1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Accelerator Commissioning
1 BROOKHAVEN SCIENCE ASSOCIATES Systems for Accelerator Operations Safety Erik Johnson ASD Deputy Director and Interface Manager NSLS-II ASAC Meeting October.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Booster and Transport Lines F. Willeke for T. Shaftan 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Installation Gregory Fries, Project Engineer 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Ferdinand Willeke Director, NSLS-II Accelerator Systems NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ELENA installation progress F. Butin / ELENA collaboration.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
CBETA Technical Review
CLEX* Status and Plans CTF3 complex CLEX
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Advanced Research Electron Accelerator Laboratory
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project February 1-2, 2012

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Phasing of Installation Storage Ring Installation Progress Injector Installation Progress Schedule & Status Labor Profile Photon Division Installation Integrated Testing Overview Challenges Summary

3 BROOKHAVEN SCIENCE ASSOCIATES Phasing of Construction and Installation Temp walls constructed separating BOD segments Installation and testing within these segments Components will be staged on experimental floor 1 2 B RF L Beneficial Occupancy AreaOriginal Date Actual/New Date Pentant 1 1-Feb-1114-Mar-11 RF Building 23-Mar-1116-Jun-11 Injector Building 18-May-1112-Aug-11 Pentant 2 2-Jun-1121-July-11 Pentant 3 27-Sep-1121-Oct-11 Pentant 4 28-Nov-1121-Dec-11 Pentant 5 9-Feb-1213-Feb-12

4 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring P1 Installation Highlights 12 multipole & 2 dipole magnet/girders installed Cell 25 fully populated with magnets; survey & bellows installation to start with bakeout to follow All cables pulled (excluding front ends) Cable termination & power supply installation in process Rack tie-in to PCW complete AC power work complete & tested Vacuum component installation in process DI pump skid complete in Feb. EPOCH 3 survey in process PPS interlocks wiring in process Many install resources focused on linac

5 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring P1 Photos

6 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring P2 & P3 Installation Highlights Pentant 2 AC power work complete Racks installed; tie-in to PCW in process Rack shelving & equipment installation in process Cable pulling in process (Quads complete) Floor plates installed DI piping complete (Torcon) Pentant 3 Beamline AC boxes installation in process Rack installation in process DI piping in process (Torcon) Pentant 4 Cable tray installation in process (Torcon)

7 BROOKHAVEN SCIENCE ASSOCIATES SR RF & Computer Room Installation Highlights RF Transmitter Installation in Process KSUs, klystrons, waveguide, water manifolds installed Electrical work and check out in process PCW tie-in in process Installation complete early Feb. followed by testing Blockhouse AC power and PPS interlock work to start DI piping complete & pump skid testing in process PCW tied-in to computer room racks Computer room powered & controls testing in process UPSs operational

8 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring RF Photos

9 BROOKHAVEN SCIENCE ASSOCIATES Linac &TL Installation Highlights Linac installation to be complete in Feb. Linac modulator acceptance testing in process All LtB TL P1 magnets & vacuum chambers are installed Cable pulling complete; cable termination in process LtB TL P1 racks 90% wired Dumps installed; balance of shielding being installed Installation of diagnostics & vacuum equipment in process Testing of PPS interlocks in process Testing of other subsystems starting in early Feb. DI system scheduled to be turned over mid-Feb. Linac ARR scheduled for Feb

10 BROOKHAVEN SCIENCE ASSOCIATES LtB TL Photos Dec. 7, 2011 Jan. 11, 2012

11 BROOKHAVEN SCIENCE ASSOCIATES Linac & LtB TL Photos

12 BROOKHAVEN SCIENCE ASSOCIATES Booster Installation Highlights DI piping installation in process (contractor) Cable tray installation in process (BNL) Survey & floor drilling in process First booster delivery arrived (girder pedestals) Second booster delivery in transit (5 magnet/girders) Booster installation work planning in process Planning space for staging & testing Fabrication of girder transport fixtures to start PPS interlock installation to start Girder installation to start in March

13 BROOKHAVEN SCIENCE ASSOCIATES High-Level Installation Schedule Does not include subsystem testing, integrated testing and commissioning Hatched section of SR RF schedule indicates 2 nd RF Cavity Taken from P6 on Jan. 19, 2012 Phase JFMAMJJASONDJFMAMJJASONDJFMAMJJA Pentant 1 Current Baseline Storage Ring RF Injector Pentant 2 Pentant 3 Pentant 4 Pentant 5

14 BROOKHAVEN SCIENCE ASSOCIATES SR RF Installation 2 nd Cavity may be installed during ID installation RF Transmitter, refrigeration system & RF cavities installed by vendor Remaining RF systems installed by BNL Taken from P6 Jan. 19, 2012 Phase JFMAMJJASONDJFMAMJJASONDJFMAMJJAS Mech & Elec Utilities Current Baseline RF Transmitters Low Level RF Liquid Nitrogen System Refrigeration System RF Cavities

15 BROOKHAVEN SCIENCE ASSOCIATES Injector Installation Schedule Taken from P6 on Jan. 19, 2012 BtS Part 2 is not needed for Booster commissioning Phase JFMAMJJASONDJFMAMJJASONDJFM Mech & Elec Utilities Current Baseline Booster RF LtB TL Part 1 Linac Booster LtB TL Part 2 BtS TL Part 1 BtS TL Part 2

16 BROOKHAVEN SCIENCE ASSOCIATES High-Level Installation Schedule Status Installation is approx. 15% complete (baseline called for 43%) Installation is currently 4 months behind schedule; end date has shifted from March ‘13 to July ‘13 Install work and labor profile now have prolonged peak due to shifted work Resource leveling & schedule analysis in process to determine true schedule impact of delayed work & develop plan to mitigate Additional labor (i.e. cable pullers, electrical installers) may need to be added to keep current schedule Schedule may soon be driven by labor and not hardware

17 BROOKHAVEN SCIENCE ASSOCIATES Installation Percentage Complete

18 BROOKHAVEN SCIENCE ASSOCIATES ASD Installation Labor Profile

19 BROOKHAVEN SCIENCE ASSOCIATES Photon Division Installation Hutch installation contact established The current schedule for hutch construction is: Cell 23 (CSX) – Mar ’12 Cell 28 (XPD) – May ’12 – June ‘12 Cell 3 (HXN) – Mar ’12 – May ‘12 Cell 5 (SRX) – July ’12 – Aug ‘12 Cell 10 (IXS) – Sep ’12 – Oct ‘12 Cell 11 (CHX) – Oct ‘12 – Dec ’12 Cleared necessary space on experimental floor Moving of utilities causing interference in process Hutch survey in process Working planning in process

20 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing Planning Testing of the subsystems through the control system w/o beam Will be performed by pentant or even cell Task force leader named (G. Ganetis) Schedule has been updated & resource loaded Test applications are being developed for control, monitoring, long term logging, and alarming Focusing on getting infrastructure in place to start Integrated testing scheduled to start in April ‘12 in P1 (Cell 25)

21 BROOKHAVEN SCIENCE ASSOCIATES Challenges Finding ways to makeup time in schedule Coordinating multiple activities & teams during installation Coordinating to avoid interferences between systems Adapting to component delivery delays Space for work is limited, especially in linac & booster Spike to occur in required installation labor Significant schedule float has been reduced Tight coordination with PD & CFD needed to avoid conflicts Moving material during & after hutch installation

22 BROOKHAVEN SCIENCE ASSOCIATES Summary Linac & LtB TL P1 installation complete in Feb. for ARR Installation very advanced in P1; working on completion of 1 st cell Installation progressing in P2 and starting in P3 Focus will return to P1 (starting at cell 25) after linac installation Preparing for the start of booster installation Currently 4 months behind schedule Schedule & labor analysis in process Working with PD to prepare for the start of their installation Integrated testing planning in process

23 BROOKHAVEN SCIENCE ASSOCIATES Acknowledgements A. Boerner, M. Bromfield, A. Byon, S. Buda, R. Chmiel, L. Dalesio, L. Doom, O. Dyling, M. Fallier, R. Fliller, G. Ganetis, E. Golnar, D. Hatton, H. Hseuh, S. Hoey, E. Johnson, F. Lincoln, T. Mendez, J. O’Malley, S. Ozaki, P. Ribaudo, J. Rose, S. Sawch, T. Shaftan, W. Scheuerer, S. Sharma, R. Sikora, O. Singh, J. T. Tanabe, G. Visnefsky, W. Wahl, F. Willeke, P. Zoccoli & many others