Manufactured Homes Calibration: New Construction Regional Technical Forum September 22 nd, 2015 Mohit Singh-Chhabra.

Slides:



Advertisements
Similar presentations
Sunset Date Extension: Manufactured Homes HVAC Measures Regional Technical Forum November 18 th, 2014.
Advertisements

SEEM Calibration: Revisited Revising the regression to use continuous heat loss variable Regional Technical Forum December 17, 2013.
New Construction Calibration Research Results and Request for Decision Regional Technical Forum March 18, 2014.
Residential New Construction (NC): Slab Insulation UES Measure Update Regional Technical Forum March 18, 2014.
High Performance Manufactured Homes Provisional UES Proposal Presentation to the Regional Technical Forum May 15, 2012 Project Sponsor: Bonneville Power.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
Ductless Heat Pumps in Manufactured Homes with Zonal Electric Resistance Heat Adam Hadley Regional Technical Forum February 18, 2015.
Oregon Energy Star Homes Measure Update New Measure Proposal April 22nd,
SEEM Calibration for Multi-Family Buildings Regional Technical Forum September 18, 2012 Analysis Performed By Ben Larson, Jon Heller, Henry Odum, and Carmen.
High Performance Manufactured Homes Active UES Proposal Presentation to the Regional Technical Forum April 17, 2012 Project Sponsor: Bonneville Power Administration.
Residential and Commercial Storage Electric Resistance Water Heaters (Efficient Tanks) Mohit Singh-Chhabra Regional Technical Forum February 18, 2015.
NEEM Manufactured Homes Field Test Results David Baylon, Ecotope.
Commercial Tank Water Heaters Out-of-Compliance (OOC) UES Measure Recommendation Regional Technical Forum November 19, 2013.
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update March 17, 2015.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
Residential New Construction Montana House: UES Measure Update Adam Hadley Regional Technical Forum April 14, 2015.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF MH Calibration Subcommittee February 27, 2015.
Direction on Guidelines Savings Definition Path: CONTINUED Remaining Useful Life (RUL) and Measure Interaction Regional Technical Forum February 19, 2014.
Manufactured Homes Calibration: Existing and New Homes Josh Rushton & Mohit Singh-Chhabra RTF Update June 16, 2015.
Residential Single Family HVAC UES Measures Proven and Planning UES Measure Proposals Adam Hadley Regional Technical Forum December 16, 2014.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum June.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Standard Information Workbook (SIW) Update Proposal Regional Technical Forum May 13, 2014.
Washington Energy Star and Built Green Homes Measure Update New Measure Proposal August 12th,
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
High Performance Manufactured Homes Active UES Proposal Presentation to the Regional Technical Forum April 17, 2012 Project Sponsor: Bonneville Power Administration.
SEEM Calibration: Phase-2 Adjustments for Failed VBDD Fits Regional Technical Forum August 12, 2014.
Path for Multi-Family (MF) Weatherization and NC Measures Christian Douglass 8/18/2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Single Family Weatherization and HVAC UES Measures Follow-up from August RTF.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat Proven UES Measure Proposal Regional Technical Forum November 19, 2013.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Implementer’s Group June 2015 RTF Meeting Debrief and Upcoming Meeting Prep June 23, 2015.
REM as a Compliance Tool Infiltration Trade-off REMRate vs. SEEM February 19th,
SEEM Calibration for Manufactured Housing Regional Technical Forum December 13, 2011 Analysis Performed ByAdam Hadley Cursory Reviews ByTom Eckman, Ben.
SEEM Calibration for Multi-Family Buildings Regional Technical Forum September 18, 2012 Analysis Performed By Ben Larson, Jon Heller, Henry Odum, and Carmen.
Residential New SF Energy Star Homes Idaho and Montana UES Measure Updates: Energy Star Homes, DHP TCO Homes, and BOP2 Homes March 18 th, 2014.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
New-Construction Manufactured Homes: Update on the Path to Proven Savings Regional Technical Forum November 10 th, 2015 Josh Rushton & Mohit Singh-Chhabra.
Implementer’s Group May 2015 Meeting Debrief and Upcoming Meeting Prep May 19, 2015.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat Proven UES Measure Proposal Regional Technical Forum October 16, 2013.
ENERGY STAR and EcoRated Homes: Planning Estimates and Research Strategy Regional Technical Forum December 8 th, 2015 Josh Rushton & Mohit Singh-Chhabra.
Working Towards Better Savings Estimates for HVAC and Weatherization Measures Regional Technical Forum September 16, 2014.
ENERGY STAR and Eco-Rated Homes: Planning Estimates and Research Strategy Regional Technical Forum December 8 th, 2015 Josh Rushton & Mohit Singh-Chhabra.
Multifamily Homes: Calibration Update Regional Technical Forum December 8 th, 2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum December.
Research Strategy: New-Construction Manufactured Home Measures Research and Evaluation Subcommittee Josh Rushton November 19, 2015.
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
ENERGY STAR Commercial Refrigerators and Freezers Regional Technical Forum January 21 st, 2016 Mohit Singh-Chhabra.
RTF Management Update Jennifer Anziano Regional Technical Forum June 16, 2015.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Non-Proven Residential Duct Sealing Measures: Research Strategy Josh Rushton and Adam Hadley Research and Evaluation Subcommittee October 7, 2015.
Exterior LED Area Lights
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
High Performance Manufactured Homes UES Measures Sunset Date Extension Request Regional Technical Forum December 16 th, 2014.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum June 17, 2014.
Research Strategy: Residential Ductless Heat Pumps Research and Evaluation Subcommittee Christian Douglass and Josh Rushton January 8, 2016.
Single Family New Construction Measure: Slab Insulation Mohit Singh-Chhabra Regional Technical Forum April 19 th, 2016.
Manufactured Homes: Heat Pump Related Measures Regional Technical Forum Presentation August 18 th, 2015.
Working Towards Better Savings Estimates for HVAC and Weatherization Measures Regional Technical Forum September 16, 2014.
Presentation transcript:

Manufactured Homes Calibration: New Construction Regional Technical Forum September 22 nd, 2015 Mohit Singh-Chhabra

Presentation Objectives Approve proposed calibration for electric resistance (ER) heated new homes Approve proposed direction for Heat Pump (HP) homes Approve proposed measure analysis for – ENERGY STAR MH – Ecorated MH Approve proposed deactivation for High Performance Manufactured Homes (HPMH) 2

Manufactured Home Calibration 3

MH Calibration Status Existing Homes: June ‘15: RTF approved ER calibration curve – At the same meeting RTF decided that HP curve does not provide reliable results – RTF approved the use of ER Wx savings estimates as planning estimates for HP homes August ’15: RTF approved HP Upgrade and Conversion Planning measures – Use adjusted SF ER savings values New Homes October ’14: RTF directed staff to re-think the calibration for new construction 4

Today – CAT Analysis of NEEM Data NEEM homes are new homes that are more efficient than code, not as efficient as ENERGY STAR/ Ecorated – CAT was provided data on NEEM homes for analysis and possible calibration Using this data, CAT has modified the ER calibration curve for application to NC Heating Zone 1 – The modified ER curve update does not have much impact on existing homes New points pretty much in line with RBSA The NEEM data on HP homes do not line up with the RBSA data on HP homes – Hence, modifying existing HP curve is not recommended – CAT proposal is to develop Planning Savings Estimates and outline a proposed Research Strategy 5

Data used for update Data includes: VBDD heating energy analysis estimates Location (city) Home size – Square footage – Single/ double/ triple wide Lighting power density 6 Heating SystemHeating Zone 1Heating Zone 2Heating Zone 3 Electric Resistance Heat Pump14101

Analysis Overview SEEM.69 models constructed as per NEEM spec and compared to VBDD estimates SEEM.69: NEEM specs provided basis for models – Note: NEEM specs do not cover all building properties required by SEEM MH calibration standardized inputs used for SEEM input fields not covered by NEEM specs Lighting power density taken from the NEEM dataset Duct leakage and infiltration values from the 2006 NEEM MH study (Summary of 2006 NEEM MH: Field Data and Billing Analysis – Ecotope ) 7

Introduction to Analysis Intent of the analysis is to study difference in modeled and billing data based heating energy estimates for homes in the sample – Does a trend exist? Y – Axis: percentage point difference between VBDD and SEEM X – Axis: SEEM.69 kWh/sf 8

NC Calibration Results – Elec. Resist. Heat 9 Above this line, SEEM overestimates heating energy compared to VBDD Below this line, SEEM underestimates heating energy compared to VBDD  Smaller x-value indicates a warmer climate and/or a more efficient home spec

NC Calibration Results – Elec. Resist. Heat 10

Key Takeaways NEEM data provide data points in the low SEEM.69 kWh/sf range that, align well with RBSA based calibration curve Electric resistance curve can be extended for application to new construction – David Baylon, Bob Davis (Ecotope) were presented this analysis as well. They agreed that the data support the curve 11

Issue with Applying Curve to Calculate Calibrated Savings On application of calibration curve, heating savings for HZ1 > savings for HZ2 and HZ3 for ENERGY STAR homes look like: Majority of the data used for calibration is from HZ1 – We hoped that the curve would capture climate related effects, but the savings imply that it doesn’t 12

Alternate Option (Staff Proposal): Modify Savings Based on SEEM Heating Estimates Use electric resistance curve to develop heating energy savings for HZ1 Apply a SEEM estimated heating energy consumption ratio (HZn/HZ1) to baseline and efficient case HZ1 Phase 1 calibrated consumption to calculate Savings for HZ2 and HZ3 Comparison of example heating savings (kWh) of the two methods for ENERGY STAR new homes 13

Staff Proposal (Contd.) This methodology is an approximate engineering adjustment to develop reasonable savings estimates. HZ2 and HZ3 New Construction measure savings estimates do not meet Guideline requirements for Proven Staff recommends that New Construction measures for HZ2 and HZ3 be categorized as Small Saver – Approximate energy savings potential using 7 th Plan forecasts through 2025 are less than 5 aMW for HZ2 + HZ3 14

NC Calibration Results – Heat Pump 15

NC Calibration Results – Heat Pump 16

Key Takeaways Not a big enough sample to identify a single best trend – Final savings results sensitive to what may seem as small changes in interpreted consumption trend – David Baylon, Bob Davis (Ecotope) were presented this analysis as well and agreed with above assertion There could be many reasons for the observed scatter, including system sizing, duct condition, and lack of knowledge of in-situ HP controls settings – Note: A research strategy to collect more data on that aspect has been approved by the RTF…(coming up) 17

Proposed Methodology: Planning Estimate for NC HP Measures Planning HP heating energy consumption estimate is calculated by dividing eFAF energy consumption estimate by average COP per heating zone The COP for each run is calculated as SEEM electric heating output divided by SEEM electric heating input COP per HZ is calculated as an average of the individual COP for all new construction runs 18

New Construction HP Research Strategy Direction 19 This would be a modification to the existing MH HP Related measures Research Strategy Field audit + Billing data with sufficient detail to develop a NC calibration CAT will further develop this strategy, present it to the R&E subcommittee. Will bring an R&E subcommittee recommended Research Strategy to the RTF

RTF Decision Slide “I ________ move that the RTF: Accept staff proposed calibration curve for New Construction Electric Resistance heating homes in HZ1 and Use Staff proposal to develop savings estimate for HZ2 and HZ3 using calibrated HZ1 consumption and SEEM output for HZ2 and HZ3” 20

Manufactured Home NC: ENERGY STAR Homes & Manufactured Home NC: Ecorated Homes 21

Measure Background Measure Name:MH ENERGY STAR Homes Current Measure Category: Proven Proposed Measure Category: Proven Current Measure Status:Under Review Proposed Measure Status:Active Measure Sector:Residential End Use:New Construction Current Sunset Date:August,

Measure Background Measure Name:MH Ecorated Homes Current Measure Category: Proven Proposed Measure Category: Proven Current Measure Status:Under Review Proposed Measure Status:Active Measure Sector:Residential End Use:New Construction Current Sunset Date:November,

Current Measure Specifications 24 ComponentBaselineEnergy StarEcoRated Ceilings (flat) R-26 R-49 U=0.025 Ceilings (vaulted) R-40 U=0.029 WallsR-13R-21 U=0.055 R-21 w/no trade off & requires insulated header u=0.055 FloorsR-24R-33 u=0.033R-38 Blown-in R-33 u=0.033 GlazingU=0.4U=0.35U=0.3 area weighted avg Appliances built-in BaselineENERGY STAR Dishwasher; ENERGY STAR Refrigerator LightingNo requirement50 % fixture CFL80% fixture CFL Envelope Tightness 5.0 ACH 50 Heating System 78% AFUE Gas FAF; or Electric Furnace; or 7.7/13 Heat Pump 80% AFUE Gas FAF; or Electric Furnace; or 7.7/13 Heat Pump 90% AFUE Gas FAF; or Electric Furnace; or 7.7/13 Heat Pump Duct Leakage13%10%5%

Measure Update Summary Energy Efficiency specifications have had minor changes since last update. – ENERGY STAR homes Vaulted ceilings are R 40, used to be R-38 – Glazing, Ecorated has U0.30 window requirement, used to be U0.33 – 80 % CFL in Ecorated, updated from 50% – No more savings from improved water heater due to update in Federal Standards – Received confirmation from the authors of the spec (Brady Peeks) Updated baseline specifications as per SBW recommendation memo. o Memo recommends using RTF baseline defined in High Performance (HP) MH workbook. o Baseline based on a 2012 report by Northwest Energy Works “High Performance Manufactured Home Project: State of the Industry Report Prepared for BPA.” 25

Measure Update Summary (contd.) Applied RTF approved MH RBSA SEEM Phase 1 & 2 calibration for eFAF to calculate HZ1 savings – Engineering adjustment applied for HZ2 and HZ3 – Used SEEM based annual COP for calculating HP heating energy savings Conducted all simulations in SEEM96 Updated workbook to latest ProCost version. 26

Measure Update - Lighting New Residential Lighting Workbook applied to calculate baseline lighting energy use and energy savings RBSA data used to determine lamp type data per average MH – Total sockets, sockets per lamp type Res Lighting workbook applied to RBSA determined lamp data to calculate baseline energy consumption, savings and incremental cost 27

Measure Update Summary (Costs) Measure costs for appliances and lighting updated using latest RTF workbooks and SIW. Proposed (and current) workbook uses the following as a proxy: – Insulation: SF cost data – Windows: SF and MF cost data – Same approach as approved MH Wx workbook 28

Assumptions Made to Develop Cost Data Window Costs: Measures required installing U-0.30, U-0.35 windows instead of U-0.40 SIW only has costs of upgrade from U-0.35 to U-0.30 SIW upgrade cost was used to extrapolate incremental cost as follows: – U-0.40  U-0.35 = SIW(U-0.35  U-0.30) – U-0.40  U-0.30 = 2 x {SIW(U35  U-0.30)} 29

Assumptions Made to Develop Cost Data (contd.) Insulation upgrade costs in the SIW have a fixed and an incremental component As per SIW, insulation upgrade costs are: $/sf = (Constant) + ∆R x (Slope) For new construction, incremental cost was computed as: $/sf = ∆R x (Slope) – This modification is intended to account for incremental cost of material only 30

Assumptions Made to Develop Cost Data (contd.) Duct sealing costs for new construction assumption unchanged Current cost = $160 – Note: Current cost did not have a source 31

ENERGY STAR Homes: Energy Savings 32 Small Saver Planning Measures

ENERGY STAR Homes: Incremental Cost 33

ENERGY STAR Homes: Cost- Benefit Analysis Results 34 Small Saver Planning Measures

Ecorated Homes: Energy Savings 35 Small Saver Planning Measures

Ecorated Homes: Incremental Cost 36

Ecorated Homes: Cost-Benefit Analysis Results 37 Small Saver Planning Measures

RTF Decision Slide “I ______ move that the RTF approve the analysis for electric resistance heated ENERGY STAR and Ecorated homes for HZ1 and Keep status at active and category at Proven Set sunset date to September 2020 I ______ move that the RTF approve the analysis for electric resistance heated ENERGY STAR and Ecorated homes for HZ2 and 3 and Change category to Small Saver, keep status Active Set sunset date to September 2020 “I ______ move that the RTF approve the analysis for Heat Pump heated ENERGY STAR and Ecorated homes and Change the measures to Planning and Under Review Set sunset date to September

Manufactured Home NC: High Performance Manufactured Homes 39

Measure Background Measure Name:High Performance Manufactured Homes Current Measure Category: Proven Proposed Measure Category: Deactivate Current Measure Status:Active Proposed Measure Status:Deactivate Measure Sector:Residential End Use:New Construction Current Sunset Date:August,

41 ComponentUnitsHigh Performance Manufactured Home CeilingR-ValueR45 (area weighted avg.) WallR-ValueR21 + R5 Foam Sheathing (int. framing) Window U-ValueU-Value0.22 Glazing % of CFA12% DoorU-Value0.2 FloorR-ValueR38 InfiltrationACH VentilationExhaust FanENERGY STAR UoBtu/hr-ft 2 -°F0.040 Heating SystemDHP HSPF 10 & Wall Heaters Cooling SystemDHP SEER 20 Supply Duct Leakage% system flowNo Ducts Return Duct Leakage% system flowNo Ducts Water HeaterEFHPWH Shower Headgpm1.75 LPDW/ft DishwasherENERGY STAR RefrigeratorENERGY STAR Notes: Aggressive building envelope specs Requires both DHP and HPWH

Current State of the Measure In the last 2 years, only 8 HPMH have been deployed in the region; similar participation is forecast for the future Due to high incremental cost, complexities in manufacturing and transporting… these homes are not being aggressively pushed/ championed Northwest Energy Works intends to use the current HPMH spec to develop a NEEM 2.0 spec which would be between the current NEEM and HPMH spec – Expect better uptake for NEEM

Staff Proposal Deactivate this measure Current and projected rate of uptake does not justify continued Staff resource – The current savings estimate will still be on RTF website but not be RTF approved after deactivation Staff will work with Northwest Energy works to develop the NEEM 2.0 measure when the specs are ready – The current HPMH are being monitored, results from this monitoring effort will be essential while developing savings estimate for DHP and HPWH in MH 43

Decision Slide “I ______ move the RTF to deactivate the measure “High Performance Manufactured Homes” 44