IWMM Update July 2011 Update on status of program Feedback on Pilot Season Protocol changes Protocol validation Database changes Coordination through Fall.

Slides:



Advertisements
Similar presentations
OASIS/PeopleSoft Communication and Coordination Meeting September 5, 2007.
Advertisements

Monarch Larva Monitoring Project Goals and Roles.
Traditionally relied on MWI Random transect aerial survey –Reinecke et al. (1990) –Pearse et al. (2005) –State agencies continuing work MDWFP (2005-present)
‘opac 2.0’ and design hub web 2.0 enabled Emu collections sebastian chan manager, web services powerhouse museum sept 2006 lynne mcnairn emu administrator.
Girl scouts river valleys Welcome to 2015 Early Bird Registration River Valleys will start the webinar at 12:00 p.m. Please mute your phone by pressing.
1 State of Connecticut Core-CT Project HRMS Training Registration July, 2003.
Winning Strategies for Customer Service & Programs
Andy Wood Univ. of Washington Dept. of Civil & Envir. Engr. Statistics related to the merging of short and long lead precipitation predictions in the continental.
Graduate System for Management of Admissions, Alumni & Records Tracking (Grad SMAART) January 8, 2007 Office of Graduate Studies.
ECommerce Project. The Team Project Sponsors: –Shelagh Holm, Director of Administrative Information Systems –Ron Ritter, Assoc Director and Treasurer,
OVERVIEW OF MDA’S ANNUAL LEGISLATIVE DAY January 2015.
Wisconsin Bird Conservation Initiative (WBCI) Citizen Science: Past, Present, and Future Efforts in Wisconsin Bill Mueller and Andy Paulios.
Nutrition Cluster - South Sudan Nutrition Cluster Coordination Meeting UNOCHA conference hall. 11:00 am -12:30 pm.
EPA Update- Bob Judge Maine Air Quality Monitoring Committee April 18, ) NAAQS schedule 2) Budget 3) Technical Systems Audit.
Pay Frequency Change Web Time Entry (WTE) Babar Khan Director, Payroll Services Jeff Deitiker Assistant Director, Payroll Services
STORET and the Water Quality Exchange Status Update Dwane Young OWOW/AWPD/MB April 26, 2007.
NAB Planning area Bristol Bay/Alaska Peninsula Avian Crossroads and Destination Bill Larned Chris Dau U S Fish and Wildlife Service.
What’s happening and what to expect OSAP Recipient Meeting August 27, 2013 THE NEW MEXICO COMMUNITY SURVEY FISCAL YEAR 2014.
1 IPM PIPE Training May 14 th, 2007 PIPE DATA ENTRY FOR EXPERIENCED USERS : Changes in data entry for 2007 Julie Golod IPM PIPE, Penn State University.
BackForward HPHConnect Making Employee Health Benefits Easier to Manage. Set up your HPHConnect account today by calling your broker or your Harvard Pilgrim.
Agricultural Education. Georgia Ag Ed Pathways Peach State Pathways PathwayDevelopment Date Implementation Date Phase I Agriscience
Mary Marek Robotics Coaches Meeting Building robots…. Building students.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
STEM support project in London Update Adrian Fenton STEM Partnership Manager for London
Incident Management PCCYFS June 27, 2007 Incident Management for the Office of Children, Youth and Families.
CTSI: IU SCHOOL OF MEDICINE CORES COMMUNICATION PLAN JULIE HUANG TOM GOODWIN NATALIE BASICH.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
The Initiative For School Empowerment and Excellence (i.4.see) “Empowering teachers, administrators, policy makers, and parents to increase student achievement.”
Integrated Waterbird Management & Monitoring Program IWMM Andy Wilson USGS Patuxent, Laurel, Maryland
Implementing conservation and adaptive learning in times of environmental uncertainty Restoring Shrublands for Priority Species Nancy Pau, Kate O’Brien,
National Aquatic Resource Surveys Wadeable Streams Assessment Overview November, 2007.
Project Updates Maine Quality Forum Advisory Council June 14, 2013.
 Council votes 11-4 in favour of the garbage and recycling master plan CITY HALL - OCTOBER 19, 2011.
WISKI Open Water and Ice Bernard Trevor, M.Eng. P.Eng. River Forecast Section Environment and Sustainable Resource Development WISKI ESRD Users Conference.
Reporting Updated 05/2014. Handbook References Chapter 3: Administrative Guidance – Demographic Report – Match Report – Annual Report – Deaf and Hard.
July 2009 Agricultural Education FY 2010 Budget Update GACTE Conference July 21, 2009.
Tools to Inform Protection, Restoration, and Resilience in the Hudson River Estuary The North Atlantic Landscape Conservation Cooperative (LCC)
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
Vermont WIC MIS/EBT Implementation Readiness Coordinator Network July 25, 2013.
New York State DOH Health Home Care Management Reporting Tool (HH-CMART) Support Calls – Session #3 March 6,
Howard High School.  Coach Wade (Head Girl’s Coach)  Coach Dickerson (Head Boy’s Coach)
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
NCMP Collecting…Validating… Sharing Robert Dobson & Peter Knighton.
QUESTIONNAIRE AND SPREAD SHEET PRINT SCREENS By Olivia Acus.
MyEdge Overview Comprehensive and Easy Customer Portal.
NCI Clinical Trials Reporting Program CTRP User Meeting May 4, 2011.
Preparedness Package for Refugee Emergencies 1 PPRE Part 2: Risk Analysis and Scenario-Based Planning.
Drought Activities at the NOAA Midwestern Regional Climate Center Michael A. Palecki Illinois State Water Survey Champaign, Illinois.
Howard High School.  Mr. Larry Kinsey Mr. Larry Kinsey  
Coordination, management and visualization of monitoring data in the Avian Knowledge Network Michael Fitzgibbon, Point Blue Conservation Science Leo Salas,
6/13/2016 U.S. Environmental Protection Agency 1 Starting a Facilities Flow Lee David
Migratory Bird Treaty Centennial Celebrating 100 Years of Bird Conservation… and Launching the Next Generation March 10, 2016 Partners Forum Webinar #2.
AdisInsight User Guide July 2015
A FRUIT AND VEGETABLE PRESCRIPTION PROGRAM
Anna Harms December, 2013 Trainer Notes:
Financial Capability Integration Project
An Introduction to VegDRI
All Wales Safeguarding Procedures Review Project
Integrated Waterbird Management & Monitoring (IWMM)
2014 WIC EBT Users Group Implementing EBT & MIS Together
Recruiting and Staffing Update / SEP 2.0 July 2003
Maryland’s Online IFSP Database
Mapping Avian data for Westcave Circle Christmas Bird Count
Now Hiring Customer Service Billing Representatives
State Climate Office Drought Update
Right place, right time Working to improve hospital discharge and prevent admissions in South Tyneside South Tyneside Patient Reference Group August 2016.
Representative sampling Overview of the questions received by the ESF Data Support Centre Alphametrics Ltd. & Applica Sprl. Brussels, 13 March 2015.
Now Hiring Customer Service Billing Representatives
School Counseling Update
Presentation transcript:

IWMM Update July 2011 Update on status of program Feedback on Pilot Season Protocol changes Protocol validation Database changes Coordination through Fall Update on modeling

Update on status of program Moving from “Pilot Phase” to “Setup Phase” Tasks for Setup Phase (next 2-3 years): Validate Protocols Refine Protocols Develop online database Develop fully integrated model Develop decision tools

Feedback on Pilot Season FWS Region/state # units # whole area counts # veg surveys # point count locations # point count surveys Region 3 - Midwest Region 4 - Southeast Region 5 - Northeast Total Survey data – end Sept 2010 to end Feb 2011 (spring 2011 still being rolled together)

Do metrics make biological sense? Water depth category guild Swans & geese Dabbling duck Diving duck Wading birdsshorebirds Dry Saturated/mudflat " " " >48"

Didn’t change between surveys at 75% of sites Jump from low to high unlikely? Do we need to record more than once? Change in Stem Density between 1 st & 2 nd veg surveys (n=123 units) 2 nd survey LowMediumHighTotal 1 st survey Low Medium High Total Are changes in metrics logical?

Seed Head Index Low Medium High

% cover% height% preferred food 30 SAV0<1"20% near tall edge 2 Open water201"-6"10Stem density High Annual356"-1'25Seed Head Index Medium Perennials451'-2'5Interspersion Medium Bare02'-10'15 10'-30'20 >30'5 VA003CE_SADA1_ _3

Protocol Update No point counts Bi-weekly counts OK Flush counts OK (but not required) Clarifications, e.g. – Ice cover, clarification with water depth – Stem Density, within vegetated areas – Young birds, guidance on when to include – Flooding regime

Survey Schedule Black bars = main survey periods (weekly or biweekly bird counts)Hatch bars = secondary bird survey, counts could continue if migratory water birds are present, survey frequency can be reduced (biweekly or monthly) 1 = First spring vegetation survey (start of spring waterfowl migration) 2 = Second spring vegetation survey (just before peak of spring shorebird migration) 3 = First fall vegetation survey (peak of fall shorebird migration) 4 = Second vegetation survey (peak of seed production, before start of main waterfowl migration)

Protocol validation Hopefully going to team with EPA Compare our ocular estimates with more comprehensive NWCA Employ roving field techs Might ask for assistance from participants – Note this will be entirely voluntary – Would involve just one IWMM Veg survey at a site surveyed by EPA

Database changes Online database development likely in2012 Will continue using Access database Need for participants to query their own data Some minor changes New “front end” will be sent to all partners in August – a quick and easy update You’ll retain all existing data

Coordination through Fall Use Ning website for Q&A Contact Andy Wilson through Ning (PM) Otherwise, primary regional contacts: Brian Loges, Upper Miss (3) John Stanton, Lower Miss & South Atlantic (4) Bill Thompson, North Atlantic (5)