City of Calipatria Rapid Assessment Process Project Strategic Plan City of Calipatria Wastewater Systems Improvements Calipatria, California Presented.

Slides:



Advertisements
Similar presentations
Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Advertisements

Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
Alaska Clean & Drinking Water Funds Financial Capacity Assessment Mike Lewis Program Manager Municipal Grants & Loans Municipal Grants & Loans Alaska Department.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
LOCAL GOVERNMENTS AS AGENTS OF CHANGE John Day Center for Environmental Farming Systems, NC State University.
Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
City of San Juan Water & Wastewater Systems Improvements Hidalgo County, Texas Presented to: Project Sponsor and Agency Stakeholders July 24, 2003 City.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
2 Water and Waste Loans and Grants United States Department of Agriculture??? Rural Development: Mandate to improve the quality of life in Rural America.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Rapid Assessment Process Project Strategic Plan City of Alamo Municipal Water and Wastewater Project Hidalgo County, Texas Presented to: Project Sponsor.
Connecticut Department of Energy and Environmental Protection.
Prioritization of Drinking Water and Wastewater Projects Project Application – Region 6.
Innovation Strategies Presented to MODE January 2014.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Niland Sanitary District Rapid Assessment Process Project Strategic Plan Niland Sanitary District Wastewater Systems Improvements Niland, California Presented.
Rapid Assessment Process Project Strategic Plan Doña Ana MDWCA Water and Wastewater System Improvements Doña Ana County, NM Presented to: Stakeholders.
RURAL DEVELOPMENT WATER & WASTE PROGRAMS WATER AND WASTE FACILITIES WATER SYSTEMS OR COMPONENTS OF WATER SYSTEMS SEWER SYSTEMS OR COMPONENTS OF SEWER.
City of Lordsburg Rapid Assessment Process Project Strategic Plan City of Lordsburg Water and Wastewater System Improvements Lordsburg, New Mexico Presented.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
1 World Water Congress and Exhibition - Montréal, Canada WATER AND POWER UTILITY PUBLIC SECTOR FINANCING Presented by: James B. McDaniel, Senior Assistant.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Rapid Assessment Process Preliminary Project Plan City of Alpine, Texas Public Water and Wastewater System Improvements Presented to: Texas Agencies February.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
City of San Luis, Arizona Rapid Assessment Process Project Strategic Plan City of San Luis Water & Wastewater Improvements Yuma County, Arizona Presented.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
NADB, INFRASTRUCTURE AND COMPETITIVENESS. 2 Raúl Rodríguez MEXICO’S COMPETITIVENESS DECLINE ( IMD’S RANKING AMONG 60 ECONOMIC REGIONS; 1 = BEST ) Source:
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Rapid Assessment Process Project Strategic Plan Village of Columbus Water Supply and System Improvements Luna County, New Mexico Presented to: Stakeholders.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
September 23, 2005 Local Hazardous Waste Management Program in King County Washington Program Funding.
Mejoras en los sistemas de Agua Potable y Saneamiento en San Benito, Texas Water and Wastewater Facility Improvements in San Benito, Texas.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
1 Public Hearing User Rate Adjustments April 8, 2008.
Department of Environmental Quality Water Infrastructure November 17, 2015 Water Infrastructure Funding to Financing.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
1 Indiana Department of Environmental Management Budget Presentation FY
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
City of Burlingame Housing Element Update Community Workshop # 2 | May 20, 2014.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
February 21, General Information Utility staff is not aware of any mandate from city ordinance or state statute to provide water and sewer services.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
FY 2017/18 General Budget Workshop
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
City of Roundup, Montana
Public Hearing Sanitary Sewer Fees
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
SEWER DEPARTMENT BUDGET WORKSHOP
Chino Basin Water Bank Development
Presentation transcript:

City of Calipatria Rapid Assessment Process Project Strategic Plan City of Calipatria Wastewater Systems Improvements Calipatria, California Presented to: Project Sponsor and Agency Stakeholders November 6, 2003

City of Calipatria Rapid Assessment Process Project Strategic Plan  General Aspects  Environmental and Human Health Indicators  Environmental, Human Health and Sustainable Development Strategies  Technical Approach, Objectives and Funding Plan  Public Participation  Project Development Schedule Agenda

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects The City of Calipatria:  Located in eastern California, in Imperial County;  Approximately 150 miles east of San Diego;  Approximately 35 miles north of the U.S./Mexico Border. Project Location Calipatria

City of Calipatria Rapid Assessment Process Project Strategic Plan  City of Calipatria  Population: 7,289 (Census 2000) Includes Calipatria State Prison (CAL) population of 4,151 inmates  Median Household Income (Census Data): $30,962  Unemployment Rate: 13.1% Excludes prison population  Existing Facilities  Wastewater  850 Sewer service connections;  Service provided to CAL Prison  Water  Privately owned by Southern California Water Company;  Ineligible for grant funding. General Aspects Project Sponsor Profile

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects  Existing  Distribution system is owned and operated by the Southern California Water Company;  Water obtained from Imperial Irrigation District;  Non-metered service; Customers pay a flat rate of $41.78 / month Existing Water Treatment, Storage, & Distribution System  Concerns  System pressure was increased to serve the prison and resulted in line breaks;  Difficulty determining illegal connections due to non-metered service;  Public perception is unfavorable with a general distrust for rate increases and lack of service.  Current Improvements  Water Treatment Plant Expansion to satisfy Enhance surface Water Quality Rule;  Construction of transmission main to Niland to service both communities.. Water system privately owned and is ineligible for grant funding to develop improvements.

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects  Collection  Existing system consists of 92,000 linear feet vitrified clay and PVC pipe;  Approximately 99.9% of population served (850 service connections);  Lift Station  One lift station with wet well/dry well configuration;  CAL Prison maintains lift station and bar screen with dedicated sewer main to Calipatria WWTP; Condition is undetermined but no problems reported.  Treatment  The City of Calipatria has an aeration pond system;  Average design flow 1.70 MGD;  Currently operating at 0.85 MGD 60-70%;  Designed to treat domestic wastewater;  Expanded in 1990 to accommodate CAL Prison. Existing Wastewater Collection and Treatment System

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects  Collection  Sewer mains constructed over fifty years ago;  Numerous line breaks within past eighteen months;  Existing manholes require repair and/or replacement;  Groundwater infiltration into collection system is suspected due to elevated levels of pollutants at the WWTP.  Lift Station  No emergency provisions;  Power interruption results in surcharge at residences;  Lack of ventilation creates potentially hazardous environment.  Treatment  Absence of screening results in blockage throughout plant;  Elevated levels of cyanide, selenium and thallium with source unknown;  E. Coli detected in plant effluent;  Overflow at ponds observed; Minimal maintenance has possibly decreased the pond capacity and liner condition is undetermined;  Numerous violations issued for BOD 5 and E. Coli;  Prison flow quantity and composition is unverified, screening is inadequate with typically higher solids (trash, etc); current contract does not have any provisions for safeguards. Wastewater System Deficiencies

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects Evaluation and inspection of the existing system will assist in selecting and implementing the necessary improvement to include the following possible alternatives:  Collection  Rehabilitation/Replacement of existing system;  Install clean-outs at the dead ends.  Lift Station  Construction of a new lift station or rehabilitation of the existing with sufficient redundancy;  Provide stand-by power.  CAL Prison lift station to install new screening; consider renegotiating the contract with the prison.  Treatment  Construct testing laboratory as appropriate for process control;  Screen influent and provide additional mixing aerators;  Clean ponds and improve water transfer between ponds;  Provide stand-by power;  Reuse of treated effluent. Proposed Wastewater System Improvements Total Estimated Cost - $TBD

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects Existing System

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects Existing System

City of Calipatria Rapid Assessment Process Project Strategic Plan General Aspects Existing System

City of Calipatria Rapid Assessment Process Project Strategic Plan Environmental and Human Health Indicators Environmental Indicators  Levels of E. Coli, violating state regulations have been observed in effluent and may pose potential health risk downstream of discharge  Existing plant not designed to treat cyanide, selenium and thallium at the WWTP and discharge within the effluent may be occurring;  Lack of maintenance at plant may have reduced capacity thus reducing efficiency and worsening conditions above;  Numerous lines breaks and manhole leaks have created nuisance condition throughout Calipatria;  Potential groundwater contamination may affect environmentally sensitive areas including farmland, habitats for protected species and water bodies including the Salton Sea.  Elevated Levels of BOD 5

City of Calipatria Rapid Assessment Process Project Strategic Plan Environmental and Human Health Indicators Compliance with Environmental Norms & Regulations  Water System  Metering required;  Improve THM and turbidity levels  Wastewater System  Administrative Civil Liability Complaint issued by California Regional Water Quality Control Board for numerous violations;  Majority of violations related to BOD 5 in effluent; Also E.Coli detections;  Calipatria agreed to complete compliance projects as an alternative to paying the assessed fines;  Under the CP program Calipatria is obligated to spend an equivalent amount toward approved improvements.

City of Calipatria Rapid Assessment Process Project Strategic Plan Environmental and Human Health Strategies  Present an acceptable Compliance Project to Water Control Board.  Determine the CEQA/NEPA document requirements, an EIS or EA.  Analyze the chemical composition of the wastewater and groundwater to determine the nature and possible source of contaminants existing at the WWTP.  Conduct an analysis of the WWTP influent to detemine the sufficiency of oxygen as it is introduced in the treatment process.  Verify the quantity and existing chemical make-up of the prison contributions and the existing screening methods to eliminate potential source of pollutants. Establish a pretreatment program and renegotiate the contract with CAL Prison.  Describe the environmental and human health risks associated with the deteriorated conditions of the existing collection system infrastructure as well as with the WWTP and effluent violations and develop a comprehensive O&M Program

City of Calipatria Rapid Assessment Process Project Strategic Plan Sustainable Development Strategies  Two stakeholder workshops to be conducted. The baseline conditions report is complete.  Demonstrate appropriate institutional capacities:  Establish permanent operation staffing Regional Operations – Shared operators with Niland Sanitary District/other.  Seek Training NADB UMI; Operator and administrative development  An operation and maintenance program will be developed as part of the project.  Coordinate with water provider to develop a water usage assessment, including possibilities for conservation/reuse.  Determine if there is a need for industrial pretreatment.  30% design review by system operator

City of Calipatria Rapid Assessment Process Project Strategic Plan  Provide the City of Calipatria with adequate, affordable wastewater service in compliance with State regulations;  Rehabilitation of existing centralized wastewater collection system and improvement to existing treatment facilities; Technical Approach,Objectives and Funding Plan Project Objectives

City of Calipatria Rapid Assessment Process Project Strategic Plan Recommended Technical Approach Technical Approach,Objectives and Funding Plan PDAP Eligible Tasks:  Preliminary Engineering Report  Quality Assurance Program Plant (QAPP)  Environmental Report – Complete comprehensive multi-agency environmental checklist  Financial Analysis  Public Participation Program  Final Engineering Design Non-PDAP Eligible Tasks:  Rate study.  Training and institutional strengthening.  Contingency Plans  Project Management  Operation and Maintenance Plan

City of Calipatria Rapid Assessment Process Project Strategic Plan Institutional Capacity The Frank M. Tejeda Center has been contacted to prepare a Statement of Institutional Capacity of the City of Calipatria addressing the following : Technical Approach, Objectives and Funding Plan  Regulatory Compliance Issues  On-going Projects and Planning  Existing Planning  Project Development and Funds Management  Outsourcing  Operational Capacity  Management Capabilities  Governance Institutional Development RAP Recommendations:  Administration/Operations Staffing – Potentially Regional Effort  Training

City of Calipatria Rapid Assessment Process Project Strategic Plan Project Sponsor Financial Potential Technical Approach, Objectives and Funding Plan  City Revenue generated by imposing a sales tax.  Designated as a Federal Enterprise Zone;  Maintains full-time staff to include City Manager, Police and Fire Chiefs and Planning Administrator and three utility personnel;  Fiscal year from July 1 st to June 30 th for each year; Current Rate Structure  850 service connections;  Average monthly CAL Prison $22, Operating Revenues426,377395,523426,565 Operating Expense367,415287,100291,009 Total58,962108,423135,556 Wastewater Fund Average Monthly Bill  Average Sewer$22.05  Garbage Collection$15.95 Total$38.00

City of Calipatria Rapid Assessment Process Project Strategic Plan Identified Potential Funding Sources Technical Approach, Objectives and Funding Plan  USDA-RUS  Colonias Grant and Water and Waste Disposal Program – currently not a colonia.  Water and Waste Disposal Program.  USDA-RD – In 1976, the City received Sewer Revenue Bonds in the amount of $247,000. To date, the City owes approximately $162,000 on this loan.  California Housing and Community Development (HCD)  CDBG Fund - Grants for cities with population <50,000 maximum $500K  CDBG Program Planning and Technical Assistance Grants – Providing funds to small cities for planning and evaluation studies related to CDBG-eligible activity.  State Water Resources control board (SWRCB)  Small community Grants – Provides grants up to 97 ½ % with population < 5,000;  State Revolving Fund – Loans for construction maximum $50M and 20 year payback and received a $263,000 water improvements grant in June  California Infrastructure and Economic Development Bank (I-Bank)  Infrastructure State Revolving Fund (ISRF) Program – Loans for construction maximum $10M and 30 year payback.  NADBank  BEIF to support construction, service connections, project management and rate transition. A rate study and additional capacity building tasks may be funded through the IDP.  BECC  The City is eligible through the Project Development Assistance Program (PDAP).

City of Calipatria Rapid Assessment Process Project Strategic Plan  Approval by regulatory agency for Compliance Project;  Largest obstacle is cost associated with repaying loans;  Public perception is unfavorable with general distrust for rate increase and lack of service;  Land acquisition for the new lift stations and wastewater treatment improvements. Potential Obstacles Public Participation Strategy Local Politics  General Law City with a City Manager form of Government;  Government structure consist of a mayor, Mayor Pro-Tem, three City Council positions and one city clerk.  Local organizations: Chamber of Commerce, small businesses, the Calipatria Unified School District, Imperial County. Socio-Economic Indicators  Approximately 17.5% of the population, over the age of 25, has completed a high school education;  2002 Labor Market Information denotes 2.4% unemployment (excludes prison).

City of Calipatria Rapid Assessment Process Project Strategic Plan Project Schedule

City of Calipatria Rapid Assessment Process Project Strategic Plan  Modify PSP with Final Comments – 11/21.  Develop Scope of Work (SOW),  Send Sample TA Agreement to City. BECC Action Items Project Sponsor - Calipatria  Provide any additional comments – 11/12.  Letter accepting PSP and recommended TA Tasks.  Participate in development of SOW – approve SOW by letter.  Invite participants for Steering Committee. Stakeholder Agencies  Provide any additional comments – 11/12.  Participate in SOW development – approve SOW.