Construction Quality Management Metro Goldline Eastside Extension Los Angeles January 19, 2007 ASCE Construction Institute Conference.

Slides:



Advertisements
Similar presentations
CRI- Common Review Initiative Reducing Lender Review Redundancy.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Checking & Corrective Action
Managing a Successful Mechanical System project Following design – what next?
More CMM Part Two : Details.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Dec. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
1 School Year 2006–07 Accounting and Budgeting Committee Video Teleconference Kim Thompson OSPI - School Apportionment and Financial Services
The ISO 9002 Quality Assurance Management System
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
ISO 9000 Certification ISO 9001 and ISO
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Grants Management Port Authority of Allegheny County As presented at TFLEX Conference August 20, 2002.
Project Update & The Success of the Integrated Project Management Office Metro Goldline East Extension Los Angeles January 19, 2007 ASCE Construction Institute.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
Skanska Scholarship at University of Portland Skanska USA
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review.
UDOT I-15 The Point Design-Build Project
Setting up an Internal Audit Program By
State Program Review Process Presented by GSFC Compliance Team.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Dulles Metrorail Safety Complaint National Fraud Awareness Conference on Transportation Infrastructure Programs July 27, 2010 Rodolfo Pérez, P.E. Engineer.
Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Jan. 21-3:00PM | ROOM 1E-113.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
Presented to: By: Date: Federal Aviation Administration Quality and Standards Team (QST) In-Service Management Gold Standard ATO Acquisition Practices.
Agency Construction Management :CM NOT AT-RISK
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Oregon State Contractor Program Jason Linnell Executive Director Presented By: E-SCRAP 2008 ○ CONCURRENT SESSION D National Center for Electronics Recycling.
Research Administration Forum Changes to NSF & NIH Proposal Submission and Award Documents December 8, 2015.
Transit Facility Development: Lessons Learned. Overview Vision Project Size & Scope Funding Approach Concept Design Project Delivery Validation Efforts.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Quality Standards ISO:9000 ISO:9000 Quality Systems Under ISO:9000 Quality Systems Under ISO:9000 ISO:14000 ISO:14000 ISO Certification Process ISO Certification.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Green Line Extension Project
DOECAP Laboratories Phased Audits U. S
A New Quality Program for the Water Industry
What is the UL QFCP? FCIA Webinar Presenters:
Project Development Quality Program QA/QC – What does ODOT need?
Community Development Department
QA Reviews Lecture # 6.
Presentation transcript:

Construction Quality Management Metro Goldline Eastside Extension Los Angeles January 19, 2007 ASCE Construction Institute Conference

The MGLEE Project The MGLEE is a six-mile, dual track light rail transit system extending the Pasadena Gold Line from Union Station to East Los Angeles. This $898 million project consists of elevated guide way, at-grade segments, 1.7 miles of twin tunnels, 2 portals, 6 at-grade stations and 2 underground stations. The MGLEE is a six-mile, dual track light rail transit system extending the Pasadena Gold Line from Union Station to East Los Angeles. This $898 million project consists of elevated guide way, at-grade segments, 1.7 miles of twin tunnels, 2 portals, 6 at-grade stations and 2 underground stations.

MGLEE Alignment

MGLEE Time Line  Project was initiated in 2001 Environmental & Preliminary Engineering phaseEnvironmental & Preliminary Engineering phase  Final design and contract packaging in 2003  Construction contracts awarded in 2004  Construction currently more than 50% complete  Revenue Operating Date is December of 2009

Project Quality Program Requirements  Origins in FTA QA/QC Guidelines  Design/Bid/Build - Tunnels & Station/Portal Excavations Traditional 16 element prescriptive programTraditional 16 element prescriptive program Used on prior LACMTA projects with successUsed on prior LACMTA projects with success Metro wished to maintain direct control of tunneling operationsMetro wished to maintain direct control of tunneling operations  Design/Build – At grade, stations, track work & systems Design-Builder to develop/implement a program consistent with Metro program requirementsDesign-Builder to develop/implement a program consistent with Metro program requirements Use of an existing program tailored to project requirements acceptableUse of an existing program tailored to project requirements acceptable

Quality Program Elements  Project Quality Organization  Design Control -n/a for D/B/B  Instructions, Procedures and Drawings  Document Control  Procurement Control  Process Control  Control of Special Processes & Job Control Testing  Inspection and Test  Handling, Shipping, Storage and Preservation  Quality Records  Quality Audits & Surveillances  Access to Work Areas  Respond to MTA Nonconformance Reports  As-built Documents  Readiness Review  Construction Work Plans

Quality & the Design Development Process Surveillance of the Design Process  LACMTA full participation in inter & intra discipline check & back check processes  Verify compliance with approved Design Control Procedures  Monitor comment tracking and resolution  Periodic Design Surveillance reports to project management

Project Oversight and Surveillance Audits  Periodic & Scheduled  “Open Book Test” Philosophy  Single or Multi-Elemental  Full Program Scope Annually  Team Approach Non-IPMO assigned Sr. Quality EngineerNon-IPMO assigned Sr. Quality Engineer Site-Assigned Sr. Construction InspectorSite-Assigned Sr. Construction Inspector Design-Builder’s Quality EngineerDesign-Builder’s Quality Engineer

Project Oversight and Surveillance Audits – continued  Enhanced effectiveness  Unbiased & independent assessment  Coupled to Site/Issue Familiarity  Minimizes “adversarial” interaction  Reduced administrative load  Fewer findings/faster resolution  Minimizes staff needs

Project Oversight and Surveillance Surveillance  Construction Multiple daily site visitsMultiple daily site visits Keyed to 3 week look-ahead scheduleKeyed to 3 week look-ahead schedule In accordance with:In accordance with: Approved plans and submittals Approved plans and submittals Approved construction work plans (CWP’s) Approved construction work plans (CWP’s) Weekly Surveillance Reports to project managementWeekly Surveillance Reports to project management Includes multiple color digital photographs of work in progress Includes multiple color digital photographs of work in progress

 Weekly Surveillance Reports of Work-in-Process Also used for offsite subcontracted work/materialsAlso used for offsite subcontracted work/materials  Provided to Project Management and affected parties  Consistent summary of requirements and work compliance to approved submittals Surveillance Report

Surveillance Report Continued  Documents changing status of issues and contractor actions “Daily Diary” approach“Daily Diary” approach  Color digital photographs Helps reader translate narrative into understandable imagesHelps reader translate narrative into understandable images  Permanent electronic record of work progress of work progress

Project Oversight & Surveillance Verification Test Plan  Verifies accuracy & effectiveness of Contractor test program & results  Performed by labs under contract to LACMTA  Testing to coincide with contractor’s or thereafter  Performed at RE/PQM discretion & per plan

Project Oversight & Surveillance Verification Test Plan – continued  Structural Concrete  NDE of Weldments  Backfilling Operations

Summary  An experienced, quality-minded Contractor is key  Place focus on “the few” vs. “the many”  No substitute for interpersonal relationships PartneringPartnering Co-locationCo-location  Benefits: High level of complianceHigh level of compliance Eliminate adversarial interactionsEliminate adversarial interactions Reduced administrative workloadReduced administrative workload Minimized staffingMinimized staffing