Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.

Slides:



Advertisements
Similar presentations
NIMAC Operations: The File Certification Process June 24, 2008 Nicole Gaines.
Advertisements

Workflows in Archie IMS Support Person: Sonja Henderson
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
SVAC/ISOCInstrument Analysis Meeting, April 21, 2006 Anders W. Borgland 1 LAT Data taking! Anders W. Borgland Science Verification, Analysis and Calibrations.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
Building a XanEdu CoursePack Copyright 2004 ProQuest Information and Learning Company. All rights reserved.
Windows Basics: Desktop, Taskbar and Window
ArcGIS Workflow Manager An Introduction
Database Alerts and Persistent / Durable Links  Alerts are notifications regarding additions to the database  Persistent or Durable links are links that.
CERN - IT Department CH-1211 Genève 23 Switzerland t Monitoring the ATLAS Distributed Data Management System Ricardo Rocha (CERN) on behalf.
September 10, Agenda Welcome Updates Reminders New CT.gov Site Questions & Comments.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
Nurtured Until It Hatches.  Seller A  Buyer A Lifebushido.
Additional training resources
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Execute Workflow. Home page To execute a workflow navigate to My Workflows Page.
Offline shifter training tutorial L. Betev February 19, 2009.
News Ted & Kirsten June 10, 2005 TDWG. Meet Trigger Reps today? Exotic Trigger Reps: Vadim and Oscar doing great work QCD Trigger Rep: Mary herself EWK.
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
PA APCO 2009 Special Training Conference Tracy Simmons July 16, 2009 Public Safety and Homeland Security Bureau.
16 Ways To Take To Work. How Would You Use PBwiki At Work? Over 1,000 non-business users were surveyed How would you use PBwiki at work? All responses.
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
INFO1408 Database Design Concepts Week 16: Introduction to Database Management Systems Continued.
October 8, 2002P. Nilsson, SPD General Meeting1 Paul Nilsson, SPD General Meeting, Oct. 8, 2002 New tools and software updates Test beam analysis Software.
DDM Monitoring David Cameron Pedro Salgado Ricardo Rocha.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Robust Real Time Face Detection
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Supplier Capacity Worksheet User Instructions September 2015 Revised December 2, 2015.
CharMeck.org Contributer Training SharePoint 2013 Orientation and Basic Training.
PRESERVING YOUR PAST AND YOUR PRESENT FOR THE FUTURE.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
Analysis Trains Costin Grigoras Jan Fiete Grosse-Oetringhaus ALICE Offline Week,
UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari March 20, 2014.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
Control Room and Shift Operations: CMS Greg Rakness (CMS Deputy Run Coordinator) University of California, Los Angeles ATLAS Post-LS1 Operations Workshop.
1 Detector Monitoring requirements ( V.Dattilo for the EGO Operations Group ) ( with the collaboration of S.Braccini)  Short history  Current status.
Management hoo-hah Created short list for DPG coordinator ( ) – Talked with several people to converge on the list – Tiziano now has the list and.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Offline shifter training tutorial
“Golden” Local Run: Trigger rate = 28Hz
Experience between AMORE/Offline and sub-systems
Offline shifter training tutorial
مفاهیم بهره وري.
CSC Shift Training and Operation + B904 Status
Presentation transcript:

Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today by both experiments.

Integrated luminosity at  s = 8 TeV 31 July 2012G. Rakness (UCLA)2 We have collected another ~60% more data since the Higgs dataset was closed… Data taking efficiency over the year = 93% Data taking efficiency since dataset closed = 96% Note to Chris: RPC trigger bad for ~160/pb Fills 2812 and 2816

Cleaning up shift instructions If something goes wrong during the run, the DAQ shifter is supposed to follow the Shift News appropriate for the subdetector – Example snippet of text from CSC… 31 July 2012G. Rakness (UCLA)3 … and this is one of the more straightforward descriptions… (!) It is a wonder that we ever recover from problems… The only reason we do is that there are only a few actual actions that can be done… … next page

Display all shifter actions in one page? 31 July 2012G. Rakness (UCLA)4 Christophe and I have proposed a matrix like the following to the DAQ group… Initial reaction from DAQ group: “We like it!” … So we will see how this progresses…

Database check at p5 As of now, an audible alarm sounds in the control room if there is a problem in the database – Thresholds for a set of “test queries” – If one of the queries stays above the lower threshold for more than ~5 minutes  audio alarm in the control room 18 July 2012: test of notification and audible alarms – Lowered thresholds to a ridiculously low value, and waited for reaction from ICINGA. Audio alarm within ~5 minutes – Thresholds/configuration to be tuned to minimize false-positives and to optimize reaction time Next step: get input from subsystems – Input = representative set of queries done at run transitions (i.e., Initialize, Configure, Start, Halt,…) with the idea that these are the critical queries needed to get the system Running… I made a presentation on this yesterday at the Run Meeting… Will send out to commissioning hypernews tomorrow… 31 July 2012G. Rakness (UCLA)5

ALCT slow control firmware testing Failed to make svf/xsvf files – Needed UCLA to make them for me Failed to get VME loading going at 904 – Need Karoly to get version of Yellow page/XDAQ… hopefully he can get this running before I get back from vacation… 31 July 2012G. Rakness (UCLA)6

To do Run Coordination – Rework shift leader training – Make shift summary Elog template for shift leader Finish ARC work on Contact Interactions – Collaboration Wide Review ends this week CSC – Put firmware into SVN – Document ALCT/CLCT muonic timing – RAT firmware loading As well… – Make neutron skims 31 July 2012G. Rakness (UCLA)7