Pitot Static Training First Line Maintenance. P/S Testing Precautions b b 1.Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious.

Slides:



Advertisements
Similar presentations
Sustainability is Good for Business MAINTENANCE DEPARTMENT.
Advertisements

By Thomas. To make a awesome cool water saving device.
The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different,
Cable Probe. Safety First System can conduct electricity Do not use in flammable atmosphere Use proper personal protective equipment.
H.E. Anderson Company Maintenance Tip How to Replace a Chemical Side Diaphragm This presentation will show you how to change a chemical side diaphragm.
RANGE GUARD / GAYLORD HOOD.
Chapter 11, Section 4. Changing a Shower Head 1.Turn off the water. 2.Remove the old showerhead. 3.Clean the showerhead stem of any corrosion or buildup.
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
TrueSTEAM™ Humidification Systems Module 4: Advanced Installation.
A Bad Atmosphere Can be deadly Requires a respirator.
 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.
Better Safe Than Sorry A WORLD THAT STARTS WITH ELECTRICAL HAZARDS AND SAFETY. ELECTRICITY IS A VERY SERIOUS BUSINESS AND THE EFFECTS ON THE HUMAN, ELECTRICAL.
Engineer Training XL1500 Safety System. Engineer Training XL1500 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Dennis Sabre Fire Appliances
Objectives : ANALYZE home maintenance techniques.
Managing Multimedia Equipment 一般電子科技空間使用安全原則 科技設備操作須知.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Cut twill tape. Mark seam allowance and then pull 1 cm as shown.
NOAA Humidifier – smaller (lower flow) version (yours will have larger tubing and fittings) Ribbon heater Thermal cutoff switch Swagelok reducing union,
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop for WSPs and the Field Monitors Training Workshop Engineering Options.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
General Industrial Battery Safety Changing and Charging Storage Batteries (g)  Battery charging installations shall be located in areas designated.
Aircraft Ice Protection Systems
The JTC Claw Sling Kit, Assembly Sling Kit includes: One “Quick Release” Sling 2 – 4” adhesive backed Velcro “Loop Tape” 2 – 7” Double Sided Velcro straps.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Floating Head Heat Exchanger
Plumbing Green Application 2. Key Lessons from Plumbing In Plumbing, we learned about: Tool and equipment use, safety, and maintenance Fixtures and plumbing.
Health & Hygiene/ELB Sample LOCKOUT/TAGOUT “APPROVED” TRAINING.
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
Current Electricity and Electric Circuits
Director Rules and Field Support October 30, 2006.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
MFL MFL Corrosion Detection Floor Scanner MFL 2000.
Turn Side Walker 1 Start Side Walker 8 Chief Judge ____________________ ____________________ Head Timer ____________________ ____________________.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
Switches in Series A heating system is a practical circuit used in homes which has two switches in series. The thermostat switch opens (OFF) when the temperature.
Machinery Cooling Water System Locations and Operations.
Front Office Panic Alarm Awareness Training The front office “Panic Alarm” switch is located under the counter. It looks like this: To turn on, put your.
ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Water & Energy Efficiency In Recreation Facilities.
7 A/C System Components, Operation, and Service.
Quiz on Laboratory Safety
INSTALLATION MANUAL FATL Machine Installing: ACTIVITY CHECK POINT 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3.
Plumbing system fundamental and design course
14 Refrigerant Recovery, Recycling, and Recharging.
SAFE WORK INSTRUCTIONS
GENIX 1/2.
Objectives : ANALYZE home maintenance techniques
Materials   Why have you chosen these—how has your research and tests determined your choice? Cost How much will the materials cost or you will be willing.
7thSense Design Delta Media Server
Outcome 4 Mechanical central heating controls Unit 208: Central heating systems.
Electronic Game.
A More About Heating And Cooling Systems
Fluid Sampling Made Simple OilScan
Mechanical Dimensions
ريكاوري (بازگشت به حالت اوليه)
Static Electricity.
Consulting Captains, LLC
Floating Head Heat Exchanger
كار همراه با آسودگي و امنيت
Creating Electrical Circuits
Water Quality Maintenance – for the prevention of Legionella
Bridling This presentation has been produced by Ausintec Academy (OnlineHorseCollege.com) for purpose of Educational Training. It is not for sale and.
Mechanical Dimensions
Presentation transcript:

Pitot Static Training First Line Maintenance

P/S Testing Precautions b b 1.Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious way b b 2.Ensure static heat switch off if equipped and as above b b 3.Ensure drains are identified and ensure are in closed position, perhaps open drains and inspect for water b b 4.Fit pitot adapter to pitot head and tape off and flag drain holes b b Fit static adapter to side of a/c if fixture is available; with some a/c it is acceptable to tap into drain fitting. - Inspect static parts at this time for deformation / corrosion. Tape off and flag any unused static ports.