International Atomic Energy Agency International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) 22 - 24 October 2013 Vienna, Austria Uranium.

Slides:



Advertisements
Similar presentations
Albania Good practices and Gaps 13 December 2013.
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
National Statement Country II. Current Status of the Country 1. Nuclear power stations are not planned in the county. 2. Widespread of SRS for industrial.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Regulatory Body MODIFIED Day 8 – Lecture 3.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Environmental Remediation National Policy,Strategy and
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Update on progress with development of DS459
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the regulatory body Jiří Veselý, SONS, Czech republic.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Azerbaijan.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
1 ESTABLISHMENT OF REQUIREMENTS Module “National legislation and licensing” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
56th Regular Session of the IAEA General Conference
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
Regulatory Framework for Uranium Production Facilities in the U.S.
Algerian nuclear power programme Status, needs and perspectives T/M on development of nuclear infrastructure of NP programme February, ,Vienna.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Bulgarian Geology and Mining Ministry of Environment and Water.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
The Egyptian Nuclear & Radiological Regulatory Authority (ENRRA)
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy Bilateral screening: Chapter.
Presented by Karina Lopes
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
János Krutzler Hungarian Atomic Energy Authority
Office of Legal Affairs
SESSION 3 Policy Framework
Management of RS/DSRS in Brazil Ademar José Potiens Júnior
SESSION 3 Policy Framework
SESSION 3 Policy Framework
Brazil - Training and Tutoring Feedback Second Coordination Meeting
Nuclear and Treaty Law Section Office of Legal Affairs
ENVIRONET Plenary Meeting Vienna, Austria, 5 – 7 December 2017
USNRC IRRS TRAINING Lecture18
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
Legal and Regulatory Framework for Nuclear Installations in IRAN
بسم الله الرحمن الرحيم Dr. Hany Sallam & Regulatory Activities
Regulatory system in Hungary
Presentation transcript:

International Atomic Energy Agency International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) October 2013 Vienna, Austria Uranium Mine Remediation Challenges in Brazil Arnaldo Mezrahi General-Coordinator Licensing of Nuclear Fuel Cycle Facilities Brazilian Nuclear Energy Commission (CNEN)

Population: 197,755,800 Area: 8,514,215 km 2 6 th economy in the world 7 th Uranium reserves Electricity sector Installed capacity:100 GW Hydro: 74% Oil, gas and others: 23% Nuclear: 3% BRAZIL Malvinas

Eletrobrás Termonuclear S.A. ( ELETRONUCLEAR ) Eletrobrás Termonuclear S.A. ( ELETRONUCLEAR ) NPP´s ANGRA 1,2,3 NPP´s ANGRA 1,2,3 PRESIDENCY OF THE REPUBLIC MINISTRY OF ENVIRONMENT MINISTRY OF MINES AND ENERGY MINISTRY OF DEFENSE MINISTRY OF FOREIGN AFFAIRS Eletrobras Companies (ELETROBRAS) Eletrobras Companies (ELETROBRAS) Brazilian Nuclear Energy Commission ( CNEN ) Brazilian Nuclear Energy Commission ( CNEN ) Brazilian Institute for Environment ( IBAMA ) The Navy Technological Center ( CTMSP ) OTHERS MINISTRIES MINISTRY OF EDUCATION UNIVERSITIES MINISTRY OF SCIENCE, TECHNOLOGY AND INNOVATION Nuclear Sector in Brazil

THE BRAZILIAN NUCLEAR POLICY The Constitution of 1988 of the Federal Republic of Brazil states that the Union has the exclusive competence for managing and handling of all nuclear energy activities, including the operation of nuclear power plants. The Union holds the monopoly of the survey, mining, milling, exploitation and exploration of nuclear minerals, as well as of the activities related to industrialization and commerce of nuclear minerals and materials. The Union is also responsible for the final disposal of radioactive waste. All of these activities shall be solely carried out for peaceful uses and under the approval of the National Congress (Brazilian Constitution).

THE BRAZILIAN NUCLEAR POLICY Brazil has established and maintained the necessary legislative and regulatory framework to ensure the safety of its nuclear installations, including irradiated fuel, radioactive waste management and transport of radioactive materials. The constitutional principles regarding protection of the environment also require that any installation which may cause significant environmental impact shall be subject to environmental impact studies that shall be made public.

Definition: Installation in which nuclear material is produced, processed, reprocessed, used, handled and stored in substantial quantities, to CNEN’s judgment, such as: Nuclear Power Plants, Research Reactors, Uranium and/or Thorium Mining and Milling Facilities, Enrichment Plants, Fuel Fabrication Facilities. Nuclear Installation (Brazil) 6

Brazilian Nuclear Energy Commission CNEN CNEN was created in 1956 (Decree of 10/10/1956) to be in charge of all nuclear activities in Brazil. CNEN is the Brazilian Nuclear Regulatory Body responsible for the Licensing and Control of: –Nuclear power plants; –Nuclear fuel cycle, including Uranium mining and milling; –Research reactors; –Medical, industrial and research installations; –Radioactive waste management; –Transport of radioactive materials.

Rio de Janeiro (2) IRD - Radiation Protection and Dosimetry Institute IEN - Nuclear Engineering Institute Pernambuco CRCN-NE - Nuclear Science Regional Center- Northeast - 66 São Paulo IPEN - Nuclear Research Institute Minas Gerais (2) CDTN - Nuclear Technology Development Center Lapoc - Poços de Caldas Laboratory Goiás CRCN-CO - Nuclear Science Regional Center - Center- West CNEN R&D Institutes (TSO)

2200 employees 49 % university level 12 % Ph.D 17% master of science 16% specialization 4 % undergraduate 51% intermediate level CNEN Staff

The licensing regulation establishes: That no nuclear installation shall operate without a license; The necessary review and assessment process including the specification of the documentation to be presented to CNEN at each phase of the licensing process; A system of regulatory inspections and the corresponding enforcement mechanisms that include the authority of CNEN to modify, suspend or revoke the license. THE LICENSING PROCESS (NUCLEAR)

The licensing process is divided in several steps:  Site Approval - (Site Report);  Construction License - Preliminary Safety Analysis Report (PSAR);  Authorization for Nuclear Material Utilization – (Safeguards) ;  Authorization for Initial Operation - Final Safety Analysis Report (FSAR);  Authorization for Permanent Operation;  Authorization for Decommissioning. THE LICENSING PROCESS (NUCLEAR)

Mining and Processing of ores containing U and/or Th

Mining and processing facility in operation since 2000 with reserves of 100,000 t of U 3 O 8, and a production capacity of 400 t/year of yellow cake. Mining and Processing Facilities in Brazil Today - Caetité Future – Santa Quitéria The largest discovered uranium reserve in Brazil (estimated thousand tonnes of uranium inter- mixed with phosphates)

Past – The first uranium mining and processing facility of Brazil, CIPC, located at the Poços de Caldas plateau, in the state of Minas Gerais –  U was produced to supply the domestic demand (2 PWR-type reactors);  The installation was operated by state-owned company – The Brazilian Nuclear Industries (INB);  Uranium was mined by open pit and the extraction process was sulfuric acid leaching. Mining and Processing Facilities in Brazil

Poços de Caldas Mining and Processing Facilities September, Radioactivity detected in the site; October, Beginning of the Uranium Research; 1 st semester, End of the Uranium Research; May, Beginning of operations; December, End of production; Total Production t de U 3 O 8 “Low” Grade Uranium Deposit : ppm of uranium

Main Characteristics:  Located close to important tourist cities between 2 major drainage basins (Antas & Verde rivers);  The water is used for irrigation and cattle watering. Poços de Caldas Mining and Processing Facilities

Licensing Process (Brazil) Nuclear Installation - Nuclear Fuel Cycle Installations (including Mine and Processing of Uranium) Nuclear installations are subject to both: 1 - A Nuclear License, by CNEN; and (Ministry of Science, Technology and Innovation) 2 – An Environmental License, by the Brazilian Institute for the Environment and Renewable Natural Resources – IBAMA, with the participation of state and local environmental agencies. ( Ministry of Environment )

Licensing Process POÇOS DE CALDAS MINING AND PROCESSING FACILITIES When the nuclear licensing process took place in the late 70’s - early 80’s, no planning was made for the decommissioning phase; Mining and Processing were developed before the establishment of the environmental legislation (1986); At that time, the Operator did not have the legal obligation of presenting an Environmental Impact Statement (EIS) prior the operation of the mining and processing facilities. Legacy

POÇOS DE CALDAS MINING AND PROCESSING FACILITY Therefore, the installation began operating with a nuclear license issued by CNEN without complying with a specific environmental licensing process. This is presently a mandatory step in Brazil (IBAMA did not exist at that time); To address this situation a Term of Environmental Commitment (TEC) was signed by the mining company, IBAMA and CNEN; TEC established that the operator must submit to both regulatory authorities a Impacted Areas Recovery Plan.

 Main sources of contamination:  Tailings Management Facility (TMF) ;  Waste Rock Piles (WRP);  Open Pit Mining Area;  Industrial ore processing and storage facilities.  Chemical plant treatment of the liquid effluent is still in operation. Impacted Areas Recovery Plan

Site characterization and baseline data; The four individual areas ( AREA 1 -Tailings Dam; Area 2 - Waste Rock Piles nº 4 and 8; Area 3 – Open Pit; Area 4 – Industrial Area) assessed in an integral way; ƒWaste characterization; Water & Load balance; Remediation goals and evaluation criteria; Description and assessment of remediation strategy / technical measures; Cost estimation; Time Schedule. Submitted for Approval Impacted Areas Recovery Plan

AREA 3 Open Pit Mining Area AREA 2 Waste Rock Pile 4 AREA 2 Waste Rock Pile 8 AREA 1 Tailing Dam AREA 4 Industrial Area Total Area of the site: 32 km 2

AREA 1 Tailings Dam Drainage area = 0,23 km 2 Total area = 0,86 km 2 Total Volume = 2,4 x10 6 m 3 Total Solid = 2,5 x10 6 t

AREA 2 Waste Rock Pile 4 VOLUME = 15,0 x 10 6 m 3 AREA = 5,7 x 10 5 m 2 HEIGHT = 90 m

AREA 2 Waste Rock Pile 8 VOLUME = 15,5 x 10 6 m 3 AREA = 6,4 x10 5 m 2

AREA 3 Open Pit During Operation Today

Sludge from the acid water treatment D= 2km Total of Removed Rock = 94.5 x 10 6 t Total of Processed Rock = 1.8 x 10 6 t AREA 3 Open Pit

AREA 4 Industrial Area

Some Technical Issues The mining site  high precipitation rates; Considering the generation of Acid Drainage and the high precipitation rates, great volumes of water need to be treated to avoid undue releases of radionuclides and heavy metals into the environment; As a result of the water treatment, large amounts of sludge containing significant levels of radionuclides and heavy metals need to be disposed off; Radiological control of the site is maintained by the Operator, especially at effluent discharge points, in particular from the waste dam and the drainage water treatment units from the mining area and waste rock piles. The lessons learned from the site closure will impact significantly the operation and closure of future uranium sites in Brazil.

Some Considerations Acid Drainage: Results in a very important amount of financial resources spent per year; Additional resources will be needed to implement adequate solutions. Relevant information about the site is dispersed; Decision needed concerning the dismantling of the industrial area and site remediation.

Challenges  A well defined mechanism to ensure adequate funding for remediation.  The assessments and compliance with established safety requirements, e.g., criteria for Unrestricted Release;  Definition of a site for long term storage of the radioactive waste produced during dismantling and/or decontamination of equipment, materials and buildings;  Political and psychosocial aspects involved;  The necessary and appropriate strategy for stakeholder involvement;

Challenges  Unrestricted release x Long-term care;  Inspection and reporting frequency;  Timeliness of actions;  Long-Term Control: A long-term surveillance plan; Criteria for instituting long term maintenance; A structured long- term communication programme; Frequency and extent of monitoring.  Recordkeeping.

Project BRA “Strengthening of the Brazilian Regulatory System to Ensure Alignment of the Safety of Nuclear Fuel Cycle Facilities to the Best International Practices” Last Remarks Overall Objetive To strengthen the Brazilian NFCF regulatory system and general safety culture of stakeholders in order to ensure the safe and peaceful use of nuclear energy and ionizing radiations, by means of: updating or developing specific standards, guides, procedures, code of practices and inspection protocols; improving partnerships among relevant national and international institutions; accrediting laboratories; and assuring clear information related to the NFCF safety to the civil society. Outcome The project goal is to ensure that the Brazilian nuclear licensing of NFCF and environmental management are fully aligned to the best international practices.

“Strengthening of the Brazilian Regulatory System to Ensure Alignment of the Safety of Nuclear Fuel Cycle Facilities to the Best International Practices ” Last Remarks National workshop on the regulatory approach and operational safety of mines, emphasizing underground uranium mines, including regulatory oversight and operational issues; Expert Visit to Brazil to participate on Workshops and discuss the licensing and the regulatory requirements for the safety of mines, emphasizing underground mines. IEX on the following topics: Geotechnical engineering, underground mining engineering, occupational and environmental radiological protection, decommissioning and remediation, accident analysis, safety-related systems, routine operational safety measures, etc. Activities (Ex.):

Thank you for your Attention!