Assessment of Large-Scale Marine Energy Deployment 1/17 Economic Assessment of Large- Scale Wave Energy Deployment.

Slides:



Advertisements
Similar presentations
6 december 2012 Cost reduction offshore wind conference Ernst van Zuijlen / Chris Westra 6 december 2012.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Load Impact Estimation for Demand Response Resources Nicole Hopper, Evaluation Manager July 14, 2009 National Town Meeting on Demand Response and Smart.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
A 2030 framework for climate and energy policies Energy.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Engineering Economic Analysis Canadian Edition
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Calvin College Wind Energy Project Engineering 333, Fall 2006 Calvin College Wind Energy Project Engineering 333, Fall 2006 To demonstrate Calvin’s interest.
1 © 2009 Electric Power Research Institute, Inc. All rights reserved. Ocean Wave Power/Energy Economics Roger Bedard/EPRI September 17, 2009 A Wave Power.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Wave Energy Technologies: Criteria for Success
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Copyright notice General presentation Siemens Wind Power Reliability Assessment and Improvement through ARM Modeling Poul Skjærbæk, Thomas Mousten, Henrik.
Opportunity Engineering Harry Larsen The Boeing Company SCEA 2000 Conference.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
The Economics of Marine Renewable Energy Peter McGregor Fraser of Allander Institute, Department of Economics, University of Strathclyde Second Forum on.
The Energy Challenge Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego November 7, 2007.
Nonaxial Wind Turbines A New Class of Wind Turbines By Mike Fallwell.
1/12 School of Mechanical Aerospace & Civil Engineering, University of Manchester HMRC Marine Energy Economics Workshop 28 th Jan 2011 Tim Stallard School.
Aquatic Renewable Energy Technologies (Aqua-RET) 2 Workshop Vocational Training in Marine Renewable Energy Technologies 3 rd International Conference on.
Demand Response – A New Option for Wind Integration ?
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
WLI REGIONAL KNOWLEDGE EXCHANGE WORKSHOP ON DECISION-SUPPORT TOOLS AND MODELS SEPTEMBER, 2013, JERBA, TUNISIA Economic analysis of improved water.
Operation and sizing of energy storage for wind power plants in a market system Magnus Korpås Norwegian University of Science and Technology (NTNU) Contents:
Economics of Alternative Energy Sources and Globalization Nov Orlando, Florida The Economic Feasibility of Bio-energy Generation for Peak Demand.
Working with Uncertainty Population, technology, production, consumption Emissions Atmospheric concentrations Radiative forcing Socio-economic impacts.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
1 IRENA – M ARTINIQUE C ONFERENCE ON ISLAND ENERGY TRANSITIONS Workshop C : Wind resources and technologies for islands W IND MEASUREMENTS ON I SLANDS.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
Cost trends for Offshore Wind - and a look at the resources David Milborrow
Wolf-Gerrit Früh Christina Skittides With support from SgurrEnergy Preliminary assessment of wind climate fluctuations and use of Dynamical Systems Theory.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Engineering Economic Analysis Canadian Edition
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
Filename.ppt1 The Pursuit of Economic Ocean Energy A Utility Perspective John Fitzgerald Technology Manager ESBI Ocean Energy.
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
Incorporating Quality of Service into Incentive-based Regulation Juan Rivier Florence School of Regulation Workshop Improving.
CTMS Annual Retreat 2009 “Making connections” Dalia Patino Echeverri, Assistant Professor of Energy Systems and Public Policy Nicholas School of the Environment.
Wind Turbine Design Methods
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
Job number/BT/ serial number/ page number 008 BA003 1 Some thoughts on the cost of wind energy Andrew Garrad Garrad Hassan and Partners Cost effectiveness.
An Overview of the Technology and Economics of Offshore Wind Farms
Photovoltaic Systems: Market Drivers, economics and opportunities Lyndon Frearson General Manager CAT Projects.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Marine Energy, Scotland and the EU Professor Ian Bryden Chair of Renewable Energy The University of Edinburgh.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Analysis of 500MW of Wave Energy on the All Ireland Market Mr. Paul Deane, Dr. Gordon Dalton, Dr. Brian O’Gallachoir Economics of Ocean and Marine Renewable.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Variable Load on Power Stations
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
IMPROVEMENT OF LARGE-SCALE INDUSTRIAL AUTONOMY BY IMPLEMENTING ENERGY STORAGE TECHNOLOGIES Nicholas Dodds Victor Gandarillas Richard Heelis Andrew Lyden.
E.I. Konstantinidis, D.G. Kompolias and P.N. Botsaris Democritus University of Thrace School of Engineering Department of Production Engineering & Management.
Measuring the potential value of demand response using historical market data International Energy Workshop Venezia, June 2009 Graziano Abrate, University.
An evaluation of power performance for a small wind turbine in turbulent wind regimes Nicholas J. Ward Ph.D. Student, Energy Engineering Advisor: Dr. Susan.
Top-down models of operating and capital expenditure.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
RENEWABLES AND RELIABILITY
Power curve loss adjustments at AWS Truepower: a 2016 update
Allegheny Power Residential Demand Response Program
Center for Advanced Life Cycle Engineering (CALCE)
Dublin Valuation Conference The Valuation Process – Solar Energy Farms
The ISLES Project Bob Hanna
Sioned Evans Jim Poole Keith Williams
THE STUDY OF SOLAR-WIND HYBRID SYSTEM PH301 RENEWABLE ENERGY
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
U.S./European Cost Comparison Study Preliminary Results
Presentation transcript:

Assessment of Large-Scale Marine Energy Deployment 1/17 Economic Assessment of Large- Scale Wave Energy Deployment HMRC Marine Energy Economics Forum Monday 13 th June 2011 Dr Tim Stallard School of Mechanical, Aerospace and Civil Engineering University of Manchester.

Content Background Economic Assessments of Wave Energy Projects The EQUIMAR protocols Attaining a levelised cost of €50/MWh –Implications for expenditure Site & device considerations –Expenditure per device –Idealised devices –Site accessibility Summary Assessment of Large-Scale Marine Energy Deployment 2/17

Marine Energy Cost Estimates Assessment of Large-Scale Marine Energy Deployment 3/17 CAPEX & Cost of Electricity (COE) estimates from 14 publications 2001 – Includes ‘Wave’, ‘Tidal-Stream’ & ‘Marine’ - Pre 2010 data adjusted by 3% per annum. - All years, exchange rate 1.65US$ = 1GBP. COE reduction typically inferred by Learning Curve approach.

Economic Assessments Facilitate fair comparison of alternative marine technologies for large-scale deployment. (e.g. 100 MW farms) To provide a summary measure of economic viability of an energy generating option to allow comparison to alternative options. Economic Assessment of a Project - Standard procedure for determining economic indicators - Identify the underlying processes that influence cost and revenue - Account for uncertainty consistent with the level of development To provide comparison between electricity generating options (e.g. between individual wave or tidal technologies). Economic Assessment of a Technology - Quantify limits to performance and to cost reductions - Quantify range of possible cost variations A B Assessment of Large-Scale Marine Energy Deployment 4/17

Marine Energy Project Assessment Assessment of Large-Scale Marine Energy Deployment 5/17 Net Present Value indicates viability. Also assess project specific risks: Identify: Factors, or events, that could: - alter the quantity or unit cost of an expenditure item or - alter the magnitude or value of energy production. Quantify: The impact of these factors on the measures of economic viability. Mitigate: Explain measures taken to limit each risk.

EquiMar Protocol IIIA 1. Capital Expenditures 4. Risk Assessment 2. Operating Expenditures 3. Revenue 5. Project Assessment Objective / Process / Method for each stage Identifies: - major items of capital expenditure (excluding device component costs) - factors that affect periodic expenditures - factors that affect revenue Describes: - framework for assessing project risks Economic assessment produces: - a summary measure of viability (NPV) - a description of risks that would alter the outcome of the assessment. Assessment of Large-Scale Marine Energy Deployment 6/17

Expenditure: to attain €50/MWh Assessment of Large-Scale Marine Energy Deployment 7/17 Project generates average output of 100 MW. Require NPV of Revenue > NPV of all Expenditures

Expenditure: Site Specific Assessment of Large-Scale Marine Energy Deployment 8/17 36 kW/m 35 kW/m 5 kW/m 15 kW/m 27 kW/m 15 kW/m 10 kW/m 49 kW/m Sea-state scatter plots for 8 sites (HSE, 2001)

Expenditure: per Device Assessment of Large-Scale Marine Energy Deployment 9/17 Number of devices in farm: dictated by power output per device Type I: Tuned to all frequencies Type II: Tuned to site peak frequency Z P Point Absorber Limit

Expenditure: per Device Assessment of Large-Scale Marine Energy Deployment 10/17 Device: Optimal output at peak period Resource: HSE (2001), 8 sites All projects COE = 50 €/MWh Cable: site to shore transmission estimates based on distance & rated power (Boehme et al., 2006) OPEX: 3% CAPEX (assumed) OPEX: 8% CAPEX (assumed) Number of devices in farm: dictated by power output per device Type I: Tuned to all frequencies Type II: Tuned to site peak frequency OPEX: Sensitive to site-accessibility? Point Absorber Limit CAPEX per device < ~ €0.70 – 1.5 M

OPEX: site & device dependent Assessment of Large-Scale Marine Energy Deployment 11/17 Vessel cost for installation and maintenance: large, uncertain expenditure -Site dependent: distance to site, duration of operational conditions -WEC dependent: frequency of failure, duration of work -Vessel dependent: speed, rental cost, operational conditions -If all devices similar reliability e.g. 1 maintenance visit per device per annum VesselCost ~ (T Transit + T Activity + T Waiting ) Rate VesselCost = (T Available ) Rate

Monthly (in)accessibility Assessment of Large-Scale Marine Energy Deployment 12/17 If vessel requires: Hs < 2.0 m: 1 to 2 days for each day of operational conditions Wave Site Average power ~ 23 kW/m From statistical analysis of monthly scatter plots. Weibull method, BMT (2003) Tidal Site, U MAX ~ 2.5 m/s From time-series analysis of 1-decade of wind, wave and current speed data. Hs < 1.5 m: 1 to 3.5 days for each day of operational conditions

Access Constraints: Tidal Site Assessment of Large-Scale Marine Energy Deployment 13/17 Installation whilst U c < 1.33 m/s 28 devices (~ 14 MW) in six months 100 MW capacity if install 7 devices per 24 hr window Installation whilst U c < 1.13 m/s 15 devices (~7.5 MW) in six months 100 MW capacity if install 14 devices per 24 hr window Number of installations per Month

Access Constraints: Wave sites Assessment of Large-Scale Marine Energy Deployment 14/17 Average waiting required for 1-day and 2-day weather windows ( H s < 2 m) Wave power density (very approx.) kW/m For site Hs > 2 m, 3+ days extra vessel time required for each day of operation

Vessel Expenditure Assessment of Large-Scale Marine Energy Deployment 15/11 €10k/day: 1.0% to 2.5% CAPEX €20k/day: 1.5% to 3.5% CAPEX Device: Optimal output at peak period Resource: HSE (2001), 8 sites All projects COE = 50 €/MWh Cable: site to shore transmission estimates based on distance & rated power (Boehme et al., 2006) OPEX: Vessel Cost only… 1 day maintenance per device Site-to-shore transit time Site specific waiting time €50 / MWh IF CAPEX per device < ~ €2.25 M (sites with kW/m) CAPEX per device < ~ €1 M (sites with kW/m)

Summary Project assessment: –Summary measure for project comparison: Net Present Value (NPV) –Must also identify risks and mitigate Expenditure that allows COE < 50 €/MWh –CAPEX less than £1.2M / MW approx. –Vessel expenditure includes 2 – 6 days waiting per day of use. –CAPEX per site-tuned device less than: site WECVessels only8% opex kW/msite-tuned, €1 M€0.6 M kW/msite-tuned, €2.25 M€1 M Single point absorber devices considered. Assessment of Large-Scale Marine Energy Deployment 16/17

Further Information D7.3.1: WEC support structure design & cost study (ODE) Stallard, Harrison, Ricci and Villate. Economic Assessment of Large- Scale Marine Energy. 8 th EWTEC, D7.3.3: Review of cost reduction processes D : Analysis of site access constraints Economic Assessment of Marine Energy Projects. Chapter IIIA, The EQUIMAR Protocols, Ed. Smith et al –Including risk assessment to identify factors that would change outcome of Project Assessment Also see: Assessment of Large-Scale Marine Energy Deployment 17/17

Notes Assessment of Large-Scale Marine Energy Deployment 18/11

Risk & Mitigation Assessment of Large-Scale Marine Energy Deployment 19/11 Factor / EventMitigation Energy production below predictions - Resource different to predictionsResource Accuracy (I.A) - Performance below prediction in known conditions. Testing II.A – II.C (developer), Warranty to specification (investor). Availability below prediction - Severity of resource extremesResource Accuracy (I.A) - Lower reliability than predictedTesting II.A – II.C (developer), Warranty to specification (investor). Value of generated electricity lower than predicted Inaccurate prediction of outputTesting II.A – II.C (developer), Warranty to specification (investor). Market value (€/kWh) changesRisk for all projects over same period Incentives (e.g. political) e.g. Revenue risks

Cost Changes: Infrastructure Assessment of Large-Scale Marine Energy Deployment 20/11 Scale of project (projects at the same time) –Supply of station keeping structures –Vessel use Elapsed time (projects at different times) –Procurement and process costs Experience of technology (projects at different scale of sector development) –Standardisation, process efficiency

CAPEX and expected reductions with increased project scale Capital Cost Assessment of Large-Scale Marine Energy Deployment 21/11 TOTAL Reduction: A: -20.6% B: -9.7% C: -18.0% D: -10.5% Source: Equimar workshop & Survey, 2008/9 -50% -30% +5%