transaction Processes

MGS8020 Control.ppt/Apr 9, 2015/Page 8 Georgia State University - Confidential Agenda 1.Control Plan 2.Benefit Measurement & Change Management 3.Monitoring

MGS8020 Control.ppt/Apr 9, 2015/Page 9 Georgia State University - Confidential Estimating Financial Benefits Benefit Estimation –At start and end –Decide computation method early –Conservative and defendable –Time value of money Benefits Issues –Projection for 1 to 2 –years only –Hard and soft benefits Certified by Finance Dept. Treat this subject with great care ! Low Estimate High Estimate Cash Flow

MGS8020 Control.ppt/Apr 9, 2015/Page 10 Georgia State University - Confidential Change Management EmployeeSkill Motivation Process Ownership User Acceptance Process Needs Implementation Plan Management Signoff Rollout Validate Process OthersTraining Materials and Plans New Equipment Space Requirements/Layout Changes “People Side of Change” Presentation: CURRENT STATE Preferred state Resistance to change TRANSITION STATE Anxiety and stress Significant dislike FUTURE STATE Unknown Undesired

MGS8020 Control.ppt/Apr 9, 2015/Page 11 Georgia State University - Confidential Agenda 1.Control Plan 2.Benefit Measurement & Change Management 3.Monitoring

MGS8020 Control.ppt/Apr 9, 2015/Page 12 Georgia State University - Confidential Monitor Implement Visual Controls Monitor Metrics Control Charting Process Capability Analysis Periodic Reviews Audit Controls

MGS8020 Control.ppt/Apr 9, 2015/Page 13 Georgia State University - Confidential Choosing the Right Control Chart Data Type Attribute Continuous Count P-Chart (% Defectives) C-Chart (# of Defects/Unit, or DPU) X Bar-R Chart (n = 2 to 5) X Bar (n>6)